Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹2,330
Closing Date
15 Jun 2026, 5:00 pm
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
construction of road from Kelvin samad to chhunmun house brahmanmara bandhipa
2026_ORULB_130676_21
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
30 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2,330
Yes
4 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 0.42 | cum | 282.88 | ₹118.81 |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 11.77 | cum | 738.69 | ₹8,694.38 |
| 3 | Metal concrete (1:3:6) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 6.44 | cum | 6,182.65 | ₹39,816.27 |
| 4 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | 2.44 | cum | 7,757.3 | ₹18,927.81 |
| 5 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. | 4.2 | sqm | 249.82 | ₹1,049.24 |
| 6 | Supplying & fixing of 80mm thick cement concrete interlocking paver blocks of M40 grade of approved make ,design,colour & size made by block making machine with proper compaction laid in required pattern etc.complete in all respect confirming to IRC SP-63:2018. | 232.5 | sqm | 608.4 | ₹1,41,453 |
| 7 | Labour for laying sub base in layers not exceeding 100mm ,watering ,compaction to the required density including cost,conveyance of material & all T & P etc complete.(with crusher Dust) | 8.4 | cum | 1,538.37 | ₹12,922.31 |
| 8 | Towards Photograph of project, display board & other unforseen items | 1 | pc | 10,000 | ₹10,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594278.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid