| 1 | L1₹20.4 LAccepted-AOC | L1 | Accepted-AOC As per board resolution no 10 1 date20022021 | |
| 2 | L2₹21.7 L+₹1.4 L (6.81%)Rejected-Finance | L2 | Rejected-Finance As per board resolution no 10 1 date20022021 | |
| 3 | L3₹22.0 L+₹1.6 L (7.93%)Rejected-Finance THEKKEDESAM POST 678553 | PALAKKAD | KERALA | 678553 | L3 | Rejected-Finance As per board resolution no 10 1 date20022021 | |
| 4 | L4₹24.2 L+₹3.8 L (18.8%)Rejected-Finance | L4 | Rejected-Finance As per board resolution no 10 1 date20022021 | |
| 5 | L5₹24.3 L+₹3.9 L (19.3%)Rejected-Finance | L5 | Rejected-Finance As per board resolution no 10 1 date20022021 |
Tender Value
Refer Docs
EMD Value
₹40,500
Closing Date
20 Feb 2021, 2:00 pmClosed
Assistant Executive Engineer LSGD Sub Division Chi
Office of AEE LSGD Sub Division Chittur BP Nattukal PO Pin678554
2020 21 CHITTUR BP Construction of Perumatty Kaitharavu Check Dam
2021_LSGD_413148_4
4/AEE/LSGD/CTR/2020-21
Open Tender
Civil Works - Others
Item Rate
540 days
Perumatty
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
Yes
₹40,500
Yes
8 Mar 2021
12 Feb 2021
22 Feb 2021
12 Feb 2021
20 Feb 2021
12 Feb 2021
Amount
Check Dam Construction
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.5.1 : DOWEL BARS - Supplying and providing MS dowel bars of size 20 mm dia , 1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
60.3 : Supplying and fixing structural steel channel ISMC 75X40mm for holding shutter planks including cutting ,hoisting fixing in position with material and labour charges etc complete
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
MANUPRASAD
RADHAKRISHNAN. K
MUSAFFAR AHAMMED M
TOJI RAPHAL P
Bidder Name
TOJI RAPHAL P
RADHAKRISHNAN. K
MUSAFFAR AHAMMED M
Suresh K PWD Contractor Nattukal
MANUPRASAD
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587325.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .