Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical KANNUR | KERALA | 670001 | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | K Gopakumar L2 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L4 | KRISHNAN G L1 | V P Sanikumar L3 |
|---|---|---|---|---|---|---|---|
| 1.00Sewer Line and Manholes | |||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 207.76 | cum | 250.97 ₹52,140.77 | 301 ₹62,534.86 | 242 ₹50,277.19 Lowest | 264 ₹54,847.85 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.84 | cum | 7,728.05 ₹1,14,676.53 | 8,000 ₹1,18,712 | 7,460 ₹1,10,698.94 Lowest | 8,110 ₹1,20,344.29 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 71.55 | cum | 10,217.93 ₹7,31,082.67 | 9,650 ₹6,90,447.85 Lowest | 9,865 ₹7,05,830.89 | 10,722 ₹7,67,148.38 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,337.64 | kilogram | 109.52 ₹4,75,058.55 | 104 ₹4,51,114.77 Lowest | 106 ₹4,59,790.05 | 115 ₹4,98,828.83 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 666.54 | sqm | 376.19 ₹2,50,745.68 | 415 ₹2,76,614.1 | 364 ₹2,42,620.56 Lowest | 395 ₹2,63,283.3 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 166.75 | sqm | 936.42 ₹1,56,147.1 | 885 ₹1,47,572.87 Lowest | 904 ₹1,50,741.1 | 983 ₹1,63,914.27 |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 375.48 | sqm | 457.1 ₹1,71,633.28 | 440 ₹1,65,212.52 Lowest | 442 ₹1,65,963.49 | 480 ₹1,80,231.84 |
| 1.01 | 50.18.9.10.1:Providing and fixing PVC pipes includings jointing of pipes with one step pvc solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer in Charge. 150 mm dia 6 Kgf/cm2 | 528 | metre | 922.72 ₹4,87,196.16 | 1,165 ₹6,15,120 | 891 ₹4,70,448 Lowest | 969 ₹5,11,632 |
| 1.01 | 2.10.1.2:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m:
All kinds of soilPipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia | 480 | metre | 509.87 ₹2,44,737.6 | 482 ₹2,31,360 Lowest | 493 ₹2,36,640 | 536 ₹2,57,280 |
Tender Value
₹73.7 L
EMD Value
₹50,000
Closing Date
3 Oct 2025, 3:00 pmClosed
Executive Engineer
O/o,Executive Engineer, KLC, TVM
GENERAL-KLC-III- MLA Hostel Compound- Providing and laying new sewer lines and construction of new manholes for Nila Block and Periyar block inside the MLA Hostel compound-General Civil Work
2025_PWD_801459_1
PWD/BLDG/TR/4823/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
KLC, TVPM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
14 Nov 2025
24 Sept 2025
7 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1331109.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .