Loading…
Loading…
Tender Value
₹10.8 L
EMD Value
₹11,000
Closing Date
23 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Mahuva Nagar Palika, Mahuva
CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NOS. 6, 12, AND 16. (5th attempt)
284855
18/2025-26
Open
Civil Works
Bhavnagar
2 documents required · 2 mandatory
₹900
Mahuva Nagarpalika Mahuva
₹11,000
10 Mar 2026
10 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NOS. 6,
AND 16 UNDER RASHTRIYA PARVA VARSH – 15TH AUGUST, GRANT YEAR 2022–23
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - B1
2 Schedule - B2
3 Schedule - B3
I/We am/are willing to carry out the work @ ________% Above / Below_____________Percentage (should be writen in
figures and words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 1084215=00 Put to Tender Rs. 1084215=00
Add ..............% Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Signature of the Contractor
Consl. Engineer Engineer Mahuva Nagarpalika
Chief Officer Administration
Mahuva Nagarpalika Mahuva Nagarpalika
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-12
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
11.90 Excavation for foundation upto 1.5 m depth including sorting out and
Rupees Four Hundred Forty Three
1 stacking of useful material and disposing of the excavated stuff upto 50 Cum
and Eleven Paisas Only
m lead.As Directed By Engineer
16.00 Filling available excavated earth (excluding rock) in trenches
plinth,sides of foundations etc. in layers not exceeding 20 cm in depth Rupees One Hundred Twenty Nine
consolidating each deposited layer by ramming and watering etc. and Ten Paisas Only
9.00 Filling in foundation and plinth with murrum or selected soil in layers
Rupees Two Hundred Eighty Six and
3 of 20cm thickness including watering ramming and consolidating etc. Cum
Twenty Paisas Only
complete( up to 10 ton)
7.80 Providing and Laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand
: 6 hand broken stone aggregate 40 mm nominal size ) and curing Rupees Two Thousand Nine
complete excluding cost of form work.( A ) Foundation and Plinth Hundred Seventy Six Only
2.30 Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
Rupees Three Thousand Nine
curing complete Including cost of formwork and reinforcement for
5 Hundred Twenty Three and Fifty Three Cum
reinforced concrete work in (A) Foundations, footings, Base or
columns and Mass concrete Minimum cement consumption: 360 kg per
cubic meter (kg/Cum).
1.70 Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork and reinforcement for Rupees Six Thousand One Hundred
reinforced concrete work in (D) Columns, Pillars posts and struts upto Fifty Eight Only
floor two level. Minimum cement consumption: 360 kg per cubic meter
605.00 Providing TMT Bar FE 500/500D reinforcement for R.C.C. work
Rupees Seventy Five and Forty Six
7 including bending, binding and placing in position complete upto floor KG
two level (upto 10 ton)
4.50 White stone Bela masonary block in course in Foundation with stone 5844.38 Rupees Five Thousand Eight
8 of approved quality in cement mortar 1:6 (1 cement : 6 coarse sand) Hundred Forty Four and Thirty Eight Cum
including racking the joints etc. complete Paisas Only
2.50 White stone Bela masonary block in course in super-structure with
Rupees Six Thousand One Hundred
9 stone of approved quality in cement mortar 1:6 (1 cement : 6 coarse Cum
Ten and Three Paisas Only
sand) including racking the joints etc. complete
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-12
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
14.74 Steel work, welded in built up sections framed work including cutting,
Rupees Nine Thousand Eight
hoisting, fixing in position and applying a priming coat of read lead
10 Hundred Seventy Eight and Forty Q
paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M.
ovarall height. . As Per Structural Design.
56.70 Providing & Fixing corrugated or Designed ISI Approved make 0.6
mm G.I Prelaminated sheets roofing fixed with galvanised iron “J” or
Rupees Seven Hundred Ninety Seven
11 “L” hooks bolts and nuts 8 mm diameter with bitumen and G.I. limpet Sq.m
washeres, filled with white lead complete in all recpect
11.60 Providing and fixing 150mm wide 450mm over all semicircular plain
G.I. sheet class -3 gutter with Iron brackets 40mm x 3mm size Bolts,
Rupees Five Hundred Fifty Five and
12 Nuts, washers etc. including making necessary connection with rain Sq.m
Seventy One Paisas Only
water pipes. (i) 0.80 mm thick sheet. (upto 10 ton)
63.50 Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse sand)
or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and jointed Rupees Nine Hundred Sixty Two and
with grey cement slurry mixed with pigment to match the shade of slab Thirty Three Paisas Only
including rubbing and polishing etc. complete. (A) 25mm thick (upto
11.70 20mm thick sand faced cement plaster on walls upto height 10 metres
above ground level consisting of 12mm thick backing coat of C.M. 1:3 Rupees Three Hundred Twenty Two
(1-cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1- and Eighty Eight Paisas Only
cement : 1-sand) etc. complete.
48.00 Painting two coats (excluding priming coat) on new steel and other
metal surfaces with enamel paint brushing, interior to give enamel paint Rupees Eighty Six and Ninety Four
brushing, interior to give an even shade including cleaning the surface Paisas Only
of all dift, dust and other foreign matter.
1.00 Finishing wall with weather proof exterior emulsion paint on wall
surface (two coats) to give an required shape even shade after
16 Rupees Twelve Thousand Only Job
thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials.etc complete
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of material proposed in
scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at % above / below % (should be writtern in figure and words) below / above the estimated rates mentioned above amount
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-12
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Estimated amount put to tender : . Estimated amount put to tender :
MAHUVA MUNICIPALITY
Signature of contractor
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-6
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Excavation for foundation upto 1.5 m depth including sorting out and
stacking of useful material and disposing of the excavated stuff upto 50 Rupees Four Hundred Forty Three
m lead.As Directed By Engineer ( C ) Hard Murrum and Eleven Paisas Only
Filling available excavated earth (excluding rock) in trenches
plinth,sides of foundations etc. in layers not exceeding 20 cm in depth Rupees One Hundred Twenty Nine
consolidating each deposited layer by ramming and watering etc. and Ten Paisas Only
Filling in foundation and plinth with murrum or selected soil in layers
Rupees Two Hundred Eighty Six and
3 9.00 of 20cm thickness including watering ramming and consolidating etc. 286.20 Cum
Twenty Paisas Only
complete( up to 10 ton)
Providing and Laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand
: 6 hand broken stone aggregate 40 mm nominal size ) and curing Rupees Two Thousand Nine
complete excluding cost of form work.( A ) Foundation and Plinth Hundred Seventy Six Only
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
Rupees Three Thousand Nine
curing complete Including cost of formwork and reinforcement for
5 2.30 3923.53 Hundred Twenty Three and Fifty Three Cum
reinforced concrete work in (A) Foundations, footings, Base or
columns and Mass concrete Minimum cement consumption: 360 kg per
cubic meter (kg/Cum).
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork and reinforcement for Rupees Six Thousand One Hundred
reinforced concrete work in (D) Columns, Pillars posts and struts upto Fifty Eight Only
floor two level. Minimum cement consumption: 360 kg per cubic meter
Providing TMT Bar FE 500/500D reinforcement for R.C.C. work
Rupees Seventy Five and Forty Six
7 605.00 including bending, binding and placing in position complete upto floor 75.46 KG
two level (upto 10 ton)
White stone Bela masonary block in course in Foundation with stone Rupees Five Thousand Eight
8 4.50 of approved quality in cement mortar 1:6 (1 cement : 6 coarse sand) 5844.38 Hundred Forty Four and Thirty Eight Cum
including racking the joints etc. complete Paisas Only
White stone Bela masonary block in course in super-structure with
Rupees Six Thousand One Hundred
9 2.50 stone of approved quality in cement mortar 1:6 (1 cement : 6 coarse 6110.03 Cum
Ten and Three Paisas Only
sand) including racking the joints etc. complete
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-6
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Steel work, welded in built up sections framed work including cutting,
Rupees Nine Thousand Eight
hoisting, fixing in position and applying a priming coat of read lead
10 14.74 9878.40 Hundred Seventy Eight and Forty Q
paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M.
ovarall height. . As Per Structural Design.
Providing & Fixing corrugated or Designed ISI Approved make
mm G.I Prelaminated sheets roofing fixed with galvanised iron “J” or
Rupees Seven Hundred Ninety Seven
11 56.70 “L” hooks bolts and nuts 8 mm diameter with bitumen and G.I. limpet 797.00 Sq.m
washeres, filled with white lead complete in all recpect
Providing and fixing 150mm wide 450mm over all semicircular plain
G.I. sheet class -3 gutter with Iron brackets 40mm x 3mm size Bolts,
Rupees Five Hundred Fifty Five and
12 11.60 Nuts, washers etc. including making necessary connection with rain 555.71 Sq.m
Seventy One Paisas Only
water pipes. (i) 0.80 mm thick sheet. (upto 10 ton)
Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse sand)
or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and jointed Rupees Nine Hundred Sixty Two and
with grey cement slurry mixed with pigment to match the shade of slab Thirty Three Paisas Only
including rubbing and polishing etc. complete. (A) 25mm thick (upto
20mm thick sand faced cement plaster on walls upto height 10 metres
above ground level consisting of 12mm thick backing coat of C.M. 1:3 Rupees Three Hundred Twenty Two
(1-cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1- and Eighty Eight Paisas Only
cement : 1-sand) etc. complete.
Painting two coats (excluding priming coat) on new steel and other
metal surfaces with enamel paint brushing, interior to give enamel paint Rupees Eighty Six and Ninety Four
brushing, interior to give an even shade including cleaning the surface Paisas Only
of all dift, dust and other foreign matter.
Finishing wall with weather proof exterior emulsion paint on wall
surface (two coats) to give an required shape even shade after
16 1.00 12000.00 Rupees Twelve Thousand Only Job
thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials.etc complete
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of material proposed in
scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at % above / below % (should be writtern in figure and words) below / above the estimated rates mentioned above amount
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-6
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Estimated amount put to tender : . Estimated amount put to tender :
MAHUVA MUNICIPALITY
Signature of contractor
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-16
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Excavation for foundation upto 1.5 m depth including sorting out and
Rupees Four Hundred Forty Three
1 7.80 stacking of useful material and disposing of the excavated stuff upto 50 443.11 Cum
and Eleven Paisas Only
m lead.As Directed By Engineer
Filling available excavated earth (excluding rock) in trenches
plinth,sides of foundations etc. in layers not exceeding 20 cm in depth Rupees One Hundred Twenty Nine
consolidating each deposited layer by ramming and watering etc. and Ten Paisas Only
Filling in foundation and plinth with murrum or selected soil in layers
Rupees Two Hundred Eighty Six and
3 1.00 of 20cm thickness including watering ramming and consolidating etc. 286.20 Cum
Twenty Paisas Only
complete( up to 10 ton)
Providing and Laying cement concrete 1:3:6 ( 1 cement : 3 coarse sand
: 6 hand broken stone aggregate 40 mm nominal size ) and curing Rupees Two Thousand Nine
complete excluding cost of form work.( A ) Foundation and Plinth Hundred Seventy Six Only
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
Rupees Three Thousand Nine
curing complete Including cost of formwork and reinforcement for
5 1.70 3923.53 Hundred Twenty Three and Fifty Three Cum
reinforced concrete work in (A) Foundations, footings, Base or
columns and Mass concrete Minimum cement consumption: 360 kg per
cubic meter (kg/Cum).
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork and reinforcement for Rupees Six Thousand One Hundred
reinforced concrete work in (D) Columns, Pillars posts and struts upto Fifty Eight Only
floor two level. Minimum cement consumption: 360 kg per cubic meter
Providing TMT Bar FE 500/500D reinforcement for R.C.C. work
Rupees Seventy Five and Forty Six
7 445.50 including bending, binding and placing in position complete upto floor 75.46 KG
two level (upto 10 ton)
White stone Bela masonary block in course in Foundation with stone Rupees Five Thousand Eight
8 2.40 of approved quality in cement mortar 1:6 (1 cement : 6 coarse sand) 5844.38 Hundred Forty Four and Thirty Eight Cum
including racking the joints etc. complete Paisas Only
White stone Bela masonary block in course in super-structure with
Rupees Six Thousand One Hundred
9 1.40 stone of approved quality in cement mortar 1:6 (1 cement : 6 coarse 6110.03 Cum
Ten and Three Paisas Only
sand) including racking the joints etc. complete
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-16
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Steel work, welded in built up sections framed work including cutting,
Rupees Nine Thousand Eight
hoisting, fixing in position and applying a priming coat of read lead
10 9.73 9878.40 Hundred Seventy Eight and Forty Q
paint. (D) In trussses and trussed purlins, upto 25 M. span and 15 M.
ovarall height. . As Per Structural Design.
Providing & Fixing corrugated or Designed ISI Approved make
mm G.I Prelaminated sheets roofing fixed with galvanised iron “J” or
Rupees Seven Hundred Ninety Seven
11 27.00 “L” hooks bolts and nuts 8 mm diameter with bitumen and G.I. limpet 797.00 Sq.m
washeres, filled with white lead complete in all recpect
Providing and fixing 150mm wide 450mm over all semicircular plain
G.I. sheet class -3 gutter with Iron brackets 40mm x 3mm size Bolts,
Rupees Five Hundred Fifty Five and
12 5.50 Nuts, washers etc. including making necessary connection with rain 555.71 Sq.m
Seventy One Paisas Only
water pipes. (i) 0.80 mm thick sheet. (upto 10 ton)
Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1-cement : 6-coarse sand)
or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and jointed Rupees Nine Hundred Sixty Two and
with grey cement slurry mixed with pigment to match the shade of slab Thirty Three Paisas Only
including rubbing and polishing etc. complete. (A) 25mm thick (upto
20mm thick sand faced cement plaster on walls upto height 10 metres
above ground level consisting of 12mm thick backing coat of C.M. 1:3 Rupees Three Hundred Twenty Two
(1-cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1- and Eighty Eight Paisas Only
cement : 1-sand) etc. complete.
Painting two coats (excluding priming coat) on new steel and other
metal surfaces with enamel paint brushing, interior to give enamel paint Rupees Eighty Six and Ninety Four
brushing, interior to give an even shade including cleaning the surface Paisas Only
of all dift, dust and other foreign matter.
Finishing wall with weather proof exterior emulsion paint on wall
surface (two coats) to give an required shape even shade after Rupees Eleven Thousand Six
thoroughly brushing the surface to remove all dirt, and remains of loose Hundred Sixty Five Only
powdered materials.etc complete
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting the cost of material proposed in
scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at % above / below % (should be writtern in figure and words) below / above the estimated rates mentioned above amount
MAHUVA MUNICIPALITY-MAHUVA
DIST: BHAVNAGAR
NAME OF WORK :- CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NO-16
Quantities Estimated Estimated Rates Total Amount according to
Quantities Estimated Estimated Rates Total Amount according to
Item No. but may be more or Item Descrption Unit
estimated quantities.
in Figure in Words
Estimated amount put to tender : . Estimated amount put to tender :
MAHUVA MUNICIPALITY
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.Form B-1.pdf
3.Schedule B.pdf
4.Term and condition-4.pdf
5.Specifications of Building Work.pdf
6.Vendor Civil work.pdf
7.TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
8.Finance Dept GR.pdf
9..R and B GR.pdf
10 Circular compressed.pdf
1.Tender (5th Attempt).pdf
Download all tender documents and submit your bid