| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 LAccepted-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L-1 | Accepted-Finance Lowest-1 | |
| 2 | L-2₹1.8 L+₹31.23 (0.02%)Rejected-Finance | L-2 | Rejected-Finance Lowest-2 | |
| 3 | L-3₹2.3 L+₹51,023.75 (29.1%)Rejected-Finance | L-3 | Rejected-Finance Lowest-3 |
| Sl No | Description | Qty | Unit | tej ram construction company L2 | LALIT KUMAR L1 | DALEEP KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge. | 1.69 | Cum | 500 ₹845 | 435 ₹735.15 | 420 ₹709.8 Lowest |
| 3.00 | Providing & laying cement concrete 1:4:8 (1 cement :4 sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.34 | Cum | 7,000 ₹2,380 Lowest | 8,000 ₹2,720 | 8,500 ₹2,890 |
| 4.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm, so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in:- | ||||||
| 4.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttresses, plinth and string courses and the like in all leads and lifts as per the direction of Engineer-in-Charge. | 5.4 | Sqm | 300 ₹1,620 Lowest | 400 ₹2,160 | 340 ₹1,836 |
| 5.00Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in: | ||||||
| 5.01 | In foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 0.61 | Cum | 9,000 ₹5,490 | 8,000 ₹4,880 Lowest | 9,300 ₹5,673 |
| 6.00 | Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 27.34 | Kg. | 87 ₹2,378.58 | 80 ₹2,187.2 Lowest | 95 ₹2,597.3 |
| 7.00Providing, laying, jointing, testing and carriage of HDPE pipes of various dia in trenches to required grades as per (IS: 4984-1995) PE-80, PN-4 Kg/Cm2 latest with upto date ammendments of following OD pipes, material grade and class of pipes including all fittings like end caps, collars & cut pieces etc. complete in all respect. The jointing of pipes should be done by way of butt fusion welding as per relevant IS Code and specifications complete job in all respect in all leads & lifts as per the directions and satisfaction of Engineer-in-Charge. | ||||||
| 7.01 | 225 mm dia, PE-80, PN-6 Kg/Cm2 | 125 | Rmt | 1,300 ₹1,62,500 Lowest | 1,300 ₹1,62,500 Lowest | 1,700 ₹2,12,500 |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
22 Dec 2025, 5:00 pmClosed
Executive Engineer
JSD Baggi
CO 4 Nos. Anchor Block and Providing, laying, jointing, testing and carriage of HDPE pipe 225 mm dia Grade PE-80 PN 6 Kg Cm2 for feeder pipe RD 0 to 125 125 Rmt from head weir to sump well of LIS Noun Pathan
2025_HPIPH_123223_1
22445-494 dated 11.12.2025
Open Tender
Civil Works
Item Rate
90 days
Baggi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,800
3 Mar 2026
11 Dec 2025
23 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
12 Dec 2025 - 22 Dec 2025
Excavation in foundation, trenches (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including blasting soft/hard rock or chiseling soft/hard rock where blasting is prohibited in all lifts including trimming & dressing of sides, levelling of beds to correct grade i/c shoring/ strutting, planking, timbering wherever required, stacking the useable or unuseable material/ soil separately & after excavated soil clear from the edge of excavation returning the excavated soil after laying jointing testing of pipes in trenches in 15 Cm layers including consolidating of each deposited layer by ramming, watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads & lifts including restoration of unmetalled surfaces to its original condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads & lifts as per the entire satisfaction & directions of Engineer-in-Charge.
Providing & laying cement concrete 1:4:8 (1 cement :4 sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm, so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in:-
Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttresses, plinth and string courses and the like in all leads and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:
In foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing, laying, jointing, testing and carriage of HDPE pipes of various dia in trenches to required grades as per (IS: 4984-1995) PE-80, PN-4 Kg/Cm2 latest with upto date ammendments of following OD pipes, material grade and class of pipes including all fittings like end caps, collars & cut pieces etc. complete in all respect. The jointing of pipes should be done by way of butt fusion welding as per relevant IS Code and specifications complete job in all respect in all leads & lifts as per the directions and satisfaction of Engineer-in-Charge.
225 mm dia, PE-80, PN-6 Kg/Cm2
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM6.pdf
Tender Documents • 0.42 MB
TC.pdf
Tender Documents • 0.05 MB
BOQ_181017.xls
BOQ • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .