Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC BUNGALOW NO 21 CANTONMENT BAREILLY 243001 | BAREILLY | UTTAR PRADESH | 243001 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹20.9 L+₹5.9 L (39.3%)Rejected-Finance 129 A NICHLI CHOWKI DEVI NAGAR SECTOR 32 PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | L2 | Rejected-Finance Being 2nd Lowest |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
14 Mar 2022, 6:00 pmClosed
GE EAST BAREILLY
Garrison Engineer East Military Engineer Services Shahjahanpur Road Bareilly Cantt
REPAIR OR MAINTENANCE OF DG SETS INSTALLATIONS AND ALLIED WORKS, SWIMMING POOL AND OTHER ALLIED WORKS AND COMPREHENSIVE MAINTENANCE OF VEHICLE UNDER GE (E) BAREILLY.
2022_MES_508201_1
8979/E8
Open Tender
Civil Works
Item Rate
183 days
BAREILLY
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
GE EAST BAREILLY
₹50,000
Yes
16 Mar 2022
15 Feb 2022
16 Mar 2022
21 Feb 2022
14 Mar 2022
28 Feb 2022
15 Feb 2022 - 21 Feb 2022
Amount
Repair/Maint of DG Sets works Routine maintenance consisting of normal repairs with periodical routine maintenance,attending breakdown as and when required and testing of DG set complete i.e. Engine, Alternator etc including all consumables items like cotton, waste cloth, kerosene oil etc. Maintenance will be carried out as all directed and comprising of the following :- (i) Change engine oil. (ii) Check clearance of suction and exhaust valves and adjust if required. (iii) Changing of oil filter, fuel filters, screen filters assy. (iv) Changing of water filter element. (v) Topping up of coolent. (vi) Change of Hydraulic governer oil. (vii) Tightening of all nut bolts. (viii) Greasing of all points. (ix) Cleaning of fuel tank by taking out the dirt and sludge, cleaning the tank thoroughly. (x) Adjusting valve tappet clearence/timing (xi) Injector pressure test cleaning and repairing,tightining fasteners and making lubrication leak proof (xii) Repair/rewiring of broken/damaged control panel connection including measuring instruments, indicators,engine proction devices etc NOTE: (a) Lub oil, Engine oil required at the time of maintenance / testing will be incuded in unit rate quoted and coolant will be paid separately. (b) Labour charges for dismantling / taking down and replacement / refixing new parts as and when required is deemed to be included in unit rate quoted. (c) Spare parts like oil filter, fuel filter, screen filter by pass filter etc will be measured and paid separately.
(a) 100 KVA to 125 KVA DG Set
(b) 63 KVA DG Set
(c) 15 KVA to 25 KVA DG Set
M & L for conditioning of battery 12 Volt, upto 180 AH, to drain out distilled water, Acid and taking out damaged lead plates complete for replacing lead plates of suitable weight & size including filling fresh lead acid, distilled water, microporus seperater complete and testing.
M & L of battery 12 Volt, 150 AH, complete for replacing lead acid battery complete and testing.
M & L for taking out self starter 12/24 volt from the DG Set, transportation to workshop opening/disconnecting all internal connection, cleaning the same taking out burnt armature, segrigation of serviceable parts for re-use, rewinding of armature with copper wire of existing size. Reassembling the same with replacement of following items also:- (a) carbon brush 01 set, (b) Beadex pinion 01 no, (c) Half clutch assy 01 No, (d) Field coil 01 No, (e) solonoid switch 01 No., (f) commitator 01 nos and refixing the self starter on the engine at site and testing on completion all as specified and directed.
Supply and fixing Battery terminal cable, copper conductor multi strand, unsheathed, single core 25sqmm, 1.5 mtr long fixed with copper terminals on both side suitable for 12 Volts & upto 180 AH/150AH battery.
M&L for dismentaling the unserviceable radiator for DG set of undermentioned capacity from engine, transportation to the workshop, repair the tank /storage portion incl necessary welding & making leak proof of the tank, cleaning the complete radiator with chemical agent and pumping set incl replacement of defective copper core and assembling the radiator including replacement of all old rusted MS nuts, bolts washers & gasket sets including refixing and testing complete for the following sets.
(a) 100 KVA to 125 KVA DG Set
(b) 63 KVA DG Set
(c) 15 KVA to 25 KVA DG Set
M & L for dismentaling turbocharger assembly from the DG set of undermentioned capacity from engine,, transportation to work shop for repair,cleaning and carrying out inspection of each components/spares segrigation of serviceable spares for reuse including Decarbonising machine, cutting, grinding polishing etc and re-assembling the Turbocharger with replacement of spare parts and refixing on existing position complete for the following sets.(NOTE :- Spares required will be measured and paid separately under respective items).
(a) 100 KVA to 125 KVA DG Set
(b) 63 KVA DG Set
M & L for Taking out exhaust silencer box and pipe from the DG set, decarburizing and cleaning the silencer box including replacement of nut, bolts, washers clamp/bracket and refixing and wraping with asbestos rope and powder (NOTE :- Asbestos rope and powder will be included in same quoted rate under respective items.)
M & L for Dismantling of injector assembly of the DG set of under mentioned capacity from engine for repair, cleaning and overhauling of the same with necessary calibration including replacement of necessary repair item as required for the follwing set.
(a) 125 KVA DG Set
(b) 63 KVA DG Set
(c) 15/25 KVA DG Set
Supply only Injector kit in repair for incorporated to the injector assy.
M & L for replacement of unservicable parts with the new one, conforming to their respective part nos. for the follwing mentioned items after dismentaling the 100 to 125 KVA DG sets incorporated in the item No.1, and taking out the unservicable parts, for the following set :-
(a) Cylinder liner assembly
(b) Piston
(c) Piston Ring
(d) CR bearing
(e) Main bearing
(f) Head Gasket.
(g) Engine Gasket
(h) Engine Valve
(j) Valve Guide.
(k) Valve Seal
(l) Oil seal assembly
(m) Nozzle 'o' Ring
(n) Main Oil seal
(o) Fly wheel Ring gear
(p) Fan belt
(q) Copper Washer
(r) Hose pipe with clamps
(s) Teflon Oil seal
(t) Nut with bolt
(w) C R bush
(x) Thrust Washer
(y) Nozzle valve
(z) Fuel pipe (inlet & outlet pair)
(aj) Thermostate valve
(al) Radiator Fan
(am) Valve solenoid
(ap) LO Temprature Guage
(aq) LO Pressure Guage
(ar) Water Temp. Guage
(as) Air filter
(at) Lub oil filter
Supply only anti freeze radiator coolant (Make-HP/Servo/Castrol)
M & L for dismentaling and Taking out burnt/damaged coupling shaft fan from alternator of 63 KVA to 125 KVA DG Set and supply and fix Coupling shaft with complete assembly suitable for 125 KVA DG Set including cleaning and applying insulating material on existing winding of alternator and testing complete all as directed.
M & L for removing Alternator 415 V 3 Phase 4 wire system from engine both mechanically and electrically, transporting to local workshop, dismantling the alternator, removing the burnt out winding wire and rewinding of stator winding with same gauge copper wire and turn with "F" class insulation, varnishing, heating, drying, greasing the bearings and rotating parts and assembling back after aligning with engine including testing on load as directed for the following capacities :-
(a) 100 KVA to 125 KVA DG Set
(b) 63 KVA DG Set
M&L for Painting to the DG Sets of any capacities by prepration of old painted surfaces, cleaning & removing of existing rust grease oil spot etc,priming with aluminium red-oxide and then applying 1st grade of synthetic enamelled spray paint (two coat) of approved make, brand and colours (includes cost of paint) including fuel tank foundation base and panel board complete.
M & L for finding out defects of Fully Automatic Electric panel (AMF) of DG set and Taking out burnt interconnection wiring including u/s and serviceable components for reuse including Rewiring of panel using existing size of copper cable, ferrule, lugs, insulating material, nut bolt washer of various sizes refixing serviceable items including replacement of Contactor of any Model & amps capacity, 240 volt coil of any Make and Part No. and testing complete.
Supply and fix in repair of ignition switch with key for DG set Make : Minda or other equivalent make.
Supply only diluted sulphuric acid specific gravity 1250 for lead acid batteries.
Supply only distilled water for batteries in 5 litrs of can.
Supply and fixing for power contractor,3 pole with AC coil,415 V, 50 KW ,200 A and auxillary contract 2 No + 2NC complete. Make ABB/L & T/Havells/Schiender
Supply & Replacement of Auto Voltage Regulator complete with wire connection and connected to existing field coil, 24 Volt, DC for cap of DG set 100 to 125 KVA Make- Kirloskar / Cummins after taking out the unserviceable one.
Supply & Replacement of Auto Voltage Regulator complete with wire connection and connected to existing field coil, 24 Volt, DC for cap of DG set 18 to 63 KVA Make- Kirloskar after taking out the unserviceable one.
M & L for earthing complete with galvanised steel earth plate electrode 60cm x 60cm x 6.3 mm thick, burried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metres below normal ground level connected to galvanised iron strip of 32 X 6 mm connected to test point by means of nut, bolts and washers made out of galvanised iron or steel all including earthing pit in PCC (1:3:6) type C1,RCC (1:2:4) type B1 precast cover slab with one handle made out of 8 mm dia round bar,20 mm dia (medium grade) protecation pipe and providing layer of charcoal or coke and salt in alternative layers,necessary earth work complete as shown in Electrical plate No 3 as specified or indicated including testng on completion.
Supply only K Cool oil for DG set as approved by engineer in charge
Supply & Fixing in replacement for Speed contrl unit series ESD 5100 ( Model No-IMPRORTED GAC ESD-5111 ) for DG set working voltag 12-32 Volt DC, out put current rang 0-5 Amps,speed sensor signal 0.5, 120 Volt AC RMS, operating Ambient teprange rang -40 degree to + 85 degree,relative humidity 95%, speed range 1k-7.5 kHZ ,spped trim range +- 200 HZ ,grass weight 0.65 kg complete oll as spesified and directed.
Supply & Fixing , DC alternator for battery Charging
Repair/Maintenance of Swimming Pool and other allied works M&L for complete overhauling and repairing of pressure filter capacity 2500 Cu M/hr including removal of chocked media from filter and depositing same with 30 m from plant room, scraping and cleaning of filter inside surfaces and re-painting with 3 black bituminous pant, cleaning of lateral pipes and recharging each filter with fresh filter media as follow :- i. Natural graded gravel of size 25mm - 20 mm : 150 mm layer : 68 Cu Ft ii. Natural graded gravel of size 15mm - 10 mm : 100 mm layer : 45 Cu Ft iii. Natural graded gravel of size 10 mm - 6 mm : 100 mm layer : 45 Cu Ft iv. White graded coarse quartz sand 8 + 14 mesh : 100 mm layer : 45 Cu Ft v. White graded coarse quartz sand 16 + 30 mesh : 600 mm layer : 22 Cu Ft vi. Cleaning and repairing of under wash system including renewal of broken/defective unserviceable strainer/nozles. vii. Replacement of man holes & hand holes gaskets, painting exterior surface with synthetic enamel of approved shades viii. Scraping cleaning/making internal and external shell of filteration plant neat and tidy and painting internal surfaces with two coats of anti corrosive black bituminous lead free paint over a coat of primer and externally with two coats of synthetic enamel paint over one coat of primer with sprayers and wiritng description of filteration plant complete all as specified and directed.
Supply & fixing gate valve ISI marked sutiable for pressure of system of size 20 mm nominal bore complete all as specified and directed
M & L for earthing complete with galvanised steel earth plate electrode 60cm x 60cm x 6.3 mm thick, burried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metres below normal ground level connected to galvanised iron strip of 32 X 6 mm connected to test point by means of nut, bolts and washers made out of galvanised iron or steel all including earthing pit in PCC (1:3:6) type C1,RCC (1:2:4) type B1 precast cover slab with one handle made out of 8 mm dia round bar,20 mm dia (medium grade) protecation pipe and providing layer of charcoal or coke and salt in alternative layers,necessary earth work complete as shown in Electrical plate No 3 as specified or indicated including testng on completion.
Supply only soda ash as directed by Engr in Charge
Supply only Bleaching powder as directed by Engr in Charge
Supply only copper sulphate as directed by Engr in Charge
Supply only Alum Crystal as directed by Engr in Charge
Supply only Calcium based granular disinfectant for water treatment ,Packing in 45 KG, plastic drums complete all as specified and directed.
M&L for dismantling of non clog type centrifugal pumping set of capacity 12.5 HP either fixed on floor or on trolley mounted and taking out unserviceable spares and performing following operation to complete the task :-(a) rewinding of motor centrifugal pumping set with insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing & transport charges complete all as specified & directed. (b) replacement of motor bearing with lock nut -02 Nos. (c) replacement of fan motor-01 No. (d) replacement of star couling set with rubber -01 each. (f) replacement of impellor with key -01 No (g) replacement of gland coupling -01 No
M&L for dismantling of centrifugal pumping set of capacity 25 HP and taking out unserviceable spares and performing following operation to complete the task :-(a) rewinding of motor centrifugal pumping set with insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing & transport charges complete all as specified & directed.(b) replacement of motor bearing with lock nut -02 Nos. (c) replacement of fan motor-01 No.(d) replacement of star couling set with rubber -01 each.(f) replacement of impellor with key -01 No (g) replacement of gland coupling -01 No
M&L of Opening of electric and pipe connection of pumping set 3 phase,3 HP to 7.5 HP including transportation of the same to and fro civil wkshp for the works :- (a) Dismantling of motor, taking out old burnt winding wire from stator, cleaning the all slots properly, rewinding of motor with super enamelled copper winding wire of required guage, varnishing the same including baking with proper temperature and providing insulation and packing proerly. Re-assembling the motor with proper testing by meggar fixing with the pump and installed at its position and testing the same as directed.
De watering of well up to 26' feet deep and up to 8 mtr dia by portable pumping set and taking out manually waste material like sludge,mud,soil,sanitory material and other dirts etc from inner sump and outer housing sump by using labour/equipment and depositing the same waste material at low lying area by digging pits all as ,Cleaning and washing the surface area of sump well with wire brush and removing the algae growth including removal of grass/tree roots inside sump and above surrounding area etc all as specified and directed .
14. M&L for taking out unserviceable submersible pumping set of cap 7.5 HP to 20 HP complete with column pipe any capacity and any type from existing bore well carefully without damaging the p/set including connecting parts and lowering the same after repair including provision of suitable size of nut & bolts with washer and suitable packing for column pipes and connection of submersible cable complete all as directed by Engineer -in-Charge.(Parts for following items shall be paid under relevent item here-in-after under as supply).NOTE: (i) Chain pully block and clamps etc shall be provided by the contractor. (ii) Necessary safety pracaution will be responsibility of the contractor.
M&L for rewinding of submersible motor with insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing & transport charges complete all as specified & directed.
(a) 12.5 HP motor
(b) 7.5 HP motor
Supply & replacement of Single Phase Preventor for 7.5/12.5/20 HP submersible pumping set motor Make-Minilec/Havells/Surya.
Supply & replacement of overload protection relay for FASD starter ranging 10-25 Amp Make-L&T/Havells.
Supply & replacement ML 1.5 Contactor suitable for 12.5 HP submersible pumping set as directed by Engr in Charge .Make- L&T,Havells
Supply of following item for various submersible pumping set.
(a) Bowl bush for 5.0/7.5HP
(b) Bowl bush for 12.5/20HP
(c) Impeller for 5.0/7.5 HP
(d) Impeller for 12.5/20 HP
(e) Neck ring for 5.0/7.5 HP
(f) Neck ring for 12.5/20 HP
(g) Shaft sleeve for 5.0/7.5 HP
(h) Shaft sleeve for 12.5/20 HP
(i) Pump shaft for 12.5/20 HP
(j) Coupling for 12.5/20 HP
(k) Coupling key for 12.5/20 HP
(l) Impeller key for 5.0/7.5 HP
(m) Impeller key for 12.5/20 HP
(n) Stud with nuts
(o) Thrust bearing for 12.5/20 HP
(p) Lower housing bush for 12.5/20 HP
(q) Upper housing bush for 12.5/20 HP
(r) Rotor shaft sleave for 12.5/20 HP
(s) CI Bowl for 12.5/20 HP
(t) Rotor Shaft for 12.5/20 HP
Comprehensiv maintenance of Vehicle Repair/maint of vehicles- Tata 207 , Tata Xenon , once in a month for 06 Months by cleaning the vehicle from outside with the help of soap/shampoo /car washing detergent completely by removing dust and dirt from under side of the vehicle, checking of lubricants oil ,water, brake oil and other acessories fluid and top up it if required. Cleaning the vehicle from inside with the help of suction pump removing dirt and dust from complete unit, cleaning of dash board with the help of suitable mild cleaning agent of car. Cleaning of radiator of vehicle, checking its efficiency and proper functionng, checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking allingnment of the wheels functioning of wiper, indicators ,back and front light, suspension system,leaf spring, music system, and all electrical work like wiring and testing of all lights and bulbs,repair of puncture of tube inner if any complete all as specified and directed
All as per item No 45 above but for Eicher 10.70/10.75 complete all as specified and as directed
All as per item No 45 above but for Hindustan Car Ambassador complete all as specified and as directed
Repair/maint of vehicles- Motor cycle-Royal Enfield, once in a month for 06 Months by cleaning the vehicle from outside with the help of soap/shampoo/washing detergent completely by removing dust and dirt from under side of the vehicle, checking of lubricants oil , brake oil and other acessories fluid and top up it if required. checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking of brakes ,clutch and accelerator,Chain & socket , indicators , back and front light, suspension system,and testing of all lights and bulbs,repair of puncture if any complete all as specified and directed
All as above item No 48.00 but for Motor Cycle Hero complete all as specified and as directed
(A) Tata 207 DI/Tata Xenon Servicing and Repair/Maintenance of Vehicles- Tata 207,Tata Xenon each two times at interval of 2 & half months comprising checking and repair/ replacement of unserviceable spares of engine, self starter, gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system, braking system inlcuding brake shoe, Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-(i). Spare parts shall be measured and paid separatly under relevant items here in after as "SUPPLY ONLY" but fixing of the same deemed to be included in unit rate. (ii). Other minor consumable items like nut bolts washer, cotton waste etc are deemed to be included in the quoted rate Supply only following items :-
Air filter Oil filter and Fuel filter each set of three Make - Micro ,bosh
Supply only Clutch and pressure plate set including clutch bearing and clutch cylinder,Cluthch Paddle complete Make -C K or eqlt
Supply only Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Supply only Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Supply only Fog lamp
Supply only Brake/ Back light Assy Make - Autopal, K K
Supply only Indicator Assy Make - Autopal, K K
Supply only Wipper Assy with blade complete make -Syndicate,Champion etc
Supply only Water pump assembly
Supply only odometer
Supply only Door Lock assembly Make -Syndicate,ATS
Supply only Water pump assembly
Supply only Coolant bottle with pipe
Supply only Mud pad of best quality
Supply only Side looking mirror of side doors of best quality
Supply only Fan v belt Make -Fenner
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
M & L for repair of Master cylinder complete all as directed.
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Denting and Painting of Vehicle part or full body in work shop including replacement of rusted M S sheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface complete all as specified and directed Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.
Denting and welding of broken parts complete all as directed by the Engr-in-Charge
Replacement of rusted/ damaged seat cover complete set including repair of Damaged seats and stitching work complete all as specified and directed
Supply and fixing of foot mat for Vehicle-Tata 207 complete all as specified and directed
Supply only Floor matting best quality for TATA 207 DI/TATA XENON
Replace of Front glass/roof top rubber beading complete Make -Syndicate,ATS,TATA
Repair to Door /Window glass with rubber beading complete Make -Syndicate,ATS,TATA
Supply and fixing in repair of Horn assembly complete including wiring connection and fixing
Repair to gear box including bush repair/repalce and greasing etc. Complete.
Repair to tank leakage if any for the fuel tank including cleaning of tank and replacement of u/S float valve assembly and fuel tank lock and key.
Supply and fixing in repair of brass battery terminal complete
(B) Eicher 10.70/10.75 Servicing and Repair / Maintenance of Vehicles- Eicher 10.70/ 10.75 each two times at interval of 2 & half months comprising checking and repair/replacement of unserviceable spares of engine , self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system , braking system inlcuding brake shoe , Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-(i). Spare parts shall be measured and paid separatly under relevant items here in after as "SUPPLY ONLY" but fixing of the same deemed to be included in unit rate. (ii) Engin oil,Brake oil, gear oil and coolant shall be measured and paid separatley . (iii) Servicing of vehicle shall be carried out at authorised workshop only. (iv).Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Supply only Air filter , Oil filter and Fuel filter each set of three Make - Micro , bosh
Supply only Clutch and pressure plate set , including clutch cylinder , Clutch bearing complete Make -C K or eqlt
Supply only Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Supply only Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Supply only Break/ Back light Assy Make - Autopal, K K
Supply only Indicator Assy Make - Autopal, K K
Supply only Fog lamp
Supply only Wipper Assy with blade complete make -Syndicate,Champion etc
Supply only Wipper blade
Supply only odometer
Replace of Front glass/roof top rubber beading as per existing complete
Repair to Door /Window glass with replacement of rubber beading as per existing complete
Supply only Door Lock assembly Make -Syndicate,ATS
Supply only Water pump assembly
Supply only Side looking mirror of side doors of best quality
Supply only Mud pad of best quality
Supply only Coolant bottle with pipe
Supply only Fan v belt Make -Fenner
Denting and Painting of Vehicle part or full body in work shop including replacement of rusted M S sheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface complete all as specified and directed Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.
Denting and welding of broken parts complete all as directed by the Engr-in-Charge
Replacement of rusted/ damaged cloth seat/seat cover including stitching complete all as specified and directed
Supply only Floor matting best quality for Eicher 10.70/10.75
Supply and fixing of foot mat of size 600x300 mm
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, Hub greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
M & L for repair of Master cylinder complete
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Supply and fixing of PVC multistranded copper single core cable 25 sqmm required for Battery for Vech
Repair of puncture of tube inner complete all as specified and directed
Repair to gear box including bush repair/repalce and greesing etc. Complete.
Repair to tank leakage if any for the fuel tank including cleaning of tank and replacement of u/S float valve assembly and fuel tank lock and key.
Reconditioning and replacement of battery of unserviceable battery 12 volts 80AH
Supply and fixing in repair of brass battery terminal complete
C Staff Car Ambassdor Servicing and Repair/Maintenance of Vehicles- Ambassdor car Make- Hindustan each two times at interval of 2 & half months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-(i) Spare parts shall be measured and paid separatly under relevant items here in after as "SUPPLY ONLY" but fixing of the same deemed to be included in unit rate. (ii) Engin oil,brake oil, gear oil and coolant shall be measured and paid separatley . (iii) Servicing of vehicle shall be carried out at authorised workshop only. (iv) Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Supply only Air filter ,Oil filter and Fuel filter each set of three Make - Micro , bosh
Supply only Car polish 200gm
Supply only Glow Plug
Supply only Engine main seal rear
Supply only Gear box seal front
Supply only Gear sim
Supply only Gear box packing kit
Supply only Tapped cover gas kit
Supply only Fan belt (Fenner)
Supply only Fuel pipe set
Supply only Fuel pipe clip
Labour charge for dismantling engine complete chassis and replacement of main seal and dismantling gear box and replacement of gear box seal and other u/s part . ( NOTE :- Parts will be measured and paid as SUPPLY ONLY")
Supply only Radiator cleaning fluid bottle
Supply only Coolant bottle with pipe
Supply only Silencer packing
Supply only Silencer belt (TVS)
Supply only Distributor paint & condenser kit (Lucus)
Supply only Float pin
Supply only Dyframe spring (carburetor)
Supply only Carburetor packing kit
Supply only Rocker
Supply only Rocker bolt
Supply only Quarter glass lock wet
Supply only Steering cover
Reconditioning and replacement of battery 12V,90 AH complete all as specified and directed.
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
M & L for repair of Master cylinder complete
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Supply only Velvet best quality
Supply only Markeen cloth
Supply only Banyan Foam
Supply only Foam sheet ½ 32 density size 3x6
Supply only Foam sheet 2” 32 density size 3x6
Supply only Floor matting best quality
Supply and fixing of foot mat of size 600x300 mm
G Motor Cycle Royal Enfield 350 CC/Hero Servicing and Repair/Maintenance of Vehicles- Motor cycle Royal Enfield 350 CC two times at interval of 2 & half months comprising checking and repair/replacement of unserviceable spares of engine, gear box, FIP(Fuel Injector Pump), suspension system ,braking system , Chain and chain cover, Kick Assembly, replacement of filters and greasing of all wheels, of Vehicles including dismantling / Replacing of defective parts with new parts at work shop complete all as specified and directed by Engr in charge Note :-(i). Spare parts shall be measured and paid separatly under relevant items here in after as "SUPPLY ONLY" but fixing of the same deemed to be included in unit rate. (ii).Engine Oil,brake oil, gear oil shall be measured and paid separatley . (iii). Servicing of vehicle shall be carried out at authorised workshop only. (iv).Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
All per item no 161 above but for Motor cycle -Hero
Supply only Brake shoe
Supply only Clutch plate
Supply only Brake cable
Supply only Speedometer assembly
Supply only Horn assembly
Supply only Speedometer Cable
Supply only Back light assembly
lock and key of fuel tank Notes:- (a). All above vehicle shall be tested by the contractor Rep and their functionality shall be ensured on daily basis before going on duty at 8:30 AM on each working day at MT yard in presence of MES Rep/Engineer-in-charge and by the contractor rep. In case of failure on the part of the contractor to do so Penal recovery of Rs 500/- per day per vehicle shall be made from the contractors dues. (b) All defective parts shall be replaced by contractor within 48 hrs in above listed vehicle if any breakdown/offroad condition of vehicle. In case of failure on the part of contractor to do so a panel recovery of Rs. 1000/- per day per vehicle shall be made from the contractor dues. (c) The contractor must submit the purchase voucher of the spares parts and test and repair report from the authorised service station/ authorised workshop after repair of vehicle.
Supply only Brake oil
Supply only Steering/gear oil
Supply only Coolant
Engine Oil
SONI ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .