| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC VPO BARI TEHSIL GANAUR SONEPAT 131101 | SONEPAT | SONIPAT | HARYANA | 131101 | ₹5.3 Cr | L1 | Accepted-AOC L1 AGENCY |
| 2 | L2₹5.5 CrRejected-Finance 796 AZAD NAGAR ROORKEE DISTT HARIDWAR UK | HARIDWAR | UTTARAKHAND | 247667 | ₹5.5 Cr | L2 | Rejected-Finance WORK ALLOTTED TO l1 |
| 3 | L3₹5.9 CrRejected-Finance | ₹5.9 Cr | L3 | Rejected-Finance WORK ALLOTTED TO l1 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹11.2 L
Closing Date
27 Nov 2020, 3:00 pmClosed
Executive Engineer P-1 sonepat
Executive Engineer P-1 sonepat
Improvement By Providing Widening and Strengthening of Chidana Samri Bajana Road Upto Moi Majri Road in Sonepat Distt. (Road ID-6216) UNDER NABARD SCHEME RIDF-XXVI (Re-invited)
2020_HRY_150839_1
PWD/SE/SNP/113885
Open Tender
Civil Works
273 days
SONEPAT CIRCLES
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹11.2 L
Yes
5 Jan 2021
17 Nov 2020
27 Nov 2020
17 Nov 2020
27 Nov 2020
17 Nov 2020
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks for safe disposal with all leads and lifts complete in all respects. Note: - i). The quantity of milled bituminous mix material shall be a recovery item.
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing (i) dry brick work {HSR 8.5 (i)}
Earth work excavation in ordinary soil exclusive of compensation of earth, Kassi work undressed involving an average horizontal throw upto 2 metres, and an average vertical lift upto 0.5 metre including breaking of clods (HSR 6.2 (b) and recompact the same including laying dressing, watering & rolling as per HSR 6.2 g-I, g-II and g-v.
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note:- In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 150mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading –VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying 300mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing and applying primer coat with bitumen emulsion (S.S grade-I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Pdg & laying 50mm BM using the reclaimed material to the extent of 30% of the required quantity, hauling and stockpiling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in 100-120 TPH batch type hot mix plant, with appropriate arrangement for use of R.A.P., transporting and laying at site with hydraulic paver finisher with sensor control to the required grade and compacting to the required grade level and thickness with appropriate rollers all as specified in clause 519 (5th Revision) of 2013 using bitumen VG-30. (minimum Bitumen's 3.40% i/c bitumen of retrieved material as per job mix formula). Note: - 1. The milled material to be used in BM shall be minimum 80% of the theoretical quantity. 2. If bitumen required more than 3.40% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. 3. Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and Laying 50 mm thick Compacted bituminous macadam in (BM) in one layer by 100-120 TPH batch type hot mix plant and paver finisher with sensor control to the required grade as per clause No. 504 table No. 500-4 of MoRT&H specification for road and bridge works (5th Revision) of 2013 using minimum 3.4 % bitumen grade VG-30 as binder content by weight of total mix, complete in all respects i/c cost of bitumen, instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required on this account is more than 3.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. i/c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Providing and laying ‘B’ type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (NS).
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use.
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Dismantling of existing CC block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or desired by Engineer (NS)
Providing and laying 80mm thick interlocking paver blocks ISI marked (IS code: 15658:2006) of all shapes and colours in design mix cement M-40 as per IRC:SP:63-2004, over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Relaying old CC blocks over 25 mm thick fine sand including transportation from road side where stacked excluding cost of CC blocks and complete in all respect as per specifications (NS)
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 320 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position on end edging of interlocking paver blocks on both sides.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides. (of reputed make such as Array Dennison/3M)
Providing and fixing of shoulder mounted sign boards of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC: 67-2012 type IV HIP specification fixed on 3mm thick Aluminum composite panels as base board with pressure-sensitive adhesive having 0.5mm thick Aluminum on both sides supported on Mild steel pipe post 80mm NB medium class 4mm thick embedded M-20 grade concrete foundation of size 450mmx450mmx600mm, complete as per drawings, Technical specifications and as directed by Engineer-in-Charge. (i) 600mm Circular
600mm Equilateral Triangle.
Reinforced Cement Concrete 1:2:4 studs of standard design, fixed in position, i/c finishing with exterior paint & primer coat & one 100mm wide retro reflective prismatic band consisting of 3mm ACP having high intensity micro prismatic sheeting confirming to IRC: 67:2012 on it duly fixed with 5 numbers 2” long screws with roller plug complete in all respect as per drawing in Section-9.
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Reinforced cement concrete 1:2:4 Kilometer Stone of standard design, fixed in position, including finishing and painting (HSR 10.129 + 16.75 (bii) (ii) ordinary Kilometer stone
Reinforced cement concrete 1:2:4 Kilometer Stone of standard design, fixed in position, including finishing and painting (HSR 10.129 + 16.75 (bii) (i) 5th Kilometer stone.
Reinforced cement concrete 1:2:4 Boundary Pillars of standard design, fixed in position, including finishing but including painting (HSR 10.131 + 16.74 b)
Reinforced cement concrete 1:2:4 200m stone of standard design, fixed in position, including finishing but including painting (NS)
Reinforced cement concrete 1:2:4 village board of standard design, fixed in position i/c finishing but including painting (HSR 10.130 + 16.76 b)
Earth work in excavation in foundations, trenches, etc. in all kind of soil, not exceeding 2 metre depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonary, in 15 cm layers with campactino, including disposal of all surplus soil, as directed within a lead of 39 metres (HSR 6.6)
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth (HSR 10.41)
Cement Concrete 1:1½:3 with stone aggregate 20 mm nominal size in 1st storey upto 4 metre above plinth level (HSR 10.60)
Design mix cement concrete of grade M-15 with minimum cement contents 240kg/cum in foundation and plinth (HSR 10.64)
Providing & fixing in position machine batched and machine mixed designmix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approve design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability as per direction of Engineer-in-charge in foundation & plint. (Note: Cement content considered in this item is @ 330 Kg/Cum) (HSR 10.66)
Providing & fixing in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approve design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability as per direction of Engineer-in-charge in foundation & plint. (Note: Cement content considered in this item is @ 350 Kg/Cum) (HSR 10.68)
Providing & fixing in position machine batched and machine mixed designmix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approve design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability as per direction of Engineer-in-charge in first storey upto 4 meters above plinth level. (Note: Cement content considered in this item is @ 330 Kg/Cum) (HSR 10.73)
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping to concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-Charge in first storey upto 4 meters above plinth level. (Note Cement content considered in this item is @ 340 Kg./cum) (HSR 10.74)
Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping to concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-Charge in first storey upto 4 meters above plinth level. (Note Cement content considered in this item is @ 350 Kg./cum) (HSR 10.75)
Providing and laying in position machine batched and machine mixed design mix M-40 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping to concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-Charge in first storey upto 4 meters above plinth level. (Note Cement content considered in this item is @ 360 Kg./cum) (HSR 10.76)
First class brick work laid in cement sand mortar1:5 in foundation and plinth. (HSR 11.3)
Extra for making tapered surface of brick masonry (HSR 11.99)
Cement pointing 1:2 deep variety on brick and tile work. (HSR 15.60)
Striking joints in lime or cement on brick and tile walls (HSR 15.69a)
Steel reinforcement TMT bars FE-500 EQR / FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respect for all heights / depths / storeys / basements etc. (HSR 18.22) Note:- Reinforcement shall be measured in length including hooks, if any, seperately for different diameters as actually used in work, excluding overlaps, wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be including in the rates for reinforcement.
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Providing weep holes in brick masonry / Plain / Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV :20H towards outer face. Complete as per drawing and technical specifications as per clause 2706 & 2200 of MoRT&H specification (N.S)
Back filling involving excavation of local sand, carriage with an avg. lead and lift with in 5 km, filling in 25 cm layers watering & compacting complete to the entire satisfaction of Engineer incharge (Based on HSR)
Providing and fixing hand rail over the crash barrier kerb consisting of MS base plate, embedded fasterner and nuts. MS vertical plates and pipes etc, as shown in the drawings and as per specifications and painting the same with 3 or more coats of paints. All the railling components as mentioned above to be hot dip galvanised with a zinc coating of at least 175 gm/sqm. Item to include all incidental works required to complete the work as per the directions of the Engineer-in-charge. (N.S)
Providing and laying 25mm thick mastic asphalt wearing course with paving grade bitumen 30/40 meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515. (NS)
Drainage spouts complete as per drawing and techincal specification as per clause 2705 of MoRT&H specification (N.S)
Providing and fixing in position 20mm thcik premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10m to cater for a horizontal movement upto 20 mm covered with sealant complete as per drawing and technical specification as per clause 2605 of MoRT&H specification (N.S)
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade (HSR 16.3)
Applying priming coat with metal primer on new steel or iron work including preparation of surfaces (HSR 16.9)
Shuttering for faces of concrete foundation and foundation beams (vertical or battering) (HSR 9.13)
Centring and shuttering for faces of walls, partitions, retaining walls, well steining and the like (vertical or battering) including attached pilasters, buttresses etc. (HSR 9.5)
Centring and shuttering for flat surfaces such as suspended floors, roofs, landins, chhajjas, shelves etc. inlination not exceeding 25 degree with horizontal (HSR 9.1)
Construction of embankment and sub grade with soil of minimum CBR 8 % (4 days soaked) of obtained from borrow area with any lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The finished road surface will be as per X-section approved by engineer with respect to GTS. In case the quantity of earth work calculated with NSL and finished level found to be less than 538.36 cum. Then actual quantity (less than 538.36 cum) will be paid. In case quantity worked out is more than 538.36 cum, then only 538.36 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached section-9 of DNIT. Note: If soil of CBR 8% is not available then the agency will do appropriate stabilization as per IRC –SP-89-2010 as approved by SE-in-Charge and nothing extra shall be paid on this account and it will be incidental to work. No earth work will be allowed from PWD land
Dry brick on edge paving sand grounted over 50mm thick earth and mud plaster (HSR 14.20)
Maintenance of Earthen shoulder (Filling with fresh soil) Making up loss of material irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment (Based on HSR)
Earth work excavation in ordinary soil exclusive of compensation of earth (b) Earth wrok undressed with a combined lead upto 60 metres including breaking of clods (HSR 6.2 (b) + ( C) (i) )
First class brick work laid in cement sand mortar 1:3 in foundation and plinth. (HSR 11.5)
First class brick work laid in cement sand mortar 1:3 in first storey upto 4 metres above plinth level. (HSR 11.10)
Providing & Laying reinforced cement concrete pipe NP4 prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and mansonry work in head walls and parapets as per MoRT&H specification 2900 (N.S)
Cement pointing 1:3 deep variety on brick and tile work (HSR 15.61)
Dismantling concerete plain 1:2:4 (HSR 8.1 b)
Dismantling of concerete plain 1:2:4 (HSR 8.6D)
Dismantling of with cleaning and straightening and cutting of bars if required RCC (HSR 8.6E)
Dismantling lime Concrete (HSR 8.6 A)
Removing all types of Hume pipe and stacking with in a lead of 1000 metres including earthwork and Dismantling of Masonry works as per MoRT&H specification no. 202 (N.S)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bricks @ Rs. 4.50/- Each
old Steel @20 Per Kg
Brick bats @ Rs. 450/- per cum
1st year Maintenance as per general condition of contract data.
2nd year Maintenance as per general condition of contract data.
3rd year Maintenance as per general condition of contract data.
4th year Maintenance as per general condition of contract data.
5th year Maintenance as per general condition of contract data. Item No. 74-78 Note:-The bidder is not required to quote his rate for routine maintenance. The rates of routine maintenance as indicated in the bill of quantities are to be considered for financial evaluation and determining L-1 contractor irrespective of rates quoted by the contractor. If the rates quoted by the contractor differ from fixed rates, then it will not be considered and base rates as fixed in the DNIT will be considered. However, the total amount of L-1 will not be increased from the total amount quoted by the contractor and rebate to that extent shall have to be given by the contractor, Further the payment for routine maintenance to the contractor shall be regulated based on his performance of maintenance activities as per chapter eleven of rural road in manual (IRC-SP-20-2002) Note:- i) In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable. ii) In case of any difference in the unit of any non-schedule items depicted in this DNIT and the conventional unit of that N.S. item as per prectice in this department, the conventional unit as per practice shall be applicable.
M/s ajit Construction co
rameher contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid