| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L5₹38.7 L+₹2.4 L (6.75%)Accepted-AOC 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L5 | Accepted-AOC being lowest | |
| 2 | L1₹36.3 LRejected-Finance G 86 DATA RAM SECTOR 18 ROHINI NEW DELHI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | L1 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 3 | L2₹37.6 L+₹1.4 L (3.78%)Rejected-Finance N A | NA | NA | 121004 | L2 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 4 | L3₹37.6 L+₹1.4 L (3.79%)Rejected-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | L3 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 5 | L4₹37.6 L+₹1.4 L (3.79%)Rejected-Finance | L4 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents |
Tender Value
₹41.5 L
EMD Value
₹83,000
Closing Date
1 Feb 2020, 6:00 pmClosed
GE (N) DELHI CANTT-10
GE (N) DELHI CANTT-10
MANNING AND OPERATION OF PUMP HOUSES POWER HOUSES AC PLANTS PASSANGER LIFTS AT SQAE OF DGQA ANAND PARBAT KINGSWAY CAMP TIMARPUR HIRANKUDNA AREA UNDER GE NORTH DELHI CANTT
2020_MES_314227_1
GE/NORTH-23/2019-20
Open Tender
Manpower Supply
Item Rate
333 days
GE (N) DELHI CANTT-10
as per NIT
9 documents required · 9 mandatory
₹500
GE (N) DELHI CANTT-10
₹83,000
Yes
14 Feb 2020
13 Jan 2020
3 Feb 2020
13 Jan 2020
1 Feb 2020
25 Jan 2020
Amount
M&O for operation of transformers, LT distribution panel board and HT circuit breakers and at MES power house of DGQA offrs Md accn and offrs mess at Anand Parbat by employing ONE Electrician (SK) in each shift of 8 hours for three shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs, 'C' shift 2200 Hrs to 0600 Hrs) daily including Sunday and Holiday complete all as specified and directed by the installation mainly comprising the following :- (Total 03 Electricians) (a) Transformer 500 KVA -01 No Indoor type. (b) Transformer 200 KVA- 01No Outdoor type (c) HT OCB incoming -01 No (d) DG set 125 KVA Capacity – 01 No (e) Connecting LT&HT cable LT/HT panels and other accessories inside at DGQA Offrs complex and Offrs mess area.(f) GOD with four pole structure -01 No.
Note of item No 01 In case of any break down, shut down or tripping of VCBs, Operator will immediately inform to JE/ Engineer-in-Charge w/o delay and sufficient staff should also be arranged by contractor for un-interrupted supply and nothing extra shall be paid on this account, same ame shall be included in quoted rates (ii) Daily maintenance of Power House / Cleaning of all transformer room, VCB room and connected area shall be got cleaned by the contractor included in the above item rate. (iii) Normal maintenance of DG Sets like cleaning and checking of all accessories Battery and routine test as required. (iv) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc., to existing buildings,E&M equipments, Machineries,Cables and connected accessories complete. (v) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vi) The operator shall be deployed qualified ITI technician of proper experience . (vii) For payment of minimum wages to the workers provisions shall be strictly followed by the contractor (viii) Log book records for each installation shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
M&O for operation of water supply and fire fighting installation at Anand Parbat including Sunday and holiday by employing ONE pump operator in each shift of 8 hours duration for two shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs) daily including Sunday and Holiday complete all as specified and directed by the installation mainly comprising with following :- (Total FGM-02 Nos) (a) Pump set 20 HP-02 Nos (b) Centrifugal pump 75 HP-02 Nos (c) Centrifugal pump 25 HP-01 No (d) UG sump 50000 Glns-01 No (e) B block de watering pumps 02 HP - 02 Nos ( f) Bore well -2Nos (12.5HP) (g) Control LT panels Note :- (i) Operation of pump installation of any capacity and run the pump time to time as on required basis. (ii) Operating chlorination system as per requirment in order to get 1.00 PPM at pump house and 0.2 PPM at users end (iii) Operation of sluice valves at overhead reservoir to supply water to the users time to time twice in a day. (iv) Normal maint of Pumping sets and tightening nut bolt washer etc and cleaning all pump house room and connected area included in the rate of items. v) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc to existing buildings, E&M equipments & connected accessories complete.(v) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vi)The operator shall be deployed Skilled ITI technician and qualified tradesman of proper experience . (vii) For payment of minimum wages to the workers provisions of particulars specifications shall be strictly adhered to (viii) Log book for records shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
Manning and Operation of water supply main pumping installation and new MAP Water Supply installation at Hirankudna all days including Sunday and holiday by deploying one operator in each shift of 08 hours duration for two shift 06 : 00 AM to 02 : 00 PM and 02 : 00 PM to 10 : 00 PM to provide un-interupted water supply to the users as specified and directed by Engr-in-charge. (Total FGM - 02 Nos) The installation to be manned comprising the followings:- (i) Pump set 7.5 HP - 02 Nos. (ii) UG sump - 01 No. (iii) LT Panel for Pump house- 01 No. (iv) RO plant 1000 LPH including pumps and other accessories – 01 No (v) Pump set 5 HP- 01 No (vi) Pump set 7.5 HP -02 Nos for Map Accn (Vi) UG Sump for Map Accn (vii) LT panel 01 No for Map Accn Pumps (viii) RO Plant 700 LPH including pumps and accessories -01 No for Map accn (ix) DG set 63 KVA -01 No
M & O of Water Supply Pumping Installation at Kingsway Camp, Timarpur all days including Sunday and holiday by deploying tradesmen having adequate experience to handle E/M machinery of any type by deploying one operator in each shift of 08 hours duration for two shift 06 : 00 AM to 02 : 00 PM and 02 : 00 PM to 10 : 00 PM daily to provide un-interupted water supply to the users as specified and directed by Engr-in-charge.consisting of the following :- (Total FGM-02 No) The installation to be manned comprising the followings. (i) Centrifugal pump set 10 HP -02 No ( at MES Pump House) (ii) Centrifugal pump set 5 HP -01 Nos (at MES Pump House (iii) Gen Set - 01 Nos (Map Accn at Albat ekka colony) (iv) Motor pump set - 02 Nos (Map Accn at Albat ekka colony) (v) LT Panel - 01 No ((MAP Accn at Albert ekka colony)
Note for Srl item No 3 to 5 (i) Operation of pump installation of any capacity and run the pump time to time as on required basis. (ii) Operating chlorination system as per requirment in order to get 1.00 PPM at pump house and 0.2 PPM at users end (iii) Operation of sluice valves at overhead reservoir to supply water to the users time to time twice in a day. (iv) Normal maint of Pumping sets and tightening nut bolt washer etc and cleaning all pump house room and connected area included in the rate of items. ( v) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc to existing buildings, E&M equipments & connected accessories complete. (vi) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vii)The operator shall be deployed Skilled ITI technician and qualified tradesman with proper experience . (viii) For payment of minimum wages to the workers shall be strictly adhered to (ix) Log book for records shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
M&O for operation of electrically powered lift serving ground floor to sixth floor 8 passenger (544) Kg capacity Power driven (VVUF) automatic steel sliding door traveling speed 0.70 MPS etc complete with accessories of Make M/s Thyssnkurpp Elevators PVT LTD including cleaning of lift car machine room all as directed employing ONE lift operator for 04 Nos lifts of A&B block in each shift of 8 hours duration for three shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs, 'C' shift 2200 Hrs to 0600 Hrs) daily including Sunday and Holiday complete all as specified and directed. (Total 03 lift Attendant) Note :- (i) Cleaning of lift cabin & lift car room complete and checking of lift panel etc rate shall be carried out by the contractor (ii) Lift opertor must have mobile hand set and the contact No of contractor & Opertor shall be deploye inside cabin room.
M&O for operation of central Air conditioning plant 7.5 ton capacity installed in SQAE lab of DGQA Anand Parbat round the clock operation in all day employing one refrigerator Mech (SK) in one shift of 8 hours duration (01 shift for 0900 Hrs to 1700 Hrs) for excluding Sunday and Holiday and the installation mainly comprise the following:- (Total 01 Nos Ref/Mech) (a) Compressor 7.5 ton Capacity – 02 Nos (b) Chiller/Condenser pump set – 02 Nos (c) Cooling tower-01Nos (d) AHU with blower and accessories-01Nos (e) LT panel connecting cable and accessories .(f)Connecting pipe with accessories (g) DG set 125 KVA Capacity. -01 Nos Note :- (i) Cleaning of AC plant and connected accessories including AHU,LT panel DG set and all Eqpt Room their in side and out side surrender area to be included in the item rate.
Note: Ser item No 01 to 07:- (i) The contractor shall be responsible to make good at his own expense, of the damage if any caused by his workmen etc., to existing buildings,E&M equipments, Machineries,Cables and connected accessories complete. (ii) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site.(iii) The operator shall be deployed Skilled ITI technician and qualified tradesman of proper experience . (iv) For payment of minimum wages to the workers of each installtion shall be strictly adhered accordance labour law. (v) Log book for records shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the contracor.
Note for bidder:- 1. Security Deposit @ 10% of total quoted amount in addition to Performance Security @5% shall be deposited by the contractor within 30 days from acceptance of Contract. Ref Sch 'A' Note No 24 on page No 16. 2. Attention of bidder is invited to periodical variation in minimum wages as notified by Govt of India/State Govt (Whichever is more) from time to time, the rates quoted by bidder shall deemed to be inclusive of any such variation and the contractor shall pay the wages as notified by Govt during the execution of contract. No reimbursement would be admissible except for taxes directly related to contract value as covered under Special Condition 27.
MAA SANTOSHI ENTERPRISES
V r traders
Choice india
Vishal Traders
M/s Dhapola Elevator and Engineering
Shiv Enterprises
Powerlite Engineers
HIND CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .