Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Fee/PreQual/Technical/Finance AT CHICHIPUR P O SASHANGAC P S DELANG DIST PURI PIN 752016 | PURI | PURI | ODISHA | 752016 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.9 L+₹1.8 L (21.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹11.8 L+₹3.6 L (44.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.8 L
EMD Value
₹11,764
Closing Date
18 Jul 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION, PURI
PDK road to Sujanpur_Road_BUSG,SDBC,berm filling with Earth0.150 to 0.760
2026_CERWI_135354_1
Online-01 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
60 days
Puri
2 documents required · 2 mandatory
₹6,000
₹11,764
Yes
19 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
10 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation , grass, bushes,shrubs, saplings & trees girth upto 300 mm, removal of stumps of such trees cut earlier & disposal of unserviceable materials by manual means & stacking of serviciable materials to be used or acutioned, upto a lead of 1000 m including removal & disposal of top organic soils not exceeding 150 mm in thickness as per technical specification clause 210 & as per direction of the Engineer-in-Charge. | 1,800 | sqm | 8.63 | ₹15,534 |
| 2 | Labour for scraping cleaning the road suface applying tack coat using 3.0 kg of bitumen for 10 Sqm and laying 37.5 mm thick built up spray grouting in one layer using 0.45 cum of 25 mm to 40 mm size hard granite metal and 12.00 kg penetration grade of bitumen for 10 sqm with 0.12 Cum of 12 mm size hard granite chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with PRR including hire and running charges of PRR and all other machineries but excluding cost and conveyance of bitumen ,metal and chips complete as per specification and direction of Engineer in charge. | 154.39 | sqm | 407.37 | ₹62,893.85 |
| 3 | Providing and applying tack coat using bitumen emulsion RS-I@ 0.20kg per sqm on the prepared bitumenous surface/granular base treated with primer/ granular base (not primed) cleaned surface including cost of all materials, labour , T&P etc. complete as per the specification and direction of the Engineer-in-Charge. | 2,250 | sqm | 11.23 | ₹25,267.5 |
| 4 | Providing and laying semi dense graded bituminous concrete with batch type hot mix plant using crushed agreegates of specified grading , premixed with bituminous binder of 60/70 penetration grade of bitumen ,transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade , level and alignment, rolling with smooth wheeled ,vibratory and tandem rollers to achive the desired compaction as per clause 508 of MoSRT&H specification for the road and bridge works (4th Revision) . | 61.87 | cum | 13,914.65 | ₹8,60,899.4 |
| 5 | Providing the road surface in the both sides of berm manually with approved quality of moorum including all labour charges for spreading, laying, levelling for the work including cost, conveyance, royality and taxes of all materials, finished item of works as per the specification and direction of the Engineer-in-Charge. | 90 | cum | 1,307.93 | ₹1,17,713.7 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site by mechanical means within a lead of 5 kms, spreading, grading to required slope & compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H specifications forRoad & Bridge works (4th Revision) | 468 | cum | 201.12 | ₹94,124.16 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_600948.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .