Loading…
Loading…
Tender Value
₹3.1 L
EMD Value
₹3,500
Closing Date
3 Sept 2026, 4:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, CAPITAL PROJECT ELECTRICAL SUB DN NO 23, GANDHINAGAR
All in comprehensive Maintanance of R.O , Water cooler & A.C. Machines at various Govt. Non Residential Building Sector - 1 To 8 & 15 To 17 under C.P. Electrical sub Dn-23 , Gandhinagar ( For Period Of One Year )
338829
08/04 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Gandhinagar
9 documents required · 9 mandatory
₹600
Dy. Executive Engineer, Capital Project Electrical Sub Division No 23, Gandhinagar.
₹3,500
25 Aug 2026
25 Aug 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
All in comprehensive Maintanance of R.O , Water cooler & A.C. Machines at various Govt. Non Residential Building
Sector - 1 To 8 & 15 To 17 under C.P. Electrical sub Dn-23 , Gandhinagar ( For Period Of One Year )
Fund Head : 4059 Fix Charges Essential Service
Sr. No. Item No. Particulars. Qty. Rate Amount
Signature of Contractor Deputy.Executive.Engineer Executive Engineer
C.P.Electrical. R & B Sub Dn 23 C.P Electrical R & B Division
Gandhinagar Gandhinagar.
All in comprehensive Maintanance of R.O , Water cooler & A.C. Machines at various Govt. Non Residential Building
Sector - 1 To 8 & 15 To 17 under C.P. Electrical sub Dn-23 , Gandhinagar ( For Period Of One Year )
Estimated Quantity Item Description Unit Amount in Rs.
No. in Figure In Word
(All inclusive comprehensive maintenance cost of Water
coolers covers the yearly maintenance & preventive
maintenance with all required painting materials & labours.
including sheet metal work, refrigerant gas , compressor & all
the contains parts. The cost covers entire installation from
outlet of main switch to the Unit.
All inclusive comprehensive maintenance cost for the period of one
year for the water Cooler of following Capacity
A 4 Ea. (A) 80 Ltr capacity 2,654.28 Hundred Fifty Four Ea.
B 41 Ea. (B) 120 / 150 Ltr capacity 3,339.06 Hundred Thirty Nine Ea.
& Paise Six only
All inclusive comprehensive maintenance cost of Window type /
Split type Air conditioners & Water coolers covers the yearly
maintenance & preventive maintenance with all required painting
materials & labours. including sheet metal work, refrigerant gas
compressor & all the contains parts. The cost covers entire
installation from outlet of main switch to the Unit.
All inclusive comprehensive maintenance cost for the period of one
year for the Split type Air-conditioning Unit of following Capacity
(B) 1.5 ton capacity
(1) Charges for breakdown Maintenance as per requirement Rupees One
throughout the year Thousand Two
A 14 Ea. 1,233.21 Hundred Thirty Ea.
Twenty One only
(2) Charges for 1st Routine Maintenance of Dry Services Rupees One
between date of commencement to 3rd Months from date of Hundred Forty Four
B 14 Ea. issue of work order. 144.43 & Paise Forty Three Ea.
(3) Charges for 2nd Routine Maintenance of wet Services Rupees Two
with water or Chemical as per site requirement Services Hundred Sixty
C 14 Ea. between 3rd months to 6th Months from date of issue of 267.65 Ea.
Seven & Paise Sixty
work order. Five only
(4) Charges for 3rd Routine Maintenance of Dry Services Rupees One
between 6th months to 9th Months from date of issue of Hundred Forty Four
D 14 Ea. work order. 144.43 Ea.
& Paise Forty Three
(5) Charges for 4th Routine Maintenance of wet Services with Rupees Two
water or Chemical as per site requirement Services between Hundred Sixty
E 14 Ea. 9th months to 12th Months from date of issue of work order. 267.65 Ea.
Seven & Paise Sixty
(C) 2.0 ton capacity
(1) Charges for breakdown Maintenance as per requirement Thousand Four
throughout the year Hundred Sixty Four
& Paise Fifty only
(2) Charges for 1st Routine Maintenance of Dry Services
Hundred Seventy
B 23 Ea. between date of commencement to 3rd Months from date of 171.70 Ea.
issue of work order.
(3) Charges for 2nd Routine Maintenance of wet Services Rupees Three
with water or Chemical as per site requirement Services Hundred Seventeen
between 3rd months to 6th Months from date of issue of & Paise Fourteen
work order. only
(4) Charges for 3rd Routine Maintenance of Dry Services Rupees One
Hundred Seventy
D 23 Ea. between 6th months to 9th Months from date of issue of 171.70 Ea.
(5) Charges for 4th Routine Maintenance of wet Services with Rupees Three
Hundred Seventeen
E 23 Ea. water or Chemical as per site requirement Services between 317.14 Ea.
& Paise Fourteen
9th months to 12th Months from date of issue of work order.
Shifting of Split A.C. The Scope includes dismantling, shifting,
re-installing & re-commissioning of the units including topping
3 4 Ea. up of Refrigerant gas, minor civil work wiring existing piping M 1,969.50 Ea.
Hundred Sixty Nine
S Stand electrical cabling with PVC drown piping for 1.00,
& Paise Fifty only
& 2.0 TR capacity.
Supplying and erecting insulated pair of soft copper tubing Rupees One
open or concealed including power and control
4 16 rmt 1,158.47 Hundred Fifty Eight rmt
cable,necessary PVC drain pipes for Split AC machine up to
& Paise Forty Seven
TR capacity only
All inclusive comprehensive maintenance cost for the period of
one year for the Reverse Osmosis water purification system
up to 50 Ltr/ Hr capacity.Inclusive replacing and cleaning of
5 membranes , change of filter , uPVC pipe fitting and booster
pump replacing one time in twelve month and servicing of RO
System of following capacity( 6 Services in Twelve months )
A 4 Ea. (B) 25 Ltr Capacity 7,576.01 Ea.
Hundred Seventy
Six & Paise One only
B 2 Ea. (C) 50 Ltr Capacity 11,111.01 Ea.
Hundred Eleven &
RUPEES IN WORDS : Rupees Three lacs Eleven Thousand Four Hundred Thirty one Paise Forty Eight only.
I/We am/are willing to carry out the work at(No above rates allowed) ____________% below ___________________________________
__________________percent (Should be written in figures and words) below the tendered rates mentioned above.
Amount of my/our tender works out as under :
Put to Tender Rs. 311,431.48 Put to Tender Rs.
(Please strike out whichever is not applicable)
1 I/We hereby declare that I/We have visited the site, fully exquisite myself/ourselves with the local situation regarding materials and other factors pertaining
to the work before submitting this tender.
2 I/we hereby declare that I/We carefully studied the conditions of specifications and other tender documents of this work and agree to execute the same
3 A tender with any overwriting in percentage (should both in word and figures) rejected out right.
4 Insertions and/or corrections in the percentage quoted ( both in word and figures) resulting into increase in the value of the work shall be rejected outright
unless it is authenticated by the office opening the tender at the time of opening of tender.
5 Dismentaling the existing material taken by contractor as mention rates.
Signature of Contractor Deputy.Executive.Engineer Executive Engineer
C.P.Electrical R & B Sub Dn 23 C.P Electrical R & B Division
Gandhinagar Gandhinagar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
CONDITION OF AMC.pdf
G S T LTR.pdf
GR.pdf
notice-8.pdf
SBD Document.pdf
SCHEDULE A AND B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .