Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹8.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance AT PO PAHANDI DIST BARGARH | PAHANDI | BARGARH | ODISHA | -0.10% | ₹8.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance AT ITMA KUSTUNA DIST SUNDARGARH | KUSTUNA | SUNDARGARH | ODISHA | -0.10% | ₹8.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance AT PO EKMA DIST SUNDARGARH ODISHA | SUNDARGARH | SUNDARGARH | ODISHA | -0.10% | ₹8.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹8.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.9 L
EMD Value
₹8,908
Closing Date
20 Jul 2026, 6:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, SUNDARGARH
Construction of Public Toilet at Bargaon Tahasil Office_BUILDING
2026_CERWI_135560_1
Online-SESNG-05 of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Sundargarh
2 documents required · 2 mandatory
₹4,000
₹8,908
Yes
3 Sept 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
13 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation of foundation in hard soil including moorum,stoney earth with boulder with all lead and intial lift including levelling the bed etc.complete as per specification and direction of the Engineer-in-charge. | 31.15 | cum | 282.89 | ₹8,813.16 |
| 2 | Supplying,filling in foundation and plinth with sand in layers well watered and rammed inc. cost,conveyance, royalty of all the materials ...etc complete. | 13.25 | cum | 933.81 | ₹12,372 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and plinth using 4cm size clean hard black granite crusher broken metal of approved quality from approved quarry incl.hoisting..etc complete. | 18.91 | cum | 7,170.99 | ₹1,35,574.77 |
| 4 | Brickwork in F&P Structure using Fly Ash Brick having crushing strength not less than 75kg /cm2 in cement mortar (1:6) immersing the bricks for minimum 6 hours in water before...etc | 10.25 | cum | 5,757.9 | ₹59,035.75 |
| 5 | Cement concrete of proportion (1:2:4 using 12mm size hard black granite chips of approved quarry incl.hoisting , lowering and laying concrete & compacting in layers ..etc complete. | 1.08 | cum | 7,717.98 | ₹8,312.27 |
| 6 | RCC Work of M-25 grade with 20mm downgraded size hard granite chips including of approved quality and from approved quarry including hoisting,lowering laying & compacting conrete watering...etc column base and footing. | 5.58 | cum | 6,572.15 | ₹36,666 |
| 7 | RCC Work of M-25 grade with 20mm downgraded size hard granite chips including of approved quality and from approved quarry including hoisting,lowering laying & compacting conrete watering...etc Plinth. | 2.63 | cum | 7,446.45 | ₹19,613.95 |
| 8 | RCC Work of M-25 grade with 20mm downgraded size hard granite chips including of approved quality and from approved quarry including hoisting,lowering laying & compacting conrete watering...etc Wall beam. | 1.11 | cum | 18,468.6 | ₹20,500.15 |
| 9 | RCC Work of M-25 grade with 20mm downgraded size hard granite chips including of approved quality and from approved quarry including hoisting,lowering laying & compacting conrete watering...etc Column and Beam. | 0.65 | cum | 18,468.6 | ₹11,986.12 |
| 10 | RCC Work of M-25 grade with 20mm downgraded size hard granite chips including of approved quality and from approved quarry including hoisting,lowering laying & compacting conrete watering...etc Chajja. | 5.65 | sqm | 1,262.5 | ₹7,135.65 |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 7.00 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_601187.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .