Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.1 L+₹4,691.60 (2.25%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.3 L+₹22,254.45 (10.7%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹2.3 L+₹22,962.95 (11.0%)Rejected-AOC | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Alathur Labour Contract Co Operative Society Ltd L4 | Robin Mathew L1 | manoj.k L3 | BIJU. K L2 |
|---|---|---|---|---|---|---|---|
| 1.00Jungle clearance and silt removal | |||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 12,250 | sqm | 7.56 ₹92,610 | 7 ₹85,750 | 7.53 ₹92,242.5 | 6.96 ₹85,260 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 295 | cum | 209.97 ₹61,941.15 | 185 ₹54,575 Lowest | 209.45 ₹61,787.75 | 193.48 ₹57,076.6 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 2,680 | sqm | 28.76 ₹77,076.8 | 25.5 ₹68,340 Lowest | 28.69 ₹76,889.2 | 26.5 ₹71,020 |
Tender Value
₹2.8 L
EMD Value
₹7,103
Closing Date
4 Jul 2026, 4:00 pmClosed
AssistantExecutiveEngineer
AssistantExecutiveEngineer, IrrigationSubdivision No.2,Chittur
GENERAL-CPP-NP-2026-27-MLBC Jungle clearance uprooting Vilayanchatahnur branch canal 4000 to 9500
2026_Irrig_855204_1
IRR/PI/TR/1784/2026_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
365 days
Chittur
Please refer Tender documents.
7 documents required · 7 mandatory
₹630
Yes
₹7,103
Yes
2 Sept 2026
26 Jun 2026
7 Jul 2026
26 Jun 2026
4 Jul 2026
26 Jun 2026
26 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Jungle clearance and silt removal | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1445331.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd1784.pdf
Tender Documents • 2.07 MB
BOQ_1445331.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .