Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC Technically acceptable L1 |
Tender Value
₹2.8 L
EMD Value
₹5,580
Closing Date
1 Aug 2023, 1:00 pmClosed
Dean (Admin)
Institute for Plasma Research (IPR), Near Indira Bridge, Bhat, Gandhinagar-382428
Construction of Pathway to access the EML Laboratory Near New pump house at IPR Campus, Bhat, Gandhinagar.
2023_IPR_760231_1
IPR/TN/CIVIL-PR/01/2023
Limited
Civil Works - Buildings
Item Rate
35 days
IPR Campus, Bhat, Gandhinagar
As per Tender Document
7 documents required · 7 mandatory
₹0
₹5,580
25 Sept 2023
7 Jul 2023
2 Aug 2023
7 Jul 2023
1 Aug 2023
21 Jul 2023
7 Jul 2023 - 13 Jul 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including cutting, filling, and Surface dressing, as well as getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Complete in all respect as directed by EIC. All kinds of soil.
Providing and laying in position Cement Concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) Complete in all respect as directed by EIC.
Supplying and filling in plinth with Sand under floors, including watering, ramming, consolidating and dressing complete. Complete in all respect as directed by EIC.
Providing, Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, Grade Slab, Coping etc. for mass concrete. Complete in all respect as directed by EIC.
Providing and laying Brick work with common burnt clay F.P.S. (non modular) bricks of Class Designation 5.0 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) Complete in all respect as directed by EIC.
Providing and laying 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge. Complete in all respect as directed by EIC.
Providing, laying, position and fixing of Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding with soft drawn annealed binding wire of dia not less than 1mm with 2 stands etc, all complete upto plinth level. Complete in all respect as directed by EIC. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing, applying and Finishing walls with Acrylic Smooth Exterior Paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm). Complete in all respect as directed by EIC.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_799259.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .