Superintending Engineer (CG), GIDC, Bharuch.
Request for Proposal (RFP) for appointment of Project Management Consultancy(PMC) (Concept to Commissioning) firm for 100 MLD Desalination Plant at Dahej-PCPIR, Bharuch, Gujarat along with Carry out detailed Marine investigation, study and detailed design and EC application preparation and submission with allied all works.
259043
E-Tender Notice No. 07 of 2025-26 Sr. No. 03
Open
Civil - All
Service
Bharuch
2 documents required · 2 mandatory
₹21,240
Executive Engineer, GIDC, Bharuch
₹1 L
29 Dec 2025
29 Dec 2025
29 Dec 2025
31 Jan 2026
29 Dec 2025
Item No. Item Description Qty Unit
1 (A) Pre - Tender Activities: - Pro rata basis (monthly Basis) or as determined by the Engineer-in-charge. Preparation of Request for Proposal (RFP) documents designing, Engineering, Estimation, DPR, Tender (as per scope of work), Participation in Pre-Bid meeting, Replies to Bidder’s queries, Bidder clarification, furnishing the revised specification / amendment if necessary in the tender, Assistance in techno-commercial evaluation of bids, Reviewing and Vetting of bid evaluation report, Finalization of Orders and contract document(s) and all specified work as per the detailed scope at relevant clauses in this tenders. (B) Post Tender Activities :- (monthly basis) Pro-rata basis as time period for first phase of 36 months or up to actual date of Completion of plant or as determined by the Engineer – in -charge. Charges for Assistance in Review of Engineering documents of Contractor for approval, scrutinizing the Quality, Assurance Plan, Drawings and detailed Design reports to be supplied by the contractors, approval of equipment sizing and selection, selection of sub-vendors / for approval and other Post Bid Engineering work as specified in the Tenders etc. (I) Site supervision of construction, erection and commissioning, quality control at site, measurement and certification of contactors invoices, 36 months or up to actual date of completion of plant ( Monthly basis) or as determined by the Engineer-in-charge (II) Approval of Completion Report/work completion certificate including all test report. Note - The said Tender/RFP invited are exclusive of GST. So, interested bidders are requested to take note of the same and prices quoted are lump sum and inclusive of all taxes and duties except GST, 1.000 LS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
100 MLD RFP Consultancy Tender Documents.pdf
Corrigendum No. 01.pdf
Corrigendum No. 02.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .