Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.1 L+₹69,828.02 (4.27%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹17.4 L+₹1.0 L (6.39%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SANTHOSH KUMAR S L3 | SIJU MK L2 | Ajeesh s L1 |
|---|---|---|---|---|---|---|
| 1.00Anganwadi Building | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 29.39 | cum | 359.72 ₹10,570.73 | 352.53 ₹10,359.45 | 338.1 ₹9,935.41 Lowest |
| 1.00 | OD133668/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site. | 21.6 | cum | 3,993.46 ₹86,246.76 | 3,913.59 ₹84,521.8 | 3,753.45 ₹81,063.26 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 12.15 | cum | 8,343.49 ₹1,01,356.72 | 8,176.62 ₹99,329.58 | 7,842.05 ₹95,265.22 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 22.8 | sqm | 762.88 ₹17,390.61 | 747.62 ₹17,042.75 | 717.03 ₹16,345.42 Lowest |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 46.52 | sqm | 1,021.94 ₹47,540.65 | 1,001.5 ₹46,589.78 | 960.52 ₹44,683.39 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.98 | cum | 12,772.18 ₹1,14,706.95 | 12,516.74 ₹1,12,412.84 | 12,004.57 ₹1,07,813.04 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 23.12 | cum | 318.47 ₹7,363.98 | 312.1 ₹7,216.69 | 299.33 ₹6,921.41 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.73 | cum | 7,932.89 ₹69,230.33 | 7,774.23 ₹67,845.71 | 7,456.12 ₹65,069.56 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 10.63 | sqm | 1,008.55 ₹10,725.93 | 988.38 ₹10,511.42 | 947.94 ₹10,081.34 Lowest |
Tender Value
₹17.4 L
EMD Value
₹43,531
Closing Date
12 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE LSGD ELY GP
O/o The Assistant Engineer, LSGD Section, Elavanchery Grama Panchayath
Elavanchery GP 2026-27 Construction of Kottayankad Anganwadi Building in Ward 14-Pro.No-230/26-27
2026_LSGD_874375_1
T2/2026/AE/LIDEW/ELYGP
Open Tender
Civil Works - Buildings
Item Rate
360 days
ELAVANCHERY
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹43,531
Yes
18 Nov 2026
30 Sept 2026
12 Oct 2026
30 Sept 2026
12 Oct 2026
30 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Anganwadi Building | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 29.39 | cum | - | - |
| 1.002 | OD133668/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site. | 21.6 | cum | - | - |
| 1.003 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 12.15 | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 22.8 | sqm | - | - |
| 1.005 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 46.52 | sqm | - | - |
| 1.006 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.98 | cum | - | - |
| 1.007 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 23.12 | cum | - | - |
| 1.008 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.73 | cum | - | - |
| 1.009 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 10.64 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1483828.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
AFF.pdf
Tender Documents • 0.28 MB
EPAYMNT.pdf
Tender Documents • 0.28 MB
FEE.pdf
Tender Documents • 0.47 MB
FOT.pdf
Tender Documents • 0.34 MB
IPACT.pdf
Tender Documents • 0.23 MB
PAGMT.pdf
Tender Documents • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1483828.xls
BOQ • 0.33 MB
DATECORRIIGENDUM.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .