| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.6 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹88.0 L+₹8.3 L (10.5%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹88.0 L+₹8.3 L (10.5%)Rejected-Finance NO 2 AIRPORT GATE MOTILAL COLONY P O RAJBARI KOLKATA 700 081 | KOLKATA | KOLKATA | WEST BENGAL | 700081 | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.0 Cr+₹22.0 L (27.7%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.1 Cr+₹29.4 L (36.9%)Rejected-Finance NO 10 44 GURU SARAVANA FLAT 19TH STREET NANGANALLUR CHENNAI 600 061 | CHENNAI | TAMIL NADU | 600061 | L5 | Rejected-Finance L5 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
9 May 2022, 6:00 pmClosed
AGM Engg Civil
AAI Operational Building 1st Floor Kolkata 700 052
Connecting drain in between existing drain at Gate no 01 and drain towards VIP Road at NSCBI Airport Kolkata
2022_AAI_113206_1
AAI/Kol/E-C/Connecting Drain/22-23
Open Tender
Civil Works
Item Rate
180 days
Kolkata
Please refer Tender Document
2 documents required · 2 mandatory
₹1,180
₹2.4 L
27 Sept 2022
18 Apr 2022
13 May 2022
18 Apr 2022
9 May 2022
18 Apr 2022
18 Apr 2022 - 2 May 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.a)All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.a) All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. a) All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 (graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: a)1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : a)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for :a) Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for :a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for :a) Suspended floors, roofs, landings, balconies and access platform.
Centering and shuttering including strutting, propping etc. and removal of form for :a)Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for :a)Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for :a)Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).a) All works upto plinth level
Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable /recoverable separately.a) Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)
Add for using extra cement in the items of design mix over and above the specified cement content therein.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:a) Cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : a) Cement mortar 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. a) 40 mm thick with 20 mm nominal size stone aggregate
12 mm cement plaster of mix : a)1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix :a)1:6 (1 cement: 6 fine sand)
6 mm cement plaster of mix : a) 1:3 (1 cement : 3 fine sand)
Neat cement punning
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :a)Water thinnable cement primer
Finishing walls with water proofing cement paint of required shade :a) New work (Two or more coats applied @ 3.84 kg/10 sqm)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :a) bituminous road
M/S. S.R.ENTERPRISE
M/s. A S Traders
Chinmoyee Construction
RECHI CONSTRUCTION PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .