Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23,010Accepted-AOC ENA ISLAMPUR BHAGATDIH DHANBAD DHANBAD JHARKHAND 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | 1 | Accepted-AOC L1 | |
| 2 | 2₹19,900+₹400 (2.05%)Rejected-Finance ENA ISLAMPUR BHAGATDIH DHANBAD DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | 2 | Rejected-Finance L2 | |
| 3 | 3₹22,100+₹2,600 (13.3%)Rejected-Finance ENA ISLAMPUR PO BHAGATDIH DHANBAD JHARKHAND 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | 3 | Rejected-Finance L3 |
Tender Value
Refer Docs
Closing Date
17 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Manager Excavation
Office of The General Manager Bastacolla Area Office Excavation Department BCCL Dhanbad
Repairing of worn-out/failed splines of pinion shaft and pulley of crowd system of EKG Shovel SL.No.HMB543/S383 of Kuya OCP, Bastacolla Area IX.
2023_BCCL_267261_1
BCCL/BA-IX/AM (Excvn)/E-Tender/22-23/180
Open Tender
Excavation Department Work
Item Rate
5 days
Kuya OCP, Bastacolla Area IX.
As Per NIT
3 documents required · 3 mandatory
Yes
25 May 2023
11 Jan 2023
18 Jan 2023
11 Jan 2023
17 Jan 2023
11 Jan 2023
11 Jan 2023 - 14 Jan 2023
Amount
Repairing of worn-out/failed splines of pinion shaft and pulley of crowd system of EKG Shovel SL.No.HMB543/S383 of Kuya OCP, Bastacolla Area IX
Repairing of worn-out/failed splines of pinion shaft and pulley of crowd system of EKG Shovel SL.No.HMB543/S383 of Kuya OCP, Bastacolla Area IX 1. Worn-out /failed splines of pulley of crowd system to be machined by lathe machine 2. After machining the metal to be filled by machinable electrode in bore of pulley for new splines cutting 3. After metal filling of bore of pulley to be machined on lathe machine as per required size 4. After machining new splines of pulley to be cut on shaper machine as per OEM dimension size. 5. Worn-out splines of pinion shaft of crowd system to be metal filled by machinable steel electrode 6. After metal filling the new splines of pinion shaft to be maked by grinding as per OEM dimension size. Note:- Materials required for the job as per scope of work will be provided by the bidder.
Total impact of GST for the purpose of CTC
JANTA AUTO TRADERS
M/S NATIONAL AUTO TRADERS
stage.html
html • 0.04 MB
techsummary_276497.pdf
PDF • 0.44 MB
finsummary_276497.pdf
PDF • 0.44 MB
AOC.pdf
PDF • 0.36 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .