Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | L1 | Admitted-Finance | |
| 2 | L2₹8.2 L+₹19,873.86 (2.48%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.3 L+₹25,806.23 (3.22%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹8.4 L+₹38,590.66 (4.81%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Not Admitted-Fee/PreQual/Technical GURGAON HARYANA 122002 UDYAM HR 05 0027927 | GURUGRAM | HARYANA | 122002 | - | Not Admitted-Fee/PreQual/Technical Others-EMD not received in RE Office/ DPH, BBMB(P.W.) as mentioned in PQC document of NIT.( Kindly refer Pre Qualifying Criteria of NIT) |
| Sl No | Description | Qty | Unit | PAWAN KUMAR L1 | RAJ KUMAR L3 | Vineet Kumar L4 | OASIS ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work of silt clearance of channels and drains :- (b ) Basket work with combined lead up to 7.50 metres undressed | 32.11 | Cum | 100 ₹3,211 Lowest | 200 ₹6,422 | 126.42 ₹4,059.35 | 300 ₹9,633 |
| 2.00 | Earth work of silt clearance of channels and drains: (d) Extra for every 7.5 metres additional lead. Lead 90.5 mtr | 32.11 | Cum | 35 ₹1,123.85 Lowest | 180 ₹5,779.8 | 50.57 ₹1,623.8 | 250 ₹8,027.5 |
| 3.00 | Earth work containing Gravel (in loose from in non cohesive binding material) work in excavation with occasional use of picks exclusive of compensation of earth undressed with combined lead upto 15 metres with percentage of grave lor Kankar (c) Exceeding 80 % but upto 100 %. | 27.6 | Cum | 200 ₹5,520 Lowest | 200 ₹5,520 Lowest | 245.47 ₹6,774.97 | 325 ₹8,970 |
| 4.00 | Earth work containing Gravel (in loose from in non cohesive binding material) work in excavation with occasional use of picks exclusive of compensation of earth undressed with combined lead upto 15 metres with percentage of grave lor Kankar (d) Extra for every 7.5 metres additional lead beyond 15 m. | 27.6 | Cum | 75 ₹2,070 Lowest | 190 ₹5,244 | 88.49 ₹2,442.32 | 200 ₹5,520 |
| 5.00 | Earth work containing Gravel (in loose from in non cohesive binding material) work in excavation with occasional use of picks exclusive of compensation of earth undressed with combined lead upto 15 metres with percentage of grave lor Kankar ( e ) Extra forwet earth work containing gravel above sub soil water level. | 27.6 | Cum | 75 ₹2,070 Lowest | 180 ₹4,968 | 88.49 ₹2,442.32 | 180 ₹4,968 |
| 6.00 | Carriage of materials: Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone boulders, Kankar and building rubbish, Earth. Lead 2 KM | 59.71 | Cum | 100 ₹5,971 Lowest | 350 ₹20,898.5 | 134.19 ₹8,012.48 | 110 ₹6,568.1 |
| 7.00 | LOADING AND UNLOADING by manual means Stone (building or pitching) Sand, Earth, Fly Ash, Bajri, Shingle, Spalls, Brick bats, Brick ballast and Stone metal. | 59.71 | Cum | 50 ₹2,985.5 Lowest | 59 ₹3,522.89 | 52.31 ₹3,123.43 | 130 ₹7,762.3 |
| 8.00 | Supply of filter sand fine of size 20 to 30 mesh and water worn, hard/durable of specific gravity not less than 2.5, having uniformity coefficient less than 1.5 and as per latest IS 8419 (part-I) 1997/ amended there of, Including carriage upto site (Rate as per AOR-1) | 32.11 | Cum | 9,999 ₹3,21,067.89 Lowest | 10,500 ₹3,37,155 | 10,332.08 ₹3,31,763.09 | 12,300 ₹3,94,953 |
| 9.00 | Supply of filter gravel as per IS 8419 (part-I) 1997 of following size hard round stone of specific gravity not less than 2.5 free clay sand, loam and organic impurity of any kind. Gravel should not contain more than 2% by mass of flat or elongated pieces (in which the largest dimension exceed three times the smallest dimension) determined by hand picking. Gravel should be free from excessive amount of lime stone, acid solubility should not exceed 5% (6 mm to 3 mm) Including carriage upto site (Rate as per AOR-2) | 27.6 | Cum | 9,999 ₹2,75,972.4 Lowest | 10,500 ₹2,89,800 | 10,332.08 ₹2,85,165.41 | 12,000 ₹3,31,200 |
| 10.00 | UNLOADING by manual means Stone (building or pitching) Sand, Earth, Fly Ash, Bajri, Shingle, Spalls, Brick bats, Brick ballast and Stone metal. | 59.71 | Cum | 10 ₹597.1 Lowest | 18 ₹1,074.78 | 19.27 ₹1,150.61 | 170 ₹10,150.7 |
Tender Value
₹9.9 L
EMD Value
₹19,840
Closing Date
17 Sept 2025, 2:00 pmClosed
RE/DPH Division BBMB (PW) Slapper
RE/DPH Division BBMB (PW) Slapper
Replacement of filter media with new fine filter and supporting gravel for drinking water supply at WTP BBMB Slapper.
2025_BBMB_247249_1
340/REDPH/BBMB
Open Tender
Civil Works
Item Rate
90 days
BBMB Colony, Slapper
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,840
Yes
4 Dec 2025
2 Sept 2025
18 Sept 2025
2 Sept 2025
17 Sept 2025
2 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
NITdocumentfilter.pdf
Tender Documents • 1.26 MB
BOQ_283094.xls
BOQ • 0.23 MB
technicalspecificationsfilter.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .