| 1 | L1₹2.2 CrAccepted-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | ₹2.2 Cr | L1 | Accepted-AOC yes |
| 2 | L2₹2.3 Cr+₹10.1 L (4.54%)Rejected-Finance 2 FRIENDS ENCLAVE SHAH NAGAR DEHRADUN | ₹2.3 Cr+₹10.1 L (4.54%) | L2 | Rejected-Finance no |
| 3 | L3₹2.6 Cr+₹38.5 L (17.3%)Rejected-Finance VILL UPPER NATHANPUR PO NEHRUGRAM NR AMBIWALA GURUDWARA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.6 Cr+₹38.5 L (17.3%) | L3 | Rejected-Finance no |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
19 Dec 2019, 5:00 pmClosed
SE
EDC SRINAGAR
Construction of 16.5 Km 33 KV line Gantry at 33 11 KV SS DandaNagraja
2019_UPCL4_21527_1
39/EDCS/2019-20
Open Tender
Electrical Works
Turn-key
120 days
WORK
Construction of 16.5 Km 33 KV line Gantry at 33 11 KV SS DandaNagraja
3 documents required · 3 mandatory
₹11,800
Yes
MD UPCL
₹3.8 L
Yes
25 Sept 2023
12 Dec 2019
20 Dec 2019
12 Dec 2019
19 Dec 2019
13 Dec 2019
Electrical Items :
STP 9 mtr long SP-33 Pole Bottom Portion Hot Dip Galvanized
STP 11M long SP-55 Pole Bottom Portion Hot Dip Galvanized
M.S Channel 125X65X6 mm.
33 KV V-Type X-Arm 100X50 mm
33 kV Polymer Disc Insulator (B&S) Type
33 kV Disc Fitting B&S Rabbit/Weasel/70 KN
33 kV 10KN Polymer Pin Insulator with Pin
M.S Angle 75X75X6 mm.
M.S Angle 65X65X6 mm.
M.S Angle 50X50X6 mm.
GI Wire 5mm/ 6 SWG
GI Wire 4mm/8 SWG
Stay Set G.I. 20x1800 mm.
Stay Wire 7/4.0mm 7/8 SWG
Earthing Rod 20x2500mm
33 KV Line Isolator
33KV Post Insulator
33Kv Fuse Set
ACSR Dog Conductor( 3X16.5+3% Sag )
Earth Wire GI 7/1.6mm 16 SWG (1 Kmx110 Kg./Km. + 3% C&W)
33 KV Outdoor pole mounted CT-PT (combined) with meter box
33 KV PRMC
33 KV Cable Jointing Kit
33 XLPE Cable 3x120 sq mm
30 KV, 10 KA Lightning Arrester
Control Panel FDR 33 KV Double Circuit
33 KV VCB 1250A
GI Earthing Strip 35x6mm
Control cable 2x 2.5 sq mm
Control cable 6x 2.5 sq mm
33 KV LA set complete
33 KV CT structure complete
33 KV PT structure complete
33 KV PRMC
Decentralise Material
Earth Clamp with N&B
Number Plate with N&B
Nut & Bolt
PP Clamp with N&B
Danger Board with N&B
E-Bracket With N&B
Barbed Wire
Bracing Clamp Top
Bracing Clamp Botam
PG Clamp
Eye Bolt
Stay Clamp
24 V Battery set
Safe carriage of following material from Store center Rishikesh (avg distance 100-120 km)to Road side of work by Pvt Vehicle including Loading and Unloading at both ends.
ST Pole 11M 410 SP-55
ST Pole 9 M 410 SP-33
33 KV O/D CT/PT combined unit
Stock Material (Channel,Angel,Conductor,Stay,GI Wire, etc)
Safe carriage of Stock Material from from Road Side to Pit Site (0-1 km) by manualy with loading & unloading at both ends .
ST Pole 11 M 410 SP-55
ST Pole 9 M 410 SP-33
Stock Material (Channel,Angel,Conductor,Stay,GI Wire, etc) 1M.T
33 KV CT/PT
33 KV O/D CT/PT combined unit
Manual shifting/pulling of 33 KV VCB from existing site to plinth/nearby place distance (<200m)
Excavation of Foundation pit & Erection of single ST Pole SP-33 with fixing of all fitting and fixtures for 33 KV line complete including Grouting of Pole in CC ratio 1:4:8 .
Excavation of Foundation pit Erection of D/P on ST Pole SP-33 with fixing of all fitting and fixtures for 33 KV line complete including Grouting of Pole in CC ratio 1:4:8 .
Excavation of Foundation pit Erection of D/P on ST Pole SP-55 with fixing of all fitting and fixtures for 33 KV line complete including Grouting of Pole in CC ratio 1:4:8 .
Excavation of Foundation pit Erection of F/P ST Pole SP-33 with fixing of all fitting and fixtures for 33 KV line complete including Grouting of Pole in CC ratio 1:4:8 .
Muffing of Poles with CC 1:3:6 Block and 45 cm height from ground level including cost of ballast ,cement and sand etc.
Fabrication of M.S. channel/angle iron after cutting in required sizes with drilling of hole upto good finish complete .
Binding, Nozelling and Grouting of Stay complete including Grouting of Stay in CC ratio 1:4:8 and all other supporting works.
Earthing of supports by M.S. earth rods of 2.5 Mtr. long including excavation of pit and digging of M.S. rod to proper depth and connection the earth electrode with the help of Earth wire .
Laying,Spreading ,Stringing and Sagging of ACSR Dog conductor for 33 KV line in 3 Phase with G.I Earth Wire complete with binding & jumpering etc including all supporting works.
Guarding for 33 KV line including all supporting works.
Constrution of Plinth for Tri / Four Pole struture with size 3.2x3.2x1.2 Mtr above ground level and 0.6 Mtr below ground level including the cost of material such as cement ,brick ,ballast,sand etc complete work
Constrution of Plinth for Double Pole struture with size 3.2x1.2x1.2 Mtr above ground level and 0.6 Mtr below ground level including the cost of material such as cement ,brick ,ballast,sand etc complete work
Trimming/Chopping tree branches falling in between the route of proposed 33 KV line.
Fixing & Filling of 33 KV cable jointing kit
Installation of 33 KV metering cubicle in metering room with grouting in C:C 1:4:8
Making of 33 kv connection at both sides in metering cubicle
Laying of 33 kv XLPE cable 3x400/300/120 Sqmm one feet deeep including unrolling of drum
Mounting & Fixing of LA set on D/P structure including making all connections by GI strip size 35 x6 mm to earth point.
Installation of 11/33 KV PRMC in metering room with CC as per RESSPO
Earthing of Metering cubicle(02 Nos)
Providng & Fixing of danger board complete including clamps Nut & Bolts
Providing CC in various structures as per enclosures including cost of cement and sand.
Erection of CT-PT unit at 33/11 kv S/S (01 CT & 01 PT)
Erection of 33 KV Line Isolator
Erection of 33 kv control panel in all respect & making connections complete
Erection of 33 KV LA
Erection of 33 KV fuse set
Making of trench (.45x.45x.3) x 4 for laying of 33 kv cable 3 x120 sq mm
Fabrication of MS Channel/Angle iron after cutting in required size with drilling holes
Painting with one coat of red oxide primer & two coats of AI Paint ISI Mark
33 kv LA structure
33 kv CT structure
Isolator & Fuse set structure
Erection of 33 kv VCB in all respect & making connections complete
Installtion of 33 kv CT-PT combined unit with all connections
Earthing of CT-PT structure & VCB
Construction of metering room for metering cubicle at S/S end with building material
Installation of 33 KV PRMC in metering room with CC .
UTTARANCHAL FORGINGS INDUSTRY
BIJENDRA KUMAR POKHRIYAL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .