Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.6 L
EMD Value
₹4,000
Closing Date
28 Nov 2022, 12:00 pmClosed
SE ETC II MORADABAD
220 KV MAJHOLA COMPUS MORADABAD
WORK FOR LOADING CARRIAGE UNLOADING SHIFTING AND REPLACEMENT OF GASKET OF 40MVA T F FROM 132KV S S JALILPUR UNDER ETD BIJNOR TO 132KV S S HASANPUR UNDER ETD AMROHA.
2022_UPTCL_731740_1
E-T-55/ETC-II/M/2022
Open Tender
Electrical Works
30 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD AMROHA, SBI CURRENT ACCOUNT NO.30723557626
₹4,000
20 Dec 2022
26 Sept 2022
28 Nov 2022
26 Sept 2022
28 Nov 2022
26 Sept 2022
Amount
WORK FOR LOADING CARRIAGE & UNLOADING SHIFTING AND REPLACEMENT OF GASKET OF 40MVA T/F FROM 132KV S/S JALILPUR UNDER ETD BIJNOR TO 132KV S/S HASANPUR UNDER ETD AMROHA
Partially dismantling of 40 MVA T/F for carriage of main tank at 132 KV S/S Jalilpur(Crane shall be arranged by the contractor).
Shifting/Dragging of oil filled 40 MVATransformer from existing place to near loading place at 132 KV Sub-Station Jalilpur distance up to 20 Mtr.
Additional shifting 5 mtrs per job.
Loading of 40 MVA T/F main tank along with all accessories, making the wooden sleeper plate from jacking theT/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bad with the help of steel rope and turn buckle.
Packing of HV/LV/Neutral Bushing of 40 MVA 132/33 KV T/F in empty crates (Packing Material will be provided by the contractor at his own cost)
Carriage of 40 MVA T/F tank from 132 KV Sub-Station Jalilpur to 132 KV Sub-Station Hasanpur via Bijnor to Meerut to Gajraula to Hasanpur Sub-station along with all accessories by Pvt.Truck/Trailer.Distanceabout 203 Km.
Unloading of main tank of 40 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushing conservator tank, cooling fan,RTCC Panel etc. from Track/ Trailer at site at 132 KV S/S Hasanpur.
Shifting/dragging of40 MVA Transformer from unloading place to plinth upto 20 mtrs. distance including turning of Transformer if required including all T & P and other works to complete the job satisfactory.
Additional shifting 5 mtrs per job.
Replacement of gasket of radiator/Bushing/pipe line only open part. Except Top Cover of Transformer by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika/Turborze brand grade.
Gupta Elect and Engg Works
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid