| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.0 LAdmitted-Finance 1ST FLOOR 1 ST FLOOR GOLDMINE JEWEL COMPLEX BESIDE D MART SECTOR 26 GANDHINAGAR BHAVNAGAR GUJARAT 364710 UDYAM GJ 27 0001016 | BOTAD | GUJARAT | 364710 | ₹52.0 L | L1 | Admitted-Finance |
| 2 | L2₹52.6 LAdmitted-Finance 1 56A JAHURA BAZAR LANE KOLKATA 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | ₹52.6 L | L2 | Admitted-Finance |
| 3 | L3₹52.6 LAdmitted-Finance | ₹52.6 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | OM LOKENATH ASSOCIATES L3 | SUBRATA MONDAL L2 | R.R. ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Construction of civil foundations for Second main bus at Behala 132/33KV Sub-Station, under Behala Area Office, WBSETCL. under A.C.E KTZ | 1 | Nos | 52,62,800.5 ₹52.6 L | 52,61,379.87 ₹52.6 L | 51,99,793.61 ₹52.0 L |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
10 Apr 2026, 3:00 pmClosed
Additional Chief Engineer KTZ
The Additional Chief Engineer, Kolkata Transmission Zone,3rd Floor, Administrative Building Kasba 220 KV Sub Station Premises,21, Chowbaga Road, P.O.and P.S.- Tiljala, Kolkata -700039
Construction of civil foundations for Second main bus at Behala 132/33KV Sub Station, under Behala Area Office, WBSETCL. under A.C.E KTZ
2026_SETCL_1022594_1
ACE/KTZ/CIVIL/Behala/ 2025-26/16 DT14.03.26
Open Tender
CIVIL WORKS
180 days
Behala 132/33KV Sub-Station, under Behala Area Off
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹47,000
KTZ, WBSETCL, NEW ADMINISTRATIVE BUILDING, 3RD FLO
21 May 2026
14 Mar 2026
16 Apr 2026
14 Mar 2026
10 Apr 2026
25 Mar 2026
14 Mar 2026 - 19 Mar 2026
24 Mar 2026
Construction of civil foundations for Second main bus at Behala 132/33KV Sub-Station, under Behala Area Office, WBSETCL. under A.C.E KTZ
Percentage BoQ
BoQ_Ver3.0
NIT No.:- ACE/KTZ/CIVIL/Behala/2025-26/16, Dated: 14.03.2026
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof.
1 Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)
(a) Depth upto 1.5 m.
(b) For additional depth beyond 1.5 m. and upto 3.00m
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety](a) 1:3:6 proportion
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. for SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge
Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect. (only the area in contact with concrete to be measured)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]With 1:6 cement mortar15 mm thick plaster.
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Brick work rate In foundation and plinth (1:6)
Supplying, fitting, fixing bolts with nuts, washer: (ii) 20 to 38 mm dia bolt:Length above 150mm
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_2513208.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid