Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance MADAARI HOUSE CHERUPPA P O 673661 | CHERUPPA | KOZHIKODE | KERALA | 673661 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.2 L
EMD Value
₹18,008
Closing Date
22 Jun 2026, 5:00 pmClosed
Asst.Executive Engineer
LID and EW Division Kozhikkode
Urgent works
2026_LSGD_855912_1
TA/LSGD/KKD/45/2026-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Koduvally
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,590
Yes
₹18,008
Yes
24 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1G M H S Raroth | |||||
| 1.001 | OD28850/2026-2027:Demolishing laterite masonry/solid blockmasonry work manually / by mechanical means
including stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.002 | OD28852/2026-2027:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: Dry rubble masonry. | - | cum | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | OD28851/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.005 | OD28853/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.007 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | OD28854/2026-2027: Laterate masonry with neatly dressed departmental laterate stone of size 40 x 20 x 15 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1446639.xls
BOQ • 0.25 MB
newtenderconditions.pdf
Additional Documents • 0.30 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .