Loading…
Loading…
Tender Value
₹24.5 L
EMD Value
₹49,000
Closing Date
13 Jul 2026, 4:00 pm3d left
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Development of Parking at Tangmarg.
2026_PWDJK_314352_1
NIT No. 24/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
60 days
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer RnB Division Tangmarg
₹49,000
2 Jul 2026
2 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. | 3,567 | Sqm | 91.75 | ₹3,27,272.25 |
| 2 | Providing laying watering and compacting with (80-100) K.N road roller GSB having aggregate size not exceeding 90mm granular sub base material to specified lines, grades cross sections all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete. Finished work to be measured and paid | 1,070.1 | Cum | 1,200 | ₹12,84,120 |
| 3 | Providing and Laying Graded Stone Aggregates of 63 mm-45 mm size range in stretches including stacking, spreading, carriage and compacting to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material / Stone Dust (Wuyan) to fill up interstices of coarse aggregate, watering and compacting to the required density. Complete job | 267.53 | Cum | 2,400 | ₹6,42,072 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete job etc. | 20.88 | Cum | 6,591.25 | ₹1,37,625.3 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: in foundation,bases of column ,footings. | 17.4 | Sqm | 286.35 | ₹4,982.49 |
| 6 | Carriage of materials by MT from source to site of work complete job. | - | - | - | - |
| 7 | Sand avg lead 30km | 9.4 | Cum | 520.34 | ₹4,891.2 |
| 8 | Aggregates avg lead 10kms | 18.58 | Cum | 279.04 | ₹5,184.56 |
| 9 | Providing / laying RCC pipes in proper position including trench excavation to required width and depth incl. providing required cushion complete job in all respects incl. all carriages / leads & lifts, incidental and consequential costs complete (work to be executed as per relevant IS codes and as directed at site) 600 mm dia | 7.29 | RM | 6,000 | ₹43,740 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1017844.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid