Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
14 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (WMS)
CPOH ADI
13 conditions · 2 needing a document upload
Being Single Tender with authorized dealer of OEM (i.e., M/s. GMMCO LIMITED-SURAT authorized dealer of CATERPILLAR make Engine), Financial Eligibility Criteria is not applicable.
Being Single Tender with authorized dealer of OEM (i.e., M/s. GMMCO LIMITED-SURAT authorized dealer of CATERPILLAR make Engine), Technical Eligibility Criteria is not applicable. Similar work means - Being Single Tender with authorized dealer of OEM, SIMILAR WORK is not applicable. Definition of Similar Work: - N.A.
63 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The payment towards earnest money (EMD) against the works tenders should be made as brought out in GCC April 2022, Para 5: (Bid Security) PART I Instructions to Tenderers (ITT) & Para 6 (a to d) of Tender Form (Second Sheet) and as per GCC 2022 ACS 11. Railway Board letter no. 2022|CE-UCTIGCC- 2022[POLICY/Pt.I (E-3320424) dated 13.03.2026.
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' and Labour Cooperative Societies shall submit Registration Certificate issued by appropriate authority.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period
In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured:
A scanned copy of the Bank Guarantee shall be uploaded on e- Procurement Portal (IREPS) while applying to the tender.
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last 2.3.2 date of submission of bids). (Corrigendum: Para 5(3) ii Part I of GCC has been modified vide Advance Correction Slip No. 5 Railway Board's letter no. 2022/CE-l/CT/GCC-2022/Policy Dated 20.10.2023)
Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender.
The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered 2.3.5 during bid submission time, FAILING WHICH THE BID WILL BE REJECTED.
The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid 2.3.6 for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope.
The envelope shall be addressed to the officer and address as mentioned in the tender document.
Submission of Tenders: Tenders should be submitted as brought out in GCC April 2022, Para 6: (Care in Submission of Tenders) PART I Instructions to Tenderers (ITT).
ANNEXURE - I - TENDER FORM (First Sheet) is to be submitted mandatorily.
Applicability of rules for this tender
Indian Railways Standard General Conditions of Contract updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents. (GCC April 2022)
IR Specifications/Guidelines updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents
Relevant B.I.S. Codes updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents
Stamp Duty is applicable as per Stamp Act with latest amendments as applicable in the State.
Rights of the Railway to deal with Tender: As per GCC April 2022, Para 7, 8 & 9 Tender Form (Second Sheet), PART I Instructions to Tenderers (ITT).
Payment of Royalty Charges
All taxes, royalty charges, etc. of whatever nature in connection with the work including extraction and supply of rubble stone/stone ballast/sand/moorum earth or any other material used on the work shall have to be borne by the Contractor. The Contractor will be required to obtain a royalty clearance certificate from the concerned Revenue Authorities/Collector and produce the same to the Engineer after completion of the supply but before release of the final bill.
Royalties and Patent Rights: (a)The Contractor shall defray the cost of all royalties, fees and other payments in respect of patents, patent rights and licenses which may be payable to patentee, licensee or other person or corporation and shall obtain all necessary licenses. (b)The contractor shall indemnify, the Railway or any agent, servant or employee of the Railway against any action, claim or proceedings relating to infringement use of any patent or design any alleged patent or design rights and shall pay any royalties or other charges which may be payable in respect of any articles or materials or part thereof included in the contract. In the event of any claim being made or action being brought against the Railway or any agent, servant or employee of the Railway in respect of any such matters, as aforesaid, The contractor shall indemnify notified thereof. Provided that such indemnify shall not apply when such infringement has taken place in complying with the specific direction issued by the Railway but the contractor shall pay any royalties or other charges payable in respect of any such use.
SPECIAL CONDITION FOR TAX DEDUCTION
In respect of works, a deduction of 2% from each of the Contractor's bills shall be made in terms of section 194(C) of the Income Tax Act of 1961 & 1991 and as per instructions issued from time to time (Surcharge will also be deducted along with I. Tax as per extent rules).
The Railway will deduct sales tax if leviable in a particular state where the work is going on, the gross amount of each bill while making payment to the contractor(s). The recovery shall be governed as per the guide lines & rates prescribed by the concerned State Government.
Any Other taxes The Contractor shall bear in full all taxes and royalties levied by the State Government and/or Central Government from time to time. This would be entirely a matter between the contractor and State Government/or Central Government. Railway will recover the taxes and royalties through final bills if the contractor fails to pay the taxes and royalties to the Government.
EMERGENCY WORK In the event of any accident or failure occurring in the execution of work/ arising out of it which in the opinion of the Engineer requires immediate attention, the Railway may bring its own workmen or other agency/agencies to execute or partly execute the necessary work or carry out repairs if the Engineer-in-charge considers that the contractor(s) is/are not in a position to do so in time without giving any notice and charge the cost thereof, to be determined by the Engineer- in-charge, to the contractor.
DAMAGE BY ACCIDENT/ FLOOD/ TIDES OR NATURAL CALAMITIES The Contractor shall take all precautions against damages from accidents, floods tides or other natural occurrences. He shall not be entitled to any compensation for his tools, plants, materials, machines and other equipment lost or damaged by any cause whatsoever. The Contractor shall be liable to make good the damage to any structure or part of a structure, plant or material of every description belonging to the Railway covered under the Contract, lost or damaged by him due to any cause during the course of execution of work. The Railway Administration will not be liable to pay the contractor any charge for rectification or repair to any damage which may have occurred from any cause what so ever.
INCLUSION OF LETTER OF CREDIT AS MODE OF PAYMENT For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit(LC)arrangement. (Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2018)
CHANGE IN ADDRESS: Any change in the address of the contractor shall be forthwith intimated in writing to the Railway. The Railway will not be responsible for any loss/ inconvenience suffered by the Contractor on account of his failure to comply with this.
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
General Condition of Contract shall mean General Condition of Contract - April 2022 as contained in Western Railway, Engineering Department, with up-to-date correction slip, up to the date of inviting tender, whichever is applicable.
DISASTER MANAGEMENT"All the available vehicles and equipment of the contractor can be drafted by the Railway Administration in case of accidents/ natural calamities involving human lives. The payment for such drafting shall be made according to the rates as shall be fixed by the Engineer. However, if the contractor is not satisfied with the decision of the Engineer in this respect, he may appeal to the Chief Workshop Manager within 30 Days of getting the decision of the Engineer, supported by analysis of the rates claimed. The Chief Workshop Manager's decision, after hearing both parties in the matter, would be final and binding on the contractor and the Railway".
The bidder has to submit rates schedule wise on IREPS portal & also item wise rates in the Annexure attached with NIT. In the event of any discrepancy, variation, or inconsistency between the schedule item-wise rates quoted on the IREPS portal (within the Financial Tabulation tab) and the detailed breakdown specified in the tender Annexure, the item-wise rates provided in the Annexure shall take absolute precedence and shall be considered final for evaluation and award purposes. Because the financial reasonableness of the offer is strictly assessed on an item-by-item basis (item-wise LAR basis), the comprehensive item-wise rate breakup furnished within the Annexure shall be considered for evaluation. Consequently, for all schedule items, including any additional or multi-item structures where the individual rates originate from the Annexure, the itemized rates shall dictate the valuation over any figures displayed on the IREPS portal.
Annual Maintenance Contract for service, maintenance, and overhauling of CATERPILLAR-make engine for the year 2026-27.
CWMCPOHADI2026-27-4~WR
CWMCPOHADI2026-27-4
Single
Works - General
7 Months
Ahmedabad, Gujarat
₹0
₹3.5 L
20 Aug 2026
20 Aug 2026
31 Aug 2026
4 items across 1 schedule · ₹5,09,629.02 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | CYLINDER HEAD | Per Unit | 3.00 | 90,747.9 | 2,72,243.7 |
| 2 | LUBE OIL PUMP | Per Unit | 3.00 | 22,644.2 | 67,932.6 |
| 3 | WATER PUMP | Per Unit | 3.00 | 33,840.04 | 1,01,520.12 |
| 4 | OIL COOLER | Per Unit | 3.00 | 22,644.2 | 67,932.6 |
| Schedule total | ₹5,09,629.02 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureA.pdf
ATTACHMENT
ALLCORRECTIONSLIP1TO12MERGED_compressed.pdf GCC Correction Slips 1 to 12
ATTACHMENT
GCC 2022
ATTACHMENT
SPECIALCONDITIONSFORCATERPILLAR.pdf
ATTACHMENT
SCOPEOFWORKFORCATERPILLAR.pdf
ATTACHMENT
AnnexureA_1.pdf
ATTACHMENT
AnnexureB.pdf
ATTACHMENT
AnnexureC.pdf
ATTACHMENT
AnnexureD_1.pdf
ATTACHMENT
AnnexureF1.pdf
ATTACHMENT
AnnexureG.pdf
ATTACHMENT
ALLCORRECTIONSLIP1TO12MERGED_compressed.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].