Tender ID
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
20 May 2026, 5:30 pmClosed
Shri S C Mehta, General Manager
Annual Rate Contract for Maintenance Activities related to Civil, Carpentry, Plumbing and Sanitary works at Narmadanagar Township
301168
GNFC/TAO/CIVIL/ARC/2026
Open
Civil Works
Fixed-rate
Bharuch
₹2.2 L
5 May 2026
5 May 2026
5 May 2026
20 May 2026
5 May 2026
The quantity is not indicated against any item Schedule of Rates as the
quantum is not fixed and may increase/decrease to any extent during the
contract and the Company shall not be obliged to entertain any complaint or
claim what-so-ever in this regard from the Contractor.
The quantum of work/job would vary/fluctuate depending upon the
requirements/ demands from time to time. The Company reserves its right
not to operate at all or partially operate any of the items of work listed in the
schedule of Rates during the Contract and the company shall not be obliged
to entertain any complaint or claim what-so-ever in this regard from the
Being a residential quarter maintenance work involved, it may happen for
unavailability of work front at planned schedule due to what-so-ever reasons.
The contractor shall attend any assigned complaint thrice (3 times) before
closing. A separate report shall be submitted (preferably in register in
prescribed format) to EIC.
6. PAYMENT TERMS:
6.1 On satisfactory completion of the work, the contractor shall prepare and
submit bill in duplicate along with all relevant and supporting papers for the
respective month to the Engineer-in-charge / Officer-in-charge of the work.
The payment of the bills shall be made on monthly basis by NEFT/RTGS
after usual deduction of applicable taxes and other dues as per the rules.
6.2 The bill will be paid within 30 days provided the same is complete in all
respects. Such payment shall be made after completion of the calendar
month and after submission of a certificate from the Engineer-in-charge /
Officer-in-charge duly recommended by him to the effect that the work
carried out by the contractor during the month is as per the contractual
obligations and to the entire satisfaction.
6.3 The payment of running bills/final bill by the Company shall not have any
linkage with the payment of wages and other dues to be made by the
contractor to his deployed manpower. In other words, the contractor shall
discharge from time to time his liabilities for payment of wages and other
dues to his deployed manpower irrespective of receipt of payment of running
bills/final bill from the Company.
6.4 The final bill should be submitted along with documents such as "No
Objection Certificate" from our HR and Security Departments and No Claim
Certificate from you.
6.5 The payment towards the Final Bill will be released after 90 days of
submission of the Final Bill / Completion of the defect liability period.
6.6 In case the Contractor abandons the site during the currency of the contract,
no payment what-so-ever shall be released even for the partial work that
might have been done by the Contractor. The company shall have also right
to forfeit the amount of Security Deposit.
7. TAXES AND DUTIES:
Bidder to clearly mention all applicable taxes and duties in Schedule of
Rates, on supply of goods and / or services to be made.
8. SECURITY DEPOSIT :
In the event of award of Contract, the successful Bidder will submit Security
Deposit at rate of 7% of contract value incl. GST after rounding up to next
thousands in the form either a Demand Draft in the favour of the Company,
payable at Bharuch or in the form of one Single Bank Guarantee in
prescribed format of GNFC from Nationalized Bank only and / or Bank
approved by GNFC or through NEFT to company account, Contractor shall
furnish Bank Guarantee (BG) in GNFC’s standard ready-made format only,
which shall be valid till faithful execution of contract plus 3 months claim
period for an amount equivalent to 7% of total contract value including taxes
and duties)., within 01 (one) weeks from the date of issue of Work Order/
detailed Contract.
Security Deposit/ Bank Guarantee shall be released after upon satisfactory
performance of the contract and completion of the defect liability period. In
case extension is granted the Contractor shall accordingly furnish SDBG for
further period of Contract.
9. SUB CONTRACTING:
The Contractor shall not assign or transfer whole or part of the contract
awarded, or whole or part of works, services, obligations, responsibilities,
liabilities and rights or give a sub-contract for carrying out all or any of the
work, service, obligation, responsibility, liability and right, to any other person
or party without Company’s prior written consent.
10. ALTERATION IN SCOPE OF WORK:
The Company may at any time(s) before or after the commencement of the
work by notice in writing issued to the Contractor, alter the scope of work by
increasing or reducing the jobs required to be done by the Contractor or by
adding thereto or omitting there from any specific jobs or operations or by
substituting any existing jobs or operations with other jobs and/or operations,
or by requiring the Contractor to perform any extra works in or about the job
site. And upon receipt of such notice the Contractor shall execute the job(s)
as required within the altered scope of work.
11. PERFORMANCE OF THE CONTRACT:
11.1 The Contractor shall arrange to deploy adequate manpower with required
skill & experience to execute the job smoothly, safely & as per the schedule
&/or frequency.
11.2 The Contractor shall deploy supervisor/s for (i) to coordinate with Engineer-
in-Charge / Officer-in-Charge for job execution (ii) assignment of the job & to
pass on instructions to the manpower deployed by the contractor for
execution of job (iii) effective supervision of the job (iv) to ensure that
manpower deployed by the contractor are carrying out the job safely, using
proper safety appliances / wearing proper Personal Protection Equipment,
maintaining peace & discipline & observing safety & security regulations &
instructions. (v) to ensure that manpower deployed by the contractor are not
tampering with or operating any machinery / equipment of the plant.
11.3 The manpower deployed should be engaged for the specific work under the
contract & should not be deployed in other jobs.
11.4 The Company shall have a right to terminate the contract / to split the job / to
get done the work from another agency at the risk & cost of the contractor, if
not deploying adequate manpower / not carrying out the job as per time
schedule / any job is not properly done.
11.5 The contractor shall keep & maintain area neat & clean all the time.
12. CANCELLATION OF CONTRACT:
12.1 The Company shall be entitled at any time at its discretion to cancel the
Contract if, in the opinion of the Company, the cessation of the work has
become necessary owing to any cause, what so ever.
12.2 The Contractor shall not be entitled for any compensation, whatsoever, in
addition to the payment for the work actually performed by the Contractor,
calculated on the basis of the Schedule of Rates.
13.1 The Contractor shall at all times indemnify and keep indemnified the
Company and its officers, servants and agents from and against all
third party claims whatsoever (including but not limited to property loss
and damage personal accident, injury or death of/to property or person
of any Sub-Contractor and/or the servants or agents of the Contractor,
and Sub-Contractor(s) and/or the Company) and the Contractor shall at
his own cost and initiative at all times hereof take out and maintain
insurance policies in respect of all insurable liabilities under Employee’s
Compensations Act 1923 and all other applicable labour laws, including
but not limited to third party insurance and Act. Personal injuries
insurance Act, etc.
13.2 The Contractor shall also at all times indemnify and keep indemnified
the Company and its officers / employee of the company including
Engineer-in-Charge/ Officer-in-charge against all actions, proceedings,
claims, demands, cost & expenses whatsoever arising due to failure of
the contractor in the performance of his obligations under the contract.
13.3 The Company shall not be liable for or in respect of any demands or
compensation payable under any law in respect of or in consequence
of any accident or injury to any workman or other person in the
employment of the contractor or his sub-contractor and the Contractor
shall indemnify & keep indemnified the Company against all such
damage and compensation and against claims, demands, proceedings,
costs, charges & expenses whatsoever in respect thereof or in relation
14. PENALTY FOR DELAY/ DEFAULT:
A. FOR NON COMPLIANCE OF SAFETY RULES: The penalty shall be
imposed for non-compliance as under:
Non wearing of safety shoes: Rs.200.00 per incident per
Non wearing of safety helmet / not using required PPE: Rs.
100.00 per incident per person
B. FOR POOR WORKMANSHIP: As decided by Engineer-in Charge /
Office-in-charge including no payment of claim shall be paid to the
C. Urgent Complaint- Any complaint, having urgent nature due to any kind
of risk involved in opinion of EIC, shall be termed as Urgent Complaint.
Delay in commencement of “Urgent Complaint” beyond 2 days
(including week-off) shall be penalized at rate of Rs. 100 per complaint
D. Regular Complaint- Any complaint assigned to vendor which is not
urgent shall be termed as Regular complaint. Delay in commencement
of “Regular Complaint” beyond 7 working days shall be penalized at
rate of Rs. 100 per complaint per Week.
E. When repairing work for any complaint is commenced by Contractor, it
needs to be continuously attended by deploying required resources
(material and manpower) till completion. If the work is not continuously
attended even after the work front is available, penalty of Rs. 100 per
complaint per week shall be imposed. If the scope of work is changed
during execution of work, it shall not attract penalty till penalty free
period. (2 days for Urgent Complaint & 7 days for Regular Complaint).
The complaint should be completed within 7 days after commencement
of work at site in all cases.
F. Maintenance work for Vacant Quarters shall be completed within
days of handing over keys with list of jobs. Penalty of Rs. 500 per week
shall be imposed if the quarter keys are not handed over after 15 days
from the date of issuance. In case of issuing more than 10 quarters for
maintenance within 15 days, time limit for excess quarters shall be
decided by EIC based on the work quantum related to all quarters and
agreed by vendor. Chronology of quarter shall be based on the receipt
of quarter keys and jobs. If additional job is added during maintenance
period, penalty free period of 15 shall be considered from date of last
award of additional job.
G. Engineer in Charge shall be the authority to waive off the penalty
mentioned in above points (C) to (F) at sole discretion in genuine delay
cases in consultation with Department.
H. Above mentioned days shall be calendar days (including holidays and
PH). 7 days before and after 15 days of Holi & Diwali shall not be
considered for penalty in view of unavailability of manpower. However,
after resumption of these holiday period, penalty shall be applicable as
mentioned in clause (C) to (F). National Holiday like 26th January, 15th
August and 2nd Octo will consider as holidays
I. Submission of running and final bills: - Monthly bills should be
generated by Contractor and submitted to Bill Inward Section, GNFC
Corporate Building, within 30 days. Delay in submission of running as
well as final bill beyond a month will be liable for penalty of 1% of bill
value (including GST) per week shall be imposed (maximum till 10%)
for delayed submission of bills to TAO.
15. SUSPENSION OF CONTRACT:
In appropriate case, the Company may at its discretion, instead of
terminating contract for breach of any terms or conditions by Contractor,
suspend the contract for specified period. In case the contract is so
suspended, Contractor will be under obligation to reimburse the Company
for damages or loss suffered by the Company on account of Company
making alternative arrangement during period of suspension of contract and
if the Contractor fails to reimburse such loss or damages, the same will be
recovered from the Security Deposit or any other payment to be made to the
Contractor under the contract with the Company.
16. TERMINATION:
16.1 Company may, without prejudice to any other remedy for breach of
contract, by written notice of 30 days of default sent to the Contractor,
terminate the Contract in whole or in part if the Contractor fails to
perform any other obligation(s) under the Contract;
16.2 If the Contractor goes bankrupt or goes into liquidation.
16.3 In the event of termination of contract by the Company on account of
breach of any terms and conditions of the contract by the Contractor
the entire Security Deposit Bank Guarantee given by the Contractor will
liable to be forfeited.
16.4 The Company may at its discretion, terminate the contract by giving a
notice of 30 days, for convince, at any time, without assigning any
reasons, whatsoever.
17. PAYMENT UPON TERMINATION :
If the Contract is terminated because of a breach of Contract by the
Contractor, the Company shall process payments due to Contractor less all
required deductions. If the total amount due to Company exceeds any
required deductions. If the total amount due to Company exceeds any
payment due to the Contractor, the difference shall be a debt payable by
Contractor to the Company and the same may be recovered from Security
Deposit and/ or any other dues payable by the Company to the Contractor.
18. DEFECT LIABILITY PERIOD AND LATENT DEFECTS :
Defect liability period for works unless otherwise specified shall be
months from the date of issue of Completion Certificate and the Contractor
shall at his own cost and initiative, correct, repair and/or rectify any and all
defect(s) and/or imperfections in the work as shall be discovered during the
said defect liability period and in the event of the Contractor failing to do so
the Company shall be entitled for compensation from the Contractor.
19. GOVERNMENT REGULATIONS:
The Contractor shall comply with and ensure strict compliance by his / its
sub-contractors, servants and agents of all applicable Central, State,
Municipal and Local Laws and regulation / notifications of any Central, State
or Local bodies and authorities and undertakes to indemnify the Company
from and against and levies, damages, penalties and payments whatsoever
as may be imposed by reason of any breach or violation of any law, rule or
regulation whatsoever and all actions, claims and demands arising there
from and / or relative thereto.
GNFC strongly opposes sexual harassment and any such behaviour against
women is prohibited by the law as set down in “The Sexual Harassment
of Women at Workplace (prevention, prohibition and Redressal) Act,
2013” and Rules framed there under being The Sexual Harassment of
Women at Work place Rules.
You shall ensure compliance of Gujarat Professional Tax Act, 1976 and
required to deduct Professional Tax as applicable from the wages to be paid
to your workers & required to deposit the same to the appropriate authority.
20. COMPLIANCE WITH LABOUR & SAFETY REGULATIONS:
During the continuance of the Contract, the Contractor shall abide at all
times by all existing labour enactments and rules made there under, such as
Minimum wages Act, E.P.F Act.etc., regulations, notifications and bye laws
of the State or Central Government or local authority and any other labour
law (including rules), regulations, bye laws that are in force or may be
passed or notification that may be issued under any labour laws in future
either by the State or the Central Government or the local authority. The
Contractor shall keep the Company indemnified against and/or on account of
contravention of any of the provisions of any Act or rules made there under,
regulations or notifications including amendments.
If the Company is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for non-observance of the provisions
stipulated in the notifications/bye laws/Acts/ Rules/ regulations including
amendments, if any, on the part of the Contractor, Company shall have the
right to deduct all such sums from any money due to the Contractor including
his amount of security. The Company shall also have right to recover from
the Contractor any sum required or estimated to be required for making the
loss or damage suffered by the Company. The employees of the Contractor
in no case shall be treated as the employees of the Company at any point of
21. FORCE MAJEURE:
In the event that performance under the Contract, in the reasonable opinion
of either party (Company & Contractor) is made impossible by force majeure
like war, hostilities, revolution, civil commotion, strike, epidemic, accident,
wind, fire, flood, or because of any law, order, proclamation, regulation or
ordinance of any Government, or of any subdivision thereof or because of
any act of God, quarantine restrictions, epidemics, etc. then either party shall
so notify the other in writing. If such force majeure circumstances continue
for more than three months then either party may terminate the Contract, or
complete performance of the Contract with such adjustments as are required
by the existence of the force majeure and are agreed upon by the parties.
22. DISPUTE RESOLUTION:
22.1 All disputes or difference(s) whatsoever which shall at any time arise
between the parties hereto touching or concerning the works or the
execution or maintenance thereof of this Agreement/ Contract/ Work
Order/ Purchase Order/ Service Order or the rights touching or
concerning the works or the execution or maintenance thereof of this
Agreement/ Contract/ Work Order/ Purchase Order/ Service Order, of
the construction meaning operation or effect thereof or to the rights,
liabilities of the parties or arising out of or in relation thereto whether
during or after completion of the Agreement/ Contract/ Work Order/
Purchase Order/ Service Order or whether before or after
determination, foreclosure or breach of the Agreement/ Contract/ Work
Order/ Purchase Order/ Service Order, shall be referred by the
disputing Party, in writing to the other Party, within 30 days of
occurrence of such event, to resolve any such dispute or difference.
22.2 If such dispute mentioned above is not resolved amicably by direct
informal negotiation, within a period of 30 days, then such dispute/
difference shall be referred to the Engineer-In-Charge/ Additional
General Manager of the concerned department of GNFC. Engineer-In-
Charge/ Additional General Manager shall give its decision within
days of the reference of the dispute to him.
23. ARBITRATION:
23.1 If any Party serves an Arbitration Notice in respect of any dispute to the
Appointing Authority, the dispute shall be finally settled by arbitration
under the Indian Arbitration and Conciliation Act, 1996 (“Act”) and all
statutory amendments, modifications thereof and the rules made there
under, or any other corresponding law for the time being in force, by the
Sole Arbitrator to be appointed as hereinafter provided.
23.2 Within 30 days of receipt of Arbitration Notice, the Appointing Authority
shall appoint the Sole Arbitrator, who shall be a retired employee of
GNFC, not below the rank of General Manager and who shall be
qualified to be appointed as an Arbitrator under the law in force at the
23.3 The provisions of the Indian Arbitration Act, 1996 and all statutory
enactments and modifications thereof and rules made there under shall
23.4 The Arbitration proceedings shall be conducted in English and the
venue and seat of the Arbitration proceedings shall be at Bharuch and
the Courts at Bharuch shall have exclusive jurisdiction.
23.5 The governing substantive law shall be Indian laws.
24. LABOUR LAWS AND REGULATION:
24.1 The Contractor shall be responsible for strict compliance of and shall
ensure strict compliance by it sub-Contractors, servants or agents of all
labour and other laws, rules or regulation having the force of law
affecting the relationship of employer and employee between the
Contractor/Sub-Contractor and their respective employees.
24.2 The Contractor and Sub-Contractor(s) of the Contractor shall obtain
authority(ies) designated in this behalf under any applicable law, rule or
regulation including but not limited to the Factories Act, ESI Act,
Employees Compensation Act and Contract labour (Abolition &
Regulation) Act, 1970 (insofar as applicable) any and all such
license(s) consent(s), registration(s) and / or other authorisation (s) as
shall from time to time be or become necessary for relative to the
execution of the work or any part or portion thereof or otherwise in
connection with performance of the Contract, and shall at all times
observe and ensure due observance by the Sub-Contractor, servants
and agents of all terms and conditions of the said licence(s),
regulation(s) and other authorisation(s) and laws, rules and regulations
applicable thereto.
24.3 Nothing in the Contract document stated shall anywise constitute any
workman/ employee of the Contractor or any Sub-Contractor as or to
be workman/ employee of the Company, or place obligation or liability
in respect of any such workman/ employee upon the Company.
24.4 Without prejudice to any other liabilities or obligation of the Contractor
relative to Sub-Contractors in terms hereof or otherwise, the Contractor
shall indemnify and keep indemnified the Company from and against all
actions, claims, demands and liabilities whatsoever under and in
respect of the breach of any other provisions and / or against any claim,
action or demand by any workman / employee of the Contractor or any
Sub-Contractor and / or from any liability anywise to any workman /
employee of the Contractor or any Sub-Contractor under any law, rule
or regulation having the force of law, including but not limited to claims
against the Company under the Employee’s Compensations Act,
The Employees Provident Funds Act, 1952, and/ or The Contract
Labour (abolition & Regulation) Act,
25. SAFETY REGULATION, ACCIDENT AND DAMAGE:
25.1 The Contractor shall be responsible at his own cost in and relative to
performance of the work and Contractor to observe and to ensure
observance by his Sub-Contractors, agents and servants of the
provisions of Safety Code as hereinafter appearing and all fire, Safety
and Security regulations as may be prescribed by the Company from
time to time and such other Precautions, measures as shall be
25.2 All necessary personal safety / protection equipment as considered
adequate by the Engineer- in-Charge / Officer- in-Charge should be
made available for the use to deployed manpower on the site and
maintained in a condition suitable for immediate use and the Contractor
should take adequate steps / monitor continuously for proper use of
such equipments by those concerned.
25.3 The contractor shall submit immediately in writing about accidents
occurred during the work execution to Company’s Fire & Safety and HR
deptt. under intimation to Engineer- in-Charge / Officer- in-Charge.
26. SECURITY REGULATIONS:
26.1 The contractor shall ensure for strict compliance with the security
regulations / directives of the Company & shall also ensure that the
manpower deployed follows the rules during Entry / Exit as well as
while they are in the Company premises. All the deployed manpower
shall prominently display the Entry Cards while they are in the premises
of the Company.
26.2 If the Company finds any person / persons deployed by the contractor
to be undesirable the contractor shall immediately withdraw such
person / persons and substitute him / them. The decision of the
Company for undesirability of the persons deployed by the contractor
shall be final and binding on the contractor.
27. QMS, EMS, OHSMS & EnMS COMPLIANCE:
The Company is certified for Quality Management Systems, Environment
Management System, Occupational Health & Safety Management System
and Energy Management System. All the persons (including Contractors,
Supervisors & their workers) working at GNFC or on behalf of GNFC are
required to comply with the QEHSEn guidelines in addition to other
applicable labour laws, safety laws as well as legal compliances.
28. OTHER TERMS:
GNFC reserves its right to enter into parallel Contract/s with other Bidders.
In case, if contract is awarded and bidder fails to execute the same in line
with Conditions of Contract given in the contract, GNFC reserves its right to
source such services from any other source and extra financial implication, if
any, shall be to the defaulting Contractor’s risk and cost.
29. GENERAL CONDITIONS OF CONTRACT:
All other terms conditions, not covered to the extent as provided above and
in Annexure attached hereto shall be as per General Conditions of Contract
(GCC) attached and marked as Annexure – V, which is an integral part of
this tender document.
30. GENERAL OBLIGATIONS OF THE CONTRACTOR:
30.1 The Contractor shall deploy suitably qualified and experienced
manpower in adequate numbers to carry out the job as per the scope of
work efficiently, safely & systematically depending upon the
requirement of the Company from time to time.
30.2 The Contractor shall deploy only such persons:
a) who are above the age of 18 (eighteen) years and below the
age of 60 (sixty) years.
b) who are physically sound, well behaved, trustworthy and
c) who are medically fit, with proper eye sight (with or without
d) who can read and write Gujarati / Hindi.
e) who have clean habits and are teetotallers.
f) Who have no criminal record & have authentic ID & birth
30.3 The Contractor shall deploy Supervisors in adequate numbers to
organize job related activities, supervise closely the job to be carried
out by his deployed manpower as well as to ensure their safety &
security. The contractor / supervisor shall obtain details of jobs to be
carried out from Engineer-in-Charge / Officer-in-Charge & shall update
progress of jobs to concern.
30.4 The Contractor shall solely and exclusively responsible for engaging
and employing the persons for execution of this contract. The company
shall have no liability whatsoever concerning workers. The Contractor
shall indemnify the company against all losses or damages or liabilities
arising out of or in course employing person or out of their relationship.
30.5 The Contractor shall be responsible and liable for payment of salaries,
wages & other lawful dues of his personnel as EMPLOYER. The
Contractor shall maintain proper books, accounts, records &
documents and comply with all statutory rules & regulations applicable
to the Employer as CONTRACTOR.
30.6 The Contractor shall make payment of wages and other dues to his
personnel on scheduled date but not later than 10th of each calendar
month. The Contractor shall also certify that all personnel employed
have been paid the minimum wages as prescribed by the Government
and all other laws are complied with and that there is no violation of any
applicable laws and no case of litigation is instituted or pending before
any authorities.
30.7 The Contractor shall disburse the monthly wages to his personnel
deployed at our site through bank only, disbursement of wages in cash
shall be not be allowed in any case. The Contractor shall submit soft
copy of file containing full name of worker, his bank account no. and
name of bank & branch as well as PF account / UAN no., before first
wage disbursement to operating department & HR department.
30.8 The Company shall be entitled to deduct directly from the bills to be
paid to the contractor any sum payable by him and which sum/sums
the Company is required to pay as Principal Employer on account of
contractor’s default in respect of all liabilities referred to in above
clauses and loss, damage etc. suffered by the Company due to
contractor’s negligence.
30.9 The successful contractor shall arrange (i) to Submit separate
Employee’s Compensation Policy ( ESIC.Policy ) exclusively for GNFC
Bharuch site / Dahej site (as the case may be) for total duration of
contract and Labour License before commencement of work (ii) to get
verified the wage sheet from HR Dept. before disbursement of wages
and ensure wage disbursement through Bank on the schedule date
notified by HR dept, (iii) to submit copy of wage sheet along with bank
letter showing transfer of wages as well as PF challan along with ECR
before 20th of every month (iv) to execute agreement on stamp paper
for wage disbursement through bank.
30.10 The contractor shall provide in writing the list of persons to be
deployed by him to Security department of the Company in prescribed
format for allowing them to enter in to Co.’s premises to carry out
subject job. The contractor shall also collect the ID Proof, Date of Birth
proof, Present & Permanent address proof, emergency contact nos.
and shall maintain the proper record.
30.11 On expiry of the validity of the Contract or in the event of the
company terminating the contract prematurely, the contractor shall
ensure that all the entry passes issued to his workers are collected
back and deposited with the Security Department. The Contractor shall
be solely responsible for misuse of any of the entry pass issued to his
workers and the final payment if any, applicable shall be made after
confirmation of the Security department to that effect.
30.12 The contractor shall obtain License for deployment of workers from
the appropriate authorities & also get insured them under ESIC as per
the provisions of laws and shall submit copies thereof to the Company.
30.13 All tools & tackles, safety items etc. which are required to carry out
the work safely shall be arranged by you as & when required, except
where some special tools & tackles are being provided by the
30.14 The Contractor shall provide free of charge all required safety
equipment / Personal Protection Equipment to the deployed manpower
& ensure that they use the same while carrying out the job. If required
for specific job, the contractor shall approach Engineer in-charge /
Officer in-charge for special tools/ tackles and safety appliances if
required. Any loss or damage to the specialized tools and tackles
provided by the Company to the contractor due to deliberate or
negligence of the deployed manpower shall be recovered from the
payment due to contractor at the rate as decided by the Company.
30.15 All safety precautions while executing the contract shall be strictly
observed by the contractor. Corrective measures as penalty for non -
compliance and eventual termination of contract followed by de-
registration, as approved contractors / vendors are the consequences
of repeated non - compliance and negligence.
30.16 Company is committed to safety of all the persons working inside the
factory, including contractors/agencies/their supervisors /workers / sub
contractors / agents, etc. Health & Safety Policy of GNFC is enclosed
herewith at Annexure–‘VII’ which demonstrates GNFC's strong
commitment to safety. In this regard, the Company shall imparting
necessary job related training. The Contractor shall be required to
spare the deployed manpower to participate in such programme.
30.17 The Company is certified for Environment, Occupational Health &
Safety, & Quality Management System, under which there are good
number of legal and other requirements to be fulfilled. In this regard,
the Company shall imparting necessary job related training. The
Contractor shall be required to spare the deployed manpower to
participate in such programme. We enclose herewith a copy of
Integrated Management System Policy of the Company as well as
QEHSEn Guidelines to Contractors at Annexure–‘VIII’ & Annexure–‘IX’.
30.18 The Contractor shall be fully liable for any delay, loss or injury
caused directly or indirectly by any act or omission on the part of his
labourers, agents or persons. In case, if any damage, loss or injury is
caused, the Contractor shall be liable to compensate for the same as
per the decision of GNFC, which shall be final and binding.
30.19 Company, however, reserves its right to terminate the contract
prematurely without giving any notice or any compensation whatsoever,
in case of failure by the contractor to discharge the jobs under the
scope of the subject contract to the satisfaction of the Company or in
case of misbehaviour/indiscipline on the part of the Contractor himself
or his labourers or agents or persons. The decision of the Engineer-in-
charge / Officer-in-charge of the Company in this regard shall be final
and binding upon the contractor.
30.20 In case the contractor fails to discharge his obligations in time, then
the Company shall get the services of other contractor/agency at
contractor’s risk and cost. The expense towards this shall be recovered
from the contractor. The decision of the Company shall be final in this
1) Under this contract, the contractor will be required to carry out all the civil &
structural work as per the instructions of the Engineer-In-Charge (EIC) at
GNFC Township, Pick Up bus stand, Golf Ground, Angareshwar Guest
house and the other area under TAO from time-to-time such as by issuing
SO, drawings (drgs.) sketches or oral instructions confirmed in writing by
SO later-on. During the entire period of the validity of this contract the rates
for, carrying-out such works shall be paid as per approved Schedule of
2) This contract is for small & miscellaneous (misc.) jobs of different types. To
carry out the above jobs expeditiously throughout the year, the contractor
will have to establish a temporary office & store at site given by the
company as per the terms and conditions of the company. The above store
& site office shall be immediately vacated on the expiry of the contract. In-
case if the contractor fails to do so within a period of one month from the
expiry of the contract the Company shall take appropriate action, at their
risk & cost. The expenditure so incurred shall be deducted, from Security
Deposit (SD)/ Pending Bills. E Type quarter shall be issued for such store,
office and workshop on Free basis if available.
3) Under various SOs issued some of the works will have to be carried-out
urgently & at short-notice. Therefore, the contractor will have to ensure that
Manpower of different trades are made available, at a very short-notice,
generally 24 hours. In-case of any delay on their part to start the job within
specified time, Company reserves the right to get such jobs executed
through another contractor at their risk & cost.
4) Efforts have been made to cover all the specifications of the items
mentioned in the Tender. However, where the same are not specified in the
Tender, the relevant IS specification shall be applied. The mode of
measurement shall be as per IS.:
5) The company reserves the right to order any items of the Value Contract
independently as may be considered urgent. The contractor shall be bound
to execute any item of the Value Contract at its approved rates when the
contractor is called-upon to do so during execution of this contract.
6) As this contract is for jobs of small & miscellaneous nature, jobs required to
be carried-out maintenance, alternations & modifications are likely to come
during the tenure of this contract. No quantities have been mentioned in
the offer, therefore, the scope of work to be executed, by the contractor
under this contract is uncertain. However, GNFC will try to give full justice
7) Since the work is to be carried-out in different quarters in various streets,
public buildings and other utility area of township, it is likely that work
permit may not be available all the time or clearance to carry out the work
at certain time. For any such delay in the work, the contractor will not be
entitled to claim any extra expenses. However, suitable extension in the
completion time-limit shall be considered for such delay as per penalty
8) All the areas where the existing grading is disturbed in the course of
execution of the work, the same shall be made good, by the contractor, to
the satisfaction of the EIC at no extra-cost.
9) The materials, design & workmanship shall satisfy the relevant IS., the
specification contained herein & the codes referred-to. Where the job
specification are at variance to the Standard (Std.) codes & specifications,
job specifications mentioned in the Tender Document/ contract will prevail.
10) Division of Quantities for superstructure & foundation: The works below
paving level will be measured under the item of foundations & the work
above paving shall be measured under the item 'Superstructure'. The
paving level will be as indicated in the relevant drawings (drgs.).
11) Checking of Levels & Set-Outs: Contractor shall be exclusively responsible
to the Company, for ensuring proper levels, dimensions & setting-out of
works etc. & shall rectify effectively errors or imperfection therein. Such
rectification shall be carried-out, by contractor at their own cost, after
Safety belts, safety goggles, safety gloves instructions are issued to that
effect by the EIC.
12) To be supplied, by the contractor :
1) All materials consumables, testing application tools tackles
necessary for completing civil work should be procured & supplied,
by the contractor at their Own Cost.
2) All borrow areas for procuring earth on sand etc. should be arranged,
by the contractor & no payment towards royalties, right of way etc.
shall be payable by the Company. The rate quoted for relevant items
should be include such costs.
13) Tests on material mentioned in the specifications will apply on all materials
brought to site by the contractor if required, on sample basis. Tests on
materials supplied, by the Company, if required, by the Engineer-In-
Charge (EIC), will be carried-out by the contractor but cost of such tests
will be reimbursed by the Company at actual on production of proper
14) The contractor shall be responsible for the safety & any loss, damage or
injury caused or suffered by any Employee, Labour, Equipments, Materials
or other properties of their or of GNFC.
15) All safety equipment required for execution of jobs, like safety helmets,
safety shoes, Safety belts, safety goggles, safety gloves, etc. shall be
brought by the contractor.
16) Storage of construction materials:
A. Material like sand, metal, bricks, concrete blocks steel etc. shall
be required to be stored within specific boundary & within
meter lead from the site of work. The boundary around each stack
shall be made predominant, Material like bricks or blocks till the
material is stacked there. Once the material is consumed or
required to be shifted, the boundary shall be removed.
B. The material shall be so stacked that it will not obstruct the traffic
C. The space / area of stacking the material shall be got approved by
the EIC prior to its stacking.
17) Manpower & machinery:
The contractor shall be required to maintain minimum following manpower
for continuous & technical working at site. Additional manpower shall be
deployed as per job requirement as & when needed.
A) Engineer: Degree/ Diploma Engineer & should have
sufficient experience.
B) Supervisor: Generally two to Three in number. They should
be educated & literate & able to read the
instructions. They should have experience of
working in Industries.
C) Machinery: 1 No. Concrete mixer.
1 No. Vibrator with needles of different sizes
1 No. Concrete breaker
OTHER TERMS & CONDITIONS APPLICABLE TO CONTRACT
1. The General Conditions of Contract (GCC) of GNFC shall be applicable for
this work. GCC shall be modified or added to by the following SCC. The
SCC forms part of this contract and shall prevail over GCC in case of any
2. For all items/ works, the contractor shall provide a copy of challans for all
bought out materials. The challans shall be of the manufacturer/ dealers
only. The challan shall include the details of the brand specifically written.
The challans shall be duly certified by GNFC Security gate with entry
3. GNFC will issue following materials for the works, free of cost, as per terms
and conditions set forth in the GCC. The materials shall be made available
at GNFC's stores.
Reinforcement steel bars
Steel structure, MS plate, Chequred plate and MS bars
Serviceable scrap bars and steel sections
Further such issues shall be subject to the following conditions:
(i) The Contractor shall bear all other costs including lifting, carting
from issue points to work site/ the contractor's store, custody
and handling etc., and return of surplus/ serviceable materials
to Owner's stores and no separate payment for such
expenditure will be made. Cement shall be issued in non
returnable HDPE bags
(ii) Free issued materials, issued by the owner shall be fully
accounted for allowable percentage maximum waste over
theoretical consumption, as under,
Cement 3 % (unaccountable wastage),
Reinf. Steel 0.5 % (unaccountable wastage) + 2.5 %
(accountable wastage)
Structural Steel 0.75 % (unaccountable wastage) +
3.25% (accountable wastage)
(iii) For excess wastage and/or for non-returning of scrap,
recovery will be made by GNFC at actual landed price of the
(iv) All issued cement shall be stored in the closed shed/covered
with water tight materials. Proper record of issue and
consumption of cement, reinforcement steel and structural
steel materials shall be maintained. Reconciliation of the
same shall be given by the contractor along with the bills.
(v) For the purpose of accounting of reinforcing steel & structural
steel other-than MS plates by the Company, all cut pieces
measuring in length 2.0 Mtrs. & above when returned, to
Company's storage points, shall be treated as serviceable
material & will be given full credit, by the Company. All pieces
measuring less-than 2.0 Mtrs. will be treated as wastage /
scrap. For the purpose of accounting of MS plates, all plates
measuring less-than 1.0 M2 in area & having any dimension
less-than 200 mm. shall be treated as wastage / scrap. For
plates measuring more-than 1.0 M2 in area & not having any
dimension less-than 200 mm. when returned to the
Company's Storage point shall be given full credit.
4. Separate contract for each year shall be awarded by GNFC. Defect liability
period for each contract shall be one year from the date of completion of
work of each contract. Final bill payment of each contract shall be made
only after obtaining no objection certificate from Security dept and Human
resource dept of GNFC before submission of the final bill of the work.
5. The Contractor shall submit to the Engg. In Charge on the first day of each
week a progress report for the previous period showing up to date
cumulative progress and progress during the preceding week alone on all
progress items of each section or portion of the works in the proforma
prescribed by the Engineer In Charge. Contractor shall submit a daily
report of labour employed in the specimen form during work in progress.
6. Contractor shall submit report for the materials received from the store
during 1st week of every month.
7. Priorities of the work shall be decided by the owner as per the requirement,
which may change during the execution of the work as per the need of
completion of the overall project.
GENERAL CONDITIONS OF CONTRACT
Attached as tender document on (n)procure
CONDITIONS OF LABOUR LAWS
Attached as tender document on (n)procure
HEALTH & SAFETY POLICY
Attached as tender document on (n)procure
Annexure – VIII
INTEGRATED MANAGEMENT SYSTEM POLICY
Attached as tender document on (n)procure
QEHSEn GUIDELINES TO CONTRACTORS
Attached as tender document on (n)procure
SCHEDULE OF RATES
Attached as tender document on (n)procure
COVERING LETTER
(To be submitted on the Letterhead of the Applicant)
Ref: RFP Reference No.
Sub: Submission of Bid in response to the RFP for Annual Rate Contract
for Maintenance Activities related to Civil, Carpentry, Plumbing and
Sanitary works at Narmadanagar Township..
1. Having examined the RFP document, we, the undersigned, herewith submit
our Bid/ proposal in response to your RFP Notification number
GNFC/TAO/CIVIL/ARC/2026 for Annual Rate Contract for Maintenance
Activities related to Civil, Carpentry, Plumbing and Sanitary works at
Narmadanagar Township.
2. We have read the provisions of the RFP document and confirm that we
accept these. We further declare that additional conditions, variations,
deviations, if any, found in our proposal shall not be given effect to
3. We agree to abide by this proposal, consisting of this letter, the detailed
response to the RFP and all attachments thereto.
4. We would like to declare that we are not involved in any litigation that may
have an impact of affecting or compromising the delivery of services as
required under this assignment, and we are not under a declaration of
ineligibility for corrupt or fraudulent practices.
5. We would like to declare that there is no conflict of interest in the services
that we will be providing under the terms and conditions of this RFP.
6. We hereby declare that all the information and statements made in this
proposal are true and accept that any misrepresentation contained in it may
lead to our disqualification.
7. We understand you are not bound to shortlist/accept any or all the proposals
8. We would like to declare that we are not blacklisted by any Central/ State
Govt. / PSUs or Local Govt. Department, as on the date of application and is
not debarred from participation in the Tender process.
9. We hereby declare that we qualify and fulfil the eligibility criteria mentioned
Date: Signature of Authorized Signatory___________
Place: Name of the Signatory ______________
Company Name & Seal
UNDERTAKING FOR WAGE DISBURSEMENT THROUGH BANK
(To be submitted on the Letterhead of the Applicant)
Attached as tender document on (n)procure
Annexure – XIII
Attached as tender document on (n)procure
MSME GUIDELINES
Attached as tender document on (n)procure
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document_ARC CIVIL.pdf
SOR.pdf
Prequalification.pdf
General Conditions of Contract (GCC).pdf
GST ANNEXURE v 18032023.pdf
Condition of labour laws.pdf
Health and Safety Policy.pdf
Integrated Management System Policy.pdf
QEHSEn Guidelines to Contractors.pdf
Supplier code of conduct.pdf
MSME ANNEXURE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .