Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹2.0 L (73.6%)Admitted-Finance | ₹4.7 L+₹2.0 L (73.6%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹3.0 L (111.4%)Admitted-Finance | ₹5.7 L+₹3.0 L (111.4%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not elegible |
| 5 | Rejected-Technical DHARANDA BEKIDANGA ITAHAR U D | ITAHAR | UTTAR DINAJPUR | WEST BENGAL | - | - | Rejected-Technical Technically not elegible |
| Sl No | Description | Qty | Unit | M/S KUNDU ENTERPRISE L1 | MD MIJARUL HOQUE L3 | ANIRUDDHA BAG L2 |
|---|---|---|---|---|---|---|
| 0.00Name Of Work | ||||||
| 1.00 | 150mm Borring | 1 | Mtr | 1,710 ₹1,710 | 1,590 ₹1,590 | 1,310.4 ₹1,310.4 Lowest |
| 2.00 | 200mm Borring | 1 | Mtr | 2,932 ₹2,932 | 1,950 ₹1,950 | 1,600 ₹1,600 Lowest |
| 3.00 | 300 mm Borring | 1 | Mtr | 3,421 ₹3,421 | 2,825 ₹2,825 | 2,320 ₹2,320 Lowest |
| 4.00 | 150mm Pipe Fitting | 1 | Mtr | 745 ₹745 | 485 ₹485 | 400 ₹400 Lowest |
| 5.00 | 200mm Pipe Fitting | 1 | Mtr | 745 ₹745 | 485 ₹485 | 400 ₹400 Lowest |
| 6.00 | 250mm Pipe Fitting | 1 | Mtr | 745 ₹745 | 585 ₹585 | 480 ₹480 Lowest |
| 7.00 | 300mm Pipe Fitting | 1 | Mtr | 745 ₹745 | 680 ₹680 | 560 ₹560 Lowest |
| 8.00 | 150mm Compressor | 1 | Each | 11,900 ₹11,900 Lowest | 19,500 ₹19,500 | 16,000 ₹16,000 |
| 9.00 | 200mm Compressor | 1 | Each | 12,650 ₹12,650 Lowest | 19,500 ₹19,500 | 16,000 ₹16,000 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
29 Aug 2026, 5:00 pmClosed
Chairman Egra Municipality
Egra, Purba Medinipur, PIN-721429
Maintenance With Repairing Of Old Pipe Line, Tubewell (Zone-II) (As per Annexure) for Two year period , at Egra Municipality.
2026_MAD_1036874_1
NIEQ No.-19/LabourZone-II/25-26(2nd Call)
Open Tender
Support/Maintenance Service
Item Rate
7 days
Egra Municipality
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,000
Yes
24 Sept 2026
10 Aug 2026
31 Aug 2026
10 Aug 2026
29 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Name Of Work | - | - | - | - |
| 1 | 150mm Borring | 1 | Mtr | - | - |
| 2 | 200mm Borring | 1 | Mtr | - | - |
| 3 | 300 mm Borring | 1 | Mtr | - | - |
| 4 | 150mm Pipe Fitting | 1 | Mtr | - | - |
| 5 | 200mm Pipe Fitting | 1 | Mtr | - | - |
| 6 | 250mm Pipe Fitting | 1 | Mtr | - | - |
| 7 | 300mm Pipe Fitting | 1 | Mtr | - | - |
| 8 | 150mm Compressor | 1 | Each | - | - |
| 9 | 200mm Compressor | 1 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_2546971.xls
BOQ • 0.35 MB
2908.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .