| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹3.0 LRejected-AOC NOT SPECIFIED | ₹3.0 L | L2 | Rejected-AOC HIGHER RATE |
| Sl No | Description | Qty | Unit | ABDU RAHMAN WORK CONTRACTS L2 | Dominic Dominic L1 |
|---|---|---|---|---|---|
| 1.00road | |||||
| 1.00 | 3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 26.1 | cum | 15.04 ₹392.54 | 15.04 ₹392.54 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 17.4 | cum | 3,124.47 ₹54,365.78 | 3,124.47 ₹54,365.78 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 26.1 | cum | 8,926.16 ₹2.3 L | 8,730.16 ₹2.3 L |
| 1.00 | 3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 6.9 | cum | 609.9 ₹4,208.31 | 609.9 ₹4,208.31 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 8.1 | cum | 412 ₹3,337.20 | 412 ₹3,337.20 |
Tender Value
₹3.0 L
EMD Value
₹7,382
Closing Date
2 Feb 2026, 6:00 pmClosed
ARYA BABU P
ASSISTANT ENGINEER LIW EW SECTION NARIPPATTA GP
268/25-26 Arakkalappoyil polichadi road construction
2026_LSGD_829196_6
1/AE/LSGD/NPT/2026
Open Tender
Civil Works - Roads
360 days
NARIPPATTA GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,382
Yes
7 Apr 2026
23 Jan 2026
4 Feb 2026
23 Jan 2026
2 Feb 2026
23 Jan 2026
23 Jan 2026 - 2 Feb 2026
3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_1392531.pdf
finsummary_1392531.pdf
aoc.pdf
finance_1392531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1392531.xls
BOQ • 0.30 MB
SBDARAKKALAPOYIL.pdf
Tender Documents • 1.01 MB
FOTARAKKALA.pdf
Tender Documents • 0.25 MB
PAARAKKALA.pdf
Tender Documents • 0.26 MB
AFFIDARAKKALA.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid