Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹35.5 L+₹1.6 L (4.76%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹38.1 L+₹4.2 L (12.5%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹39.8 L+₹6.0 L (17.6%)Rejected-Finance 51 HANUMAN COLONY GALI NO 4 CHAK 5 E CHHOTI SRI GANGANAGAR RAJ | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹42.9 L+₹9.0 L (26.5%)Rejected-Finance H1 7 8 IT PARK ROAD NO 4 IPIA KOTA RAJ 324005 | KOTA | RAJASTHAN | 324005 | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/s Prem Associates L9 | SINGH ENTERPRISES L2 | Ganesh Contruction L7 | M/S MOHINI ENTERPRISES L8 | S AND A ENGINEERS CONSTRUCTION CO L11 | Aditya Enterprises L5 | Pioneer Enterprises L10 | SHIVA CONSTRUCTION COMPANY L4 | TARKESHWAR DASS CONSTRUCTION COMPANY L1 | S K GUHA & CO. L6 | ANNAPURNA ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster on stone/brick/concrete surfaces including racking out joint, hacking for key, scrubbing down with water complete all as specified and as directed. | 620 | Sqm | 10 ₹6,200 | 12 ₹7,440 | 15 ₹9,300 | 12 ₹7,440 | 50 ₹31,000 | 10 ₹6,200 | 13 ₹8,060 | 30 ₹18,600 | 20 ₹12,400 | 20 ₹12,400 | 8 ₹4,960 Lowest |
| 2.00 | Demolition of cement concrete(unreinforced) in ground floors and paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 4.5 | Cum | 120 ₹540 | 123 ₹553.5 | 120 ₹540 | 120 ₹540 | 100 ₹450 Lowest | 100 ₹450 Lowest | 120 ₹540 | 200 ₹900 | 120 ₹540 | 150 ₹675 | 123 ₹553.5 |
| 3.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 75 | Cum | 120 ₹9,000 | 123 ₹9,225 | 120 ₹9,000 | 150 ₹11,250 | 100 ₹7,500 Lowest | 100 ₹7,500 Lowest | 120 ₹9,000 | 200 ₹15,000 | 150 ₹11,250 | 150 ₹11,250 | 123 ₹9,225 |
| 4.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 8 | Cum | 120 ₹960 | 123 ₹984 | 120 ₹960 | 150 ₹1,200 | 100 ₹800 Lowest | 100 ₹800 Lowest | 120 ₹960 | 200 ₹1,600 | 150 ₹1,200 | 150 ₹1,200 | 123 ₹984 |
| 5.00 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area not exceeding 1.50 sqm each complete all as specified and as directed. | 10 | Each | 110 ₹1,100 | 112 ₹1,120 | 120 ₹1,200 | 120 ₹1,200 | 100 ₹1,000 | 100 ₹1,000 | 100 ₹1,000 | 100 ₹1,000 | 50 ₹500 Lowest | 100 ₹1,000 | 112 ₹1,120 |
| 6.00 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area exceeding 1.50 sqm but not exceeding 4.00 sqm each complete all as specified and as directed. | 25 | Each | 120 ₹3,000 | 121 ₹3,025 | 120 ₹3,000 | 150 ₹3,750 | 150 ₹3,750 | 100 ₹2,500 | 125 ₹3,125 | 100 ₹2,500 | 50 ₹1,250 Lowest | 100 ₹2,500 | 121 ₹3,025 |
| 7.00 | Taking down wooden door shutter area exceeding 2.00 sqm each incl iron mongary and removing to store complete all as specified and as directed. | 6 | Each | 110 ₹660 | 112 ₹672 | 120 ₹720 | 120 ₹720 | 150 ₹900 | 100 ₹600 | 125 ₹750 | 100 ₹600 | 50 ₹300 Lowest | 100 ₹600 | 112 ₹672 |
| 8.00 | Dismantling of wrought or mild steel work of any description not otherwise described into primary parts complete all as specified and directed. | 24 | Quintal | 10 ₹240 Lowest | 12 ₹288 | 10 ₹240 Lowest | 50 ₹1,200 | 50 ₹1,200 | 100 ₹2,400 | 10 ₹240 Lowest | 200 ₹4,800 | 50 ₹1,200 | 100 ₹2,400 | 12 ₹288 |
| 9.00 | Demolition of stone slabs and tiles of any description or thickness laid, bedded and pointed in any mortar in floors, aprons etc.complete all as specified and as directed. | 9.4 | 10 Sqm | 60 ₹564 | 51 ₹479.4 | 55 ₹517 | 60 ₹564 | 50 ₹470 Lowest | 100 ₹940 | 60 ₹564 | 200 ₹1,880 | 60 ₹564 | 200 ₹1,880 | 51 ₹479.4 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 80 | Sqm | 15 ₹1,200 | 12 ₹960 | 10 ₹800 Lowest | 50 ₹4,000 | 50 ₹4,000 | 100 ₹8,000 | 15 ₹1,200 | 20 ₹1,600 | 40 ₹3,200 | 20 ₹1,600 | 12 ₹960 |
Tender Value
Refer Docs
EMD Value
₹69,000
Closing Date
30 Jun 2026, 6:00 pmClosed
Sh Rakesh Birla, EE
GE KOTA Pin-324001
REPAIR/ UPGRADATION OF B/R ITEMS TO WATER SUPPLY INSTALLATIONS AT MIL STN KOTA
2026_MES_770652_1
9094E8
Open Tender
Civil Works
Item Rate
180 days
Mil Stn Kota
As per tender documents
8 documents required · 8 mandatory
₹500
GE KOTA
₹69,000
Yes
19 Aug 2026
8 Jun 2026
7 Jul 2026
8 Jun 2026
30 Jun 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster on stone/brick/concrete surfaces including racking out joint, hacking for key, scrubbing down with water complete all as specified and as directed. | 620 | Sqm | - | - |
| 2 | Demolition of cement concrete(unreinforced) in ground floors and paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 4.5 | Cum | - | - |
| 3 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 75 | Cum | - | - |
| 4 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. | 8 | Cum | - | - |
| 5 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area not exceeding 1.50 sqm each complete all as specified and as directed. | 10 | Each | - | - |
| 6 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area exceeding 1.50 sqm but not exceeding 4.00 sqm each complete all as specified and as directed. | 25 | Each | - | - |
| 7 | Taking down wooden door shutter area exceeding 2.00 sqm each incl iron mongary and removing to store complete all as specified and as directed. | 6 | Each | - | - |
| 8 | Dismantling of wrought or mild steel work of any description not otherwise described into primary parts complete all as specified and directed. | 24 | Quintal | - | - |
| 9 | Demolition of stone slabs and tiles of any description or thickness laid, bedded and pointed in any mortar in floors, aprons etc.complete all as specified and as directed. | 9.4 | 10 Sqm | - | - |
| 10 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 80 | Sqm | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tender9094.pdf
Tender Documents • 0.84 MB
BOQ_863015.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .