| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹72.0 CrAccepted-AOC | ₹72.0 Cr | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹79.7 CrRejected-Finance | ₹79.7 Cr | L-2 | Rejected-Finance Other than L-1 Bidder. |
| 3 | L-3₹81.5 CrRejected-Finance | ₹81.5 Cr | L-3 | Rejected-Finance Other than L-1 Bidder. |
| 4 | L-4₹83.4 CrRejected-Finance 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹83.4 Cr | L-4 | Rejected-Finance Other than L-1 Bidder. |
| 5 | L-5₹83.7 CrRejected-Finance HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹83.7 Cr | L-5 | Rejected-Finance Other than L-1 Bidder. |
Tender Value
₹80 Cr
EMD Value
₹15 L
Closing Date
13 Dec 2021, 6:00 pmClosed
HQ CE Siliguri Zone
HQ Chief Engr Siliguri Zone, MES, PO Salugara, Dist Jalpaiguri, PIN 734008
PROVN OF MARRIED ACCOMMODATION AND OTM ACCOMMODATION FOR PINAKA (PH-II) AT SUKNA
2021_MES_458896_1
98734/SUK/SZ/E8
Open Tender
Construction Works
1095 days
Sukna
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
GE (P) Gangtok
₹15 L
Yes
HQ CE SILIGURI ZONE
24 Jan 2022
12 Jul 2021
14 Dec 2021
12 Jul 2021
13 Dec 2021
3 Dec 2021
12 Jul 2021 - 31 Jul 2021
3 Aug 2021
Amount
DESIGN & CONSTRUCTION FOR PROVISION OF MARRIED ACCOMMODATION AND OTM ACCOMMODATION INCLUDING ALL INTERNAL AND EXTERNAL SERVICES AT SUKNA COMPLETE AS DETAILED IN ANNEXURE 'I' TO XXIII', SCOPE OF WORK AND OTHER DOCUMENTS OF THE TENDER.
BREAK UP PERCENTAGE (REFER SCH 'A' NOTE No. 9)
Building & Structure (Annexure-I)
Topographic Survey (Annexure-II)
Soil Investigation (Annexure-III)
Planning, Designing and Drawing (Annexure-IV)
Site Clearance / Site Development (Annexure-V)
Retaining Wall (Annexure-VI)
Road / Path / Culvert (Annexure-VII)
Sewage Disposal (Annexure-VIII)
Area Drainage (Annexure-IX)
Security Wall, Fencing and Gate (Annexure-X)
External Electric Supply (Annexure-XI)
External Water Supply (Annexure-XII)
Fire Fighting and Fire Alarm (Annexure-XIII)
Lift (Annexure-XIV)
STP (Annexure-XV)
Solar Hot Water (Annexure-XVI)
Lightening Protection (Annexure-XVII)
Standby DG Set (Annexure-XVIII)
Air Conditioning (Annexure-XIX)
Cooling Appliances (Annexure-XX)
Hot Water Supply (Annexure-XXI)
EOT Crane (Annexure-XXII)
Manning & Operation of Lift & STP (Annexure-XXIII)
Sub total
Rds Project ltd.
GANGA INFRABUILD PVT LTD
Shree Gautam Construction Co. Ltd.
Harsh Constructions Private Limited
Komal Buildcon Pvt. Ltd.
Som Projects Pvt Ltd
Cognition Projects Pvt. Ltd.
Agarwal Jagdish Construction Company Pvt. Ltd.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid