| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.8 L+₹94,126.30 (4.52%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹22.0 L+₹1.1 L (5.49%)Rejected-Finance | L3 | Rejected-Finance THIRD LOWEST | |
| 4 | Rejected-Technical | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical | - | Rejected-Technical L7 |
Tender Value
₹24.2 L
EMD Value
₹50,000
Closing Date
13 Aug 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER Minor Irrigation Division Kottayam
This work is proposed for Side Protection Works to Chakini Thodu in ward No. 12 of Mutholy PanchayathThe proposed site is having a bank height of 5 m, hence 5m super structure with DR masonary is proposed. A total length of 69.50 m is proposed.
2024_Irrig_683849_1
IRR/IA/TR/7033/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
360 days
Ward No. 12 of Mutholy Panchayath
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
21 Nov 2024
2 Aug 2024
16 Aug 2024
2 Aug 2024
13 Aug 2024
2 Aug 2024
Amount
Protection work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
LORANCE JOSEPH
DAWN MATHEW
SREEDHARAN E K
Aravind U
SUNNY JOSEPH
Sinthol Thomas
Bidder Name
SUNNY JOSEPH
Sinthol Thomas
Aravind U
DAWN MATHEW
SREEDHARAN E K
TOJU JOSEPH
LORANCE JOSEPH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1064010.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .