Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC PALAKKAD | KERALA | 678001 | ₹3.9 L | L1 | Accepted-AOC L1 quoted, hence accepted |
| 2 | L2₹4.0 L+₹14,406.69 (3.72%)Rejected-AOC | ₹4.0 L+₹14,406.69 (3.72%) | L2 | Rejected-AOC L2 quoted, hence rejected |
| 3 | L3₹4.1 L+₹23,304.94 (6.02%)Rejected-AOC | ₹4.1 L+₹23,304.94 (6.02%) | L3 | Rejected-AOC L3 quoted, hence rejected |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
26 Jun 2026, 3:00 pmClosed
Assistant Executive Engineer, PWD Roads subdiv
O/o Assistant Executive Engineer, PWD Roads subdivision, Mannarkkad
GENERAL-Premonsoon works 2026-27-to various roads under Mannarkad roads section
2026_PWD_856969_1
D1/9524/2026
Open Tender
Civil Works - Roads
Percentage
120 days
Mannarkkad
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,593
Yes
17 Jul 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Premosoon work | |||||
| 1.001 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. | - | cum | 50.16 | - |
| 1.002 | OD53190/2026-2027:Engaging Man Mazdoor for clearing the site and removing debris | - | Day | 1,127.36 | - |
| 1.003 | OD53184/2026-2027::Skilled Mazdoor (scavanger,wood cutter) clearing blockage of culverts, and drain and
cutting branches of trees and vegetation | - | Day | 1,247.96 | - |
| 1.004 | OD53188/2026-2027:Hiring Chain saw with mortor for cutting trees and branches | - | Day | 726 | - |
| 1.005 | OD53187/2026-2027::Engaging Hydraulic Excavator (3D) with driver and fuel for cutting ,clearing drains other
miscellaneous activities etc, complete | - | Day | 12,234.92 | - |
| 1.006 | OD53186/2026-2027:Hiring Tipper for transporting cut earth , cut trees and branches to auction yard | - | Day | 6,554.42 | - |
| 1.007 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | - | sqm | 30.73 | - |
| 1.008 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | - | Hectare | 1,77,033.42 | - |
| 1.009 | OD53191/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including cost of all charges | - | each | 774.94 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1448540.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1448540.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.63 MB
integrity.pdf
Additional Documents • 0.05 MB
PreAgmntFormat.pdf
Other Document • 0.30 MB
epayform.pdf
Additional Documents • 0.06 MB
formoftender.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .