Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance MANJAMPATTI | MANJAMPATTI | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,180
Closing Date
11 Jul 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(V.Pt), Kulithalai
BDO(V.Pt), Kulithalai
Construction of School Toilet Girls at PUMS Kumaramangalam
2023_RDTN_334275_1
Construction of School Toilet Girls at PUMS
Open Tender
Civil Works - Others
Item Wise
90 days
Kulithalai Union Office
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,180
Yes
13 Jul 2023
1 Jul 2023
11 Jul 2023
1 Jul 2023
11 Jul 2023
1 Jul 2023
Amount
Name of the Work : Construction of School Toilet (Girls) at PUMS H/O Kumaramangalam
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying and Filling of conveyed earth for basement filling including all charges etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete. Roof
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC work per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2:3 mix using 20 mm ISS HBG metal for RCC itemsincluding cost and conveyance
Plastering with cement Morter 1:5 12mm thick in all floors including curing etc.,. complete complying with standard specification and as directed rials and labour
Plastering with cement Morter 1:3 10mm thick in all floors including curing etc... complete complying with standard specification and as directed rials and labour
Distembering two coats with best approved distember including ncost and conveyance of all materials and and all labour charges etc complete.
Painting two coats of approved Exterior emulsion paint over one priming coat of old wall surface including cleaning preparing the surface and curing etc complete.
Painting two coats of new iron work such as steel doors, Window, Ventilators, Window bars, Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Suppling and fixing in position best Furopeon Water Closet with all fatings and 10lit Capacity flusing tank including cost and conveyance of all materials to site and all labour charges etc.,
Supplying and fixing white glazed earthen ware Wash hand basin of size 550x400mm cleding cost and conveyance of all materials to site and all labour charges etc.
Supplying and fixing 500 lit capacity PVC Tank including cost and conveyance of all materials to site and all labour charges etc.
Supplying and fixing in position of G.I Pipe Hand Rails 40mm including cost and conveyance of all materials to site and all labour charges etc.
Providing Granolithic floor finish with CC 1:24 using 10-12mm hg jelly 25mm thickk including cost and conveyance etc complete.
Dadooing walls Plain Galred tiles of size 130x150xfimm including including cost and conveyance etc complete.
Supply, Cost & Fabrication of Steel Door & Window including all charges etc, complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SEERANGAMMAL P
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .