Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹21.1 L+₹1.1 L (5.64%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹21.2 L+₹1.3 L (6.53%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹21.3 L+₹1.4 L (6.91%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹29.7 L+₹9.7 L (48.7%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
₹25.0 L
EMD Value
₹50,000
Closing Date
14 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer LSGD Sub Division Mannarkkad Bl
Mannarkkad Block Panchayath
Construction of vanitha hostel above vanitha industrial complex in vattambalam of Kumaramputhur GP
2023_LSGD_563606_1
16/AE/MKDBP/22-23
Open Tender
Civil Works - Buildings
Item Rate
180 days
LSGD Sub Division Mannarkkad Block Panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
Mannarkkad Block Panchayath
29 Mar 2023
4 Mar 2023
16 Mar 2023
4 Mar 2023
14 Mar 2023
4 Mar 2023
4 Mar 2023
Amount
building
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
ANSAR. A
V.abdul Latheef
Bidder Name
V.abdul Latheef
ANSAR. A
Abdul Azees T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_830896.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .