Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.8 LAccepted-AOC | ₹54.8 L | L1 | Accepted-AOC Stood L1 |
| 2 | L2₹58.6 L+₹3.8 L (6.94%)Rejected-Finance C O LT BHUBESH CH DAS VILL NORTH PADMABIL P S PANISAGAR NORTH TRIPURA | ₹58.6 L+₹3.8 L (6.94%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹59.5 L+₹4.6 L (8.43%)Rejected-Finance PANISAGAR NORTH TRIPURA OPPOSITE TO SDPO OFFICE | PANISAGAR | NORTH TRIPURA | TRIPURA | ₹59.5 L+₹4.6 L (8.43%) | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹61.1 L+₹6.3 L (11.5%)Rejected-Finance | ₹61.1 L+₹6.3 L (11.5%) | L4 | Rejected-Finance Higher than L1 |
| 5 | L5₹64.0 L+₹9.2 L (16.7%)Rejected-Finance | ₹64.0 L+₹9.2 L (16.7%) | L5 | Rejected-Finance Higher than L1 |
Tender Value
₹71.3 L
EMD Value
₹1.4 L
Closing Date
28 May 2026, 3:00 pmClosed
The Executive Engineer, DWS Division Dharmanagar
Office of the Executive Engineer, DWS Division Dharmanagar, North Tripura PIN _799250
RWS/Other deposit works/JJM Schemes in North Tripura District 2026-27/ SH- Const. of 2 nos. Pump house, laying of distribution pipe line in/c all allied Civil, Mechanical and Electrical works of DWS Sub-Division, Dharmanagar/Gr.-II
2026_CEDWS_73069_1
03/EE/DWS/DMN/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Dharmanagar
Please Refer Bid Document
6 documents required · 6 mandatory
₹4,000
₹1.4 L
28 Jul 2026
19 May 2026
28 May 2026
19 May 2026
28 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH: Pump House
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | 10 | Cum | 179.9 | ₹1,799 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 62.64 | Cum | 231.6 | ₹14,507.42 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 20.88 | cum | 161.3 | ₹3,367.94 |
| 4 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 4 | Cum | 1,177.3 | ₹4,709.2 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: | |||||
| 5.01 | i)1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 3.54 | cum | 11,355.7 | ₹40,199.18 |
| 5.02 | ii)1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 8.06 | cum | 9,960.7 | ₹80,283.24 |
| 6 | First class brick work in foundation and plinth including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 12.2 | cum | 9,845.2 | ₹1,20,111.44 |
| 7 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:
i) In cement mortar 1:4 (1 cement : 4 fine sand ). | 3.2 | cum | 11,410.19 | ₹36,512.61 |
| 8 | Half brick masonry work with first class bricks insuperstructure upto floor five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 200 | sqm | 1,533.5 | ₹3,06,700 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74360.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
DNIeT03EE.pdf
Tender Documents • 2.03 MB
BOQ_74360.xls
BOQ • 0.43 MB
datecorrigendumPNIeT01.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .