Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.9 LAccepted-AOC | ₹50.9 L | L1 | Accepted-AOC By The Tender Committee |
| 2 | L2₹50.9 LSame as L1Rejected-Finance CUTTACK CUTTACK ODISHA | CUTTACK | ODISHA | 752120 | ₹50.9 LSame as L1 | L2 | Rejected-Finance By The Tender Committee |
| 3 | L2₹50.9 LSame as L1Rejected-Finance NIL | FARIDABAD | HARYANA | 121004 | ₹50.9 LSame as L1 | L2 | Rejected-Finance By The Tender Committee |
| 4 | L2₹50.9 LSame as L1Rejected-Finance NIL | ₹50.9 LSame as L1 | L2 | Rejected-Finance By The Tender Committee |
| 5 | L2₹50.9 LSame as L1Rejected-Finance CUTTACK CUTTACK ODISHA | PURI | ODISHA | 752120 | ₹50.9 LSame as L1 | L2 | Rejected-Finance By The Tender Committee |
Tender Value
₹50.9 L
EMD Value
₹50,850
Closing Date
21 May 2026, 5:00 pmClosed
Municipal Commissioner, RMC
Rourkela Municipal Corporation, Rourkela
Works
2026_RMC_128918_4
MC/RMC/36/2026
Open Tender
Civil Works - Others
Percentage
Rourkela
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹50,850
Yes
12 Aug 2026
7 May 2026
22 May 2026
7 May 2026
21 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge. | - | cum | 1 | - |
| 2 | Filling sand in foundation and plinth with well waterd and rammed etc…….complete. | 1 | cum | - | - |
| 3 | Providing,laying and spreading and compacting with RSP Slag including all cost etc. all complete. | 1 | cum | - | - |
| 4 | C.C -(1:4:8) using 40mm size H.G Metal with all cost, conveyancy including rigid smooth shuttering | 1 | cum | - | - |
| 5 | C.C M-20 using 20mm size stone chips with all cost, conveyancy including rigid smooth shuttering | 1 | cum | - | - |
| 6Providing HYSD Bar reinforcement for R.C.C work including straighting, cutting, binding, welding, tying the grills, laying and placeing the proper position as per approved design and drawing including cost, conveyancye of 18 to 20 gauge binding wire cost and conveyance HYSD bars complete in all respect as per specification for road and bridge and direction of engineers in charge. | |||||
| 7 | Providing and laying of M40 grade 80 mm thick factory made interlocking pavers on floors with all cost,convey,labours,T&P etc…….complete. | - | sqm | 1 | - |
| 8 | Rigid smooth centring and shuttering……..etc. all complete. | 1 | sqm | 1 | ₹1 |
| 9 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost of chquared floor tiles of approved shade | - | sqm | 1 | - |
| 10Providing ,fitting and fixing of stainless steel railing of 304 grade in hand railing using 50 mm dia and 2 mm thick circular pipes with balustrade with three horizontal bars and height of 0.90 mt. height as per instruction of engg- in -charge. | |||||
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_590073.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .