| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC Lowest rate and hence the work is awarded to the Contractor Vide Resolution No.9(1) dtd.11/08/2026 of Areacode Block Panchayatt | |
| 2 | L2₹5.2 L+₹22,360.27 (4.52%)Rejected-AOC | L2 | Rejected-AOC Higher rate hence rejected | |
| 3 | L3₹5.3 L+₹35,021.62 (7.08%)Rejected-Finance | L3 | Rejected-Finance Higher rate hence rejected | |
| 4 | L4₹5.4 L+₹45,363.94 (9.16%)Rejected-Finance | L4 | Rejected-Finance Higher rate hence rejected |
| Sl No | Description | Qty | Unit | FYSAL P L3 | ASHRAF CHIRAYIMMAL L1 | MPB L4 | FAYIS P. L2 |
|---|---|---|---|---|---|---|---|
| 1.00Pond maintanance | |||||||
| 1.00 | OD549722/2025-2026:Demolishing DR work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 51.23 | cum | 598.07 ₹30,637.93 | 519.4 ₹26,607.82 | 500 ₹25,614 Lowest | 583.82 ₹29,907.93 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 16.93 | cum | 211.43 ₹3,579.3 | 197.5 ₹3,343.48 Lowest | 200 ₹3,385.8 | 206.39 ₹3,493.98 |
| 1.00 | OD549721/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 40.98 | cum | 1,408.22 ₹57,711.67 | 1,369.3 ₹56,116.65 Lowest | 1,600 ₹65,571.2 | 1,374.65 ₹56,335.91 |
| 1.00 | OD549720/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 54.47 | cum | 3,277.42 ₹1,78,514.51 | 3,060.9 ₹1,66,721.1 Lowest | 3,300 ₹1,79,744.4 | 3,199.29 ₹1,74,258.93 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 16.72 | sqm | 316.92 ₹5,298.9 | 296 ₹4,949.12 Lowest | 350 ₹5,852 | 309.36 ₹5,172.5 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.14 | cum | 7,579.93 ₹76,845.33 | 7,079.1 ₹71,767.92 Lowest | 8,200 ₹83,131.6 | 7,399.23 ₹75,013.39 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 307.23 | kilogram | 92.26 ₹28,345.32 | 86.2 ₹26,483.48 Lowest | 100 ₹30,723.3 | 90.06 ₹27,669.4 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 80 | hour | 283.58 ₹22,686.4 | 264.8 ₹21,184 | 250 ₹20,000 Lowest | 276.82 ₹22,145.6 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 501.4 | kg | 153.51 ₹76,969.91 | 143.4 ₹71,900.76 Lowest | 150 ₹75,210 | 149.85 ₹75,134.79 |
Tender Value
₹5.9 L
EMD Value
₹14,829
Closing Date
22 Jul 2026, 11:00 amClosed
Assistant Engineer
Office of Asst Exe Engineer Areacode B P
Annual Plan-AREEKODE BP - 2025-26 PROJECT NO.259 RENOVATION OF ARODIYIL POND IN KUZHIMANNA GP-Pond maintanance-General Civil Work
2026_LSGD_860551_1
AE/LSGD/AKD SD/TENDER-2/2026-27
Open Tender
Civil Works - Others
Item Wise
330 days
Areacode Block Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,829
Yes
8 Oct 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
14 Jul 2026 - 22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pond maintanance | |||||
| 1.001 | OD549722/2025-2026:Demolishing DR work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | - | cum | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.003 | OD549721/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.004 | OD549720/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kilogram | - | - |
| 1.008 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.009 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1455226.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
preag_arodiyil.pdf
Tender Documents • 0.26 MB
viewsbd_arodi.pdf
Tender Documents • 1.97 MB
affi_arodiyil.pdf
Tender Documents • 0.24 MB
epay_arodi.pdf
Tender Documents • 0.24 MB
fot_arodiyil.pdf
Tender Documents • 0.25 MB
ipact_arodiyil.pdf
Tender Documents • 0.23 MB
BOQ_1455226.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .