Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.5 LAccepted-AOC HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176093 | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹8.6 L+₹2,548.32 (0.30%)Rejected-AOC VPO BHANGROTOO BLAH DISTT MANDI H P | L-2 | Rejected-AOC Being L-2 |
Tender Value
₹8.2 L
EMD Value
₹16,500
Closing Date
3 Jul 2026, 10:00 amClosed
Executive Engineer HPPWD Division Nerchowk
Executive Engineer HPPWD Division Nerchowk
C/o RCC Box Cell culvert at RD 186/660 to 186/670.
2026_PWD_137556_5
PW-NCD-E-Tender/ Publication/ 2025- 2050-57 dt. 23.062026
Open Tender
Civil Works
Percentage
90 days
Nerchowk
As per bid document
12 documents required · 12 mandatory
₹350
₹16,500
29 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. | 136.8 | Per cubic metre | 287 | ₹39,261.6 |
| 2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. | 46.8 | Per cubic metre | 7,288 | ₹3,41,078.4 |
| 3 | Providing mild steel/ Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level: Tor steel including carriage of materials within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. | 5,148 | Per Kg | 85.8 | ₹4,41,698.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
SBD.pdf
Tender Documents • 6.54 MB
BOQ_203623.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .