Tender ID
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
16 Mar 2026, 5:00 pmClosed
Assistant Manager, North Zone
Laying New Drainage line and upgradation work and Repairing Chamber/MH in parihar nagar, shyamnagar ,Vidyanagar and Diff.Chawls Regarding Pollution work in Kubernagar ward in North zone.(ARC)
282684
Tender notice No.18/2025-26 TN-59
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
3 Mar 2026
3 Mar 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
17.03.2026 Up to 17.00 hrs. in O/o Asst. Manager (North Zone). The technical bid shall be
opened online on Dt.- 19.03.2026 at 11.00 hrs. Any change / correction / corrigendum in
respect of above work shall be placed on line. Contractors are requested to see the website
before 24 hours of submission of their tender.
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commissioner
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for :- Laying New
Drainage line and upgradation work and Repairing Chamber/MH in parihar nagar,
shyamnagar ,Vidyanagar and Diff.Chawls Regarding Pollution work in Kubernagar ward in
North zone.(ARC)
1 Name of work :- Laying New Drainage line and upgradation work and
Repairing Chamber/MH in parihar nagar, shyamnagar
,Vidyanagar and Diff.Chawls Regarding Pollution work in
Kubernagar ward in North zone.(ARC)
2 Time Limit 12 MONTHS
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC or equivalent
register with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Tender fees Rs.900/-- Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
7 Earnest Money Deposit Rs.10000/- (Demand Draft or pay order or Bank Guarantee in favor
of Municipal Commissioner, AHMEDABAD/) To be submitted as
prescribed in 8.0 below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Scheduled Bank and valid for 120 days.(As
per AMC finance dept. circular No-5 Dt.5/5/07 & F.D. Circular No.
Dt. 7/08/2010) & attached ANNEXURE - 1 finance dept. circular No -
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager (NORTH zone) , Rajiv Gandhi Bhavan, Memco-
Naroda Road, Ahmedabad To be Submitted Physically As per N.I.T
9 Date of Opening of Technical Bid will be opened online as per N.I.T. in the office of Addl.
Technical bid City Engineer (North Zone), Rajiv Gandhi Bhavan, Memco – Naroda
Road, Ahmedabad Municipal Corporation, Ahmedabad
10 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee /
Demand Draft / Local MICR Cheque.(As per Annexure-I)
11 Mode of sending the Price bid should be submitted by online e-tender only and Technical
Tender Documents bid should be submitted physically also in sealed envelope systems
By RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate
(One Original & One Duplicate) Each part shall be separately duly
sign & seal by contractor .
12 liquidated damages 0.1% of contract price per day from the date of delay. Maximum limit
of liquidated damages for delay in completion of work will be 10% of
the Contract Price rounded of to the neared thousand.
13 Deduction of Retention Retention
Money from each RA Bill 1. @ 2% of the value of work done will be deducted from each RA bill. It
will be released along with release of payment of Final Bill.
14 Place of Arbitration Ahmedabad
15 Language of Arbitration English
16 Amount to be deducted Welfare cess as per act 1996 @ 1 % of bill amount
from each bill for labour
welfare fund (non-
17 Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable..
18 Defect &Liability Period The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed before
the period mentioned hereunder from the certified date of completion,
The within 15 days of receipt of the notice. In the case of failure on the
part of the contractor, the Engineer-in-charge may rectify or remove or
re-execute the work at the risk & cost of the contractor. The Engineer-
in-charge shall be entitled to appropriate the whole or any part of the
amount of security deposit towards the expenses, if any, Incurred by
him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified
date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
12 months from the certified date of completion which should include
(d) For building works, the period specified in (a), (b) or (c) above OR
elapse of monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period, the
30th September may be treated as the last date.
19 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or
parts of work major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-mail
shall be considered legal and binding for the same. Failure of comply to
start the works in 48 hours of intimation as above by contractor the
contractor shall be levied penalty of (1) Rs.1000/- per day (for tenders
amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor shall
make contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
20 Compensation for Delay 10% of Remaining work (As per Circular)
21 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
22 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
23 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons there of.
Seal and Signature of the Bidder Addl.City Engineer
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the Table
Sr. Name of Works Approximate Earnest Completion
No. value of works Money Period
(Rs.) Deposit (Rs.)
1 Laying New Drainage line and upgradation work Rs.10,00,000.00 Rs.10000.00 12 MONTHS
and Repairing Chamber/MH in parihar nagar,
shyamnagar ,Vidyanagar and Diff.Chawls Regarding
Pollution work in Kubernagar ward in North
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand Draft /
Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad, payable
at Ahmedabad, which shall be non refundable. The Details of Tender fees shall be submit with scan
copy at the time of Quoting price bid of the tender and Physically to be submitted along with
technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad,. Earnest Money Deposit will have to be specified in Clause 2 of Financial
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi Bhavan,
Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addl.City Engineer (N/Z) , 1st Floor, Rajiv
Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road, Ahmedabad-25. in the
presence of bidders or their representatives who choose to attend. In the event of the specified date
of bid submission/opening being declared a holiday for the Employer, the bids shall be received
/opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per N.I.T
and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/
Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The Bid envelopes shall
be marked as follows:-
➢ Tender Document Vol.
➢ Registration certificate of class
➢ Power of Attorney
➢ Personal Details
➢ Enclosures as asked in tender
➢ Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Norada Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY. Projects for which
incomplete information has been provided will not be considered for evaluation. The Bidder may
attach separate sheets if so required. However, the final bound document submitted, has to be
submitted in vertical A4 size (210 mm X 297 mm) except Form of Bids.
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the package
(except those received late) containing the sealed Tender volume and other enclosures then
announce the names of bidders in the presence of bidders or their representatives who choose to
attend on the date and time mentioned in the IFB. In the event of specified date of bid opening being
declared as a holiday for the Employer, the Tender will be opened at the appointed time and location
on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at
the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the Employer
may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation
for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as non-
responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid
EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall
be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied
by the requisite certificates, undertaking and other relevant information specified in the bid
documents and is substantially responsive to the requirement of the bidding documents and provides
any clarification for ascertaining the correctness of the information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, including
the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.(Following clause no. 5 of ITB).
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted.
This letter shall name the sum which the Employer will pay the Contractor in consideration of the
execution, completion and maintenance of the Works by the Contractor as prescribed by the
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder has to
deposit security deposit / Bank Guarantee with in 15 days after receiving letter of Indent. Time
limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his
bid. Such request by the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison
or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons
not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer's processing of bids or award decisions
may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself
on its own responsibility all information that may be necessary for preparing the bid and entering into
a contract for construction of the Works. The costs of visiting the Site shall be at the bidder’s own
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition that
the bidder, its personnel and agents, will release and indemnify the Employer and its personnel and
agents from and against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and expenses incurred as a
result of the inspection.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document
for the construction of works (as defined in these documents, hereinafter referred to as "the Works")
detailed in the table given in the IFB.
1.2 The Works consist of:
Laying New Drainage line and upgradation work and Repairing Chamber/MH in
parihar nagar, shyamnagar ,Vidyanagar and Diff.Chawls Regarding Pollution work in
Kubernagar ward in North zone.(ARC)
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
➢ A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
➢ The bidders shall have a registration with State PWD, and/or CPWD for Required class and or
equivalent with specialization in road works. If contractor is not registered with AMC in the
relevant class, on award of contract he shall be required to register himself with AMC within
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
General information
All individual firms must complete the information in this form. Nationality information shall be provided
for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
➢ Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading
or false representations in the forms statements etc. for the period to be decided by the Employer
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint
venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and
the Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of interpretation
of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission
specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request
and the responses thereto shall be made in writing or by fax. A bidder may refuse the request
without forfeiting his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid but will be required to extend the validity of his Bid Security for the
period of the extension, and in compliance with Clause 2 ( Financial Terms & Conditions) in all
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the
person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner
and medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will
rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
• Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the
firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
❖ “corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or
induce others to do so, by misusing the position in which they are placed, and it includes the
offering, giving, receiving, or soliciting of anything of value to influence the action of any
such official in the procurement process or in contract execution; and
❖ “fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower, and
includes collusive practice among bidders (prior to or after bid submission) designed to
establish bid prices at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
• Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
• If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
• Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria it will be
• Those who do not meet with the eligibility criteria need not submit the Tender document.
• Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
• Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing
laws as well as framed from time to time). Any penalties laid due to violation of such laws shall be
directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
• Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic
blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent
marking on traffic signs to be provided so that it should be visible at night. During night working hours
safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary diversions
for proper working at site including traffic signages, safety cones, traffic blinkers, barricading tapes,
red and green flags etc for making easy smooth and safe conditions for the traffic. The Contractor
shall and must provide above at his own cost.
• Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply Company,
follow up and getting the supply, filling the necessary test reports to the power supply company. All
official fees including security deposits and other expenses shall be of initially paid by the contractor.
• Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
➢ The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
➢ All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly
as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when
the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful bidder
shall deliver to the Employer, a Initial Security Deposit in the form of a Bank Guarantee for an
amount equivalent to 5% (five percent) of the Contract Price .
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued from any Nationalized or RBI approved foreign bank having net worth of
more than Rs.500 Crore of Indian Operation and acceptable to Employer.
(C) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per AMC finance March -31 Circular No-10, Dt.05.08.2024
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - Compensation for (0.10%) zero point one percentage of Delay contract price for
uncompleted work per day subject to a maximum up to ten percentage of contract price or as decided
by Municipal Commissioner.
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on material
procurement or any other component for the works from any source shall be borne by the
contractors. GST will be paid extra by AMC/Authority at prevailing rate to the Contractor.
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in
the rates and prices and the total bid price submitted by the bidder and the evaluation and
comparison of bids by the Employer shall be made accordingly.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred. (only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of Gujarat
State Road and Building Department / Water Resources Department shall be applicable. Binding
on the contractors unless specifically mentioned about it hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of Gujarat
“wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State Public
Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer wherever
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work Laying
New Drainage line and upgradation work and Repairing Chamber/MH in parihar nagar,
shyamnagar ,Vidyanagar and Diff.Chawls Regarding Pollution work in Kubernagar ward in
North zone.(ARC) Ahmedabad.OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
▪ The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as under-
▪ Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given separately in Tender Document
and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the heading
“TERMS AND CONDITION OF CONTRACT” shall be read as under-
▪ Clause 1: Security Deposit: to be read as per the details given separately elsewhere in the
tender documents.
▪ Clause 2: Liquidated Damages for delay: to be read as per the details given separately
elsewhere in the tender documents.
14. Clause No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted in the form B-1.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different sites
simultaneously. Contractor's having labour force available during festivals shall only apply. Contractor can
not stop the work due to on availably of labour force. In case progress is delayed due to unavailability of
labour contractor shall be penalized Rs.1000/- per day of delay separately.
5. No rate difference will be paid for due to any increase in rate of any item due to any reason what so ever.
6. No price escalation / advance payment / machinery advance will be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor shall
not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the
Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a
reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the relevant
Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be taken as
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it, specifications
shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification o f the items of work is in the
form of a designation containing the number of the specification of the material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in the
work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be
stone at site of work in a systematic manner. Materials shall be stored in such a manner as to prevent
damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their quality and
fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of
work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and in
good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works during execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over loading
of the various components of the structure during execution or after completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of the
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of Twelve Hundred Calendar days (120)
from opening of price bids.
SECURITY DEPOSIT
Within 15 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank Guarantee, pay order, or
demand draft of Nationalized Banks and Schedule Banks approved by AMC only.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to that
letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is given within
10days of issuance of Letter of Intent, time limit shall be counted from that date. If S.D is given
after 15 days of issuance of letter of intent, contractor shall be finned Rs. 200/- per day of delay
and shall be deducted from contractor’s bill. In this case time limit shall start latest by the 10th
day of letter of intent, Security Deposit of 5% of tender amount shall be deposited by pay order,
demand draft, cheque of nationalized bank /scheduled bank by pay order, demand draft, cheque
of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled and
the contractor shall not be given any tender, offer, quotation work in AMC for one year.
3. Conditional tender shall not be accepted
4. Tender validity period is 120 days from the date of opening of tender
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which
tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1 form
conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be final.
7. Contractor shall have to deposit Earnest Money deposit with tender.
8. Work shall be allotted as per contractors registration class.
9. Contractor shall have to work in such a system that there shall be no damage to any service line
of electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case of
damage to service line, the whole responsibility of accident shall be on contractor’s shoulder. It
will be responsibility of contractor to safe guard the labours against any accident or damage of
lives. In case of police complain, Contractor shall be held responsible for negligence. In case of soil
/land collapse, contractor shall be held responsible for not supporting the soil suffering with
strutting, shuttering Contractor shall safeguard the labour before allowing the labour to enter in
excavated or other site. In case of accident to labours, contractor shall be held responsible for
police complain against him. AMC’s staff shall be responsible for any accident at the site of the
10. Contractor shall take insurance of his all labour. and supervisory staff
11. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the date of
12. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put up on
AMC’s web site.
13. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
14. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
15. As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor shall not have right to any price rise. In case of decrease in any
tender item quantity, contractor shall not ask for compensation.
16. If any construction material brought to site by contractor , is not as per specification, or any
inferior quality material brought to site, then such rejected material shall be removed from the
site within 24 hours, otherwise AMC can throw away such material at any place and recover the
amount for such removal work from contractor bill. In this case contractor shall not be entitled
for compensation.
17. Cost of testing of material shall be done by the contractor. He shall provide vehicle for taking
material/staff from site to testing laboratory/ manufacturing site and contractor shall be bear the
cost of transportation of staff and material.
18. Contractor shall work as per labour Act. Contractor shall not be given any payment if labour
act rules are not followed or insurance of labour is not taken for work
19. Contractor shall deposit the material on site in such a way that it should not become obstruction
to any one in any way
20. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
21. If asked by AMC Engineering staff, contractor shall take photograph of site of work/before start
of work, during work and after the completion of work, with digital camera and deposit to AMC
office or transfer photograph from camera to AMC computer. No additional cost shall be paid.
22. In case of cancellation/rejection of tender, contractor shall not be entitled for any compensation
23. In case of extra item, rate shall be taken from SOR of the year of tender preparation. If item is
not available in SOR, then market rate shall be derived by the Eng. dept by rate analysis.
Contractor shall not ask for the rates as per his rate analysis. This should be clearly understood
and taken in to consideration while quoting the tender by the contractor.
24. During execution of work, contractor shall take safety measures like protection by ropes, drums,
danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement & instruction of
Engg.- in- charge. In case of accident due to lack of protection, contractor shall responsible for
police complains, compensation etc AMC staff shall not be held responsible for contractors
25. If instructed by AMC officials, contractor shall have to keep daily progress register and get is
signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours, employed,
work done, rectification work carried out by contractor after Eng.-in-charge inspection & the
compliance of the same. If such rectification work is not done by contractor within 24 days the
contractor shall be finned Rs. 250/- day of delay & shall be recovered from the contractors bill
26. Contractor is not entitled for any type of compensation or right for the cancellation of tender or
tender items by any means.
27. If work is not completed within specified time limit penalty shall be recovered from bills as per
tender condition.
28. Deduction from bills shall be done as per rules prevailing or the rules which shall come in to
force, by State or Central Govt.
29. 1% amount shall be deducted for labour welfare fund as per state Govt order.
30. Quantity in item is tentative. It is likely to be change.(increase or decrease) as per site
requirement during execution of work.
31. All above conditions shall over rule the conditions given in Form B-1
32. Contractor shall have to register the work as per labour act & as per building safety act, 1906 with
,Dy.Director building safety act, Shram bhavan, 5th floor labour commissioner office, Khanpur,
33. Befor quoting tender, contractor shall have to take complete information of the work after seeing
site and from the concerned Asst. Engineer or Asst. city engineer.
34. In case of the bank detail are not given then EMD return procedure shall be delayed.
35. Before quoting the tender contractor should know that, he has seen the site & understood the
item of works, site conditions. He should be in a position to provide labours at the time of
festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the year
Contractor can not say that he has no labours due to festivals.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Addl.City Engineer
Date: (North Zone)
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzhh btxule Nh<tuu
1 xuLzhhle jtgft<
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuL÷ y&Jt htsg mhfthle btLg gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg
ftuLx[[tfxhu y.Bgw.ftuvtuo.btk btLg ftuLx[[tfxhtule gtœebtkk hSMxu[Nl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Keltkk «btKvºtle MJ«btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug <ublu s ytvJtbtkk
ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe mJj<, ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh mh¾gwjh,lk -
17, <t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMx[uNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve
ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath yluJvhtNlt ceò
hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb vwhwk fhJt <&t ftblt
buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je
juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
2: yt ftble mbg bgtoœt bubtuhuLzbbt sKtJuj «btKu le hnuNu.
3: xuLzh Jujezexe rvhegz ( 120 ) rœJm mw^ele hnuNu.
4: xuLzh Ve ylu R.yub.ze.
4 y: xuLzh Ve zebtLz z[tVx &e aqfJJtle hnuNu. œhuf xuLzh œeX yjd xuLzh xuLzh Ve ChJtle hnuNu. xuLzh Ch<e JF<u yluoMxble
ChJtle hnuNu. ytuAe hfble xuLzh Ve,R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
4 c: xuLzh mt&u bwfJtbt ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhkxe/zebtLz z[tVx MJefthJtbtk ytJNu. œhuf xuLzh œeX
yjd R.yub.ze ChJtle hnuNu. R.yub.ze hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb btxu htu¾zt, zebtLz z[tVx, cukf
duhkxelt MJYvbt <&t Yt. 1 fhtuz &e Wvhle ykœtS< hfblt ftb btxu R.yub.ze le hfb btºt zebtLz z[tVx, vu ytuzoh fu cukf
duxhelt MJYvbtk ytvJtle hnuNu. yLg ftuR he<u Chuj R.yub.ze. btLg htFJtbtk lnek ytJu ylu xuLzh hœct<j XhNu.
4 f: xuLzh Ve <&t R.yub.zele hfblt ze.ze vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlw ltb <&t btuctRj lkch ylu vtxeo ftuz yJ~g
4 z: cukf duhkxe btºt ybœtJtœ Nnuhle s MJefthJtbt ytJNu.
4 R: ytuAe hfble xuLzh Ve, R.yub.ze fu xuLzh Ve, rJltlt xuLzhtu hœ ct<j (fuLmj) dKtNu.
5 y: xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Che xuLzh ztu¾gwbuLxm vh< fhJtlt hnuNu.
5 c: fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhJuj l ntug <u
ftuLx[txh©eyu xuLzh ChJt lne.
5 f: ftuLx[ftxhtuyu xuLzhbt cukflw ltb,Ft<t lkch ,btRfh lkch, mhltbw ,btu.lkch,vtxeo ftuz ,RbuRj ytRze MvÐ yûthtubt
5 z: yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvhtuf< mhltbu YcY/hSMxh yuze./Mvez vtuMx/ fwheyh &e rlg< mbg bgtoœtbt
btufjJtlt hnuNu.mekdj xuLzh ftuve/mne fgto Jdhle ftuve hœ fhJtbt ytJNu.
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt. xuLzh Chlthu yt he<u cl<e hfb vK Ftltbtk ltuk^Je ylu
hfbltu fwj mhJt¤tu bwfJtu.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh
mt&u hsw fhJtlwk hnuNu.
3) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7) xuLzhbt stu ftuR mw^tht J^tht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju œeJmu rlg< JucmtRx y&Jt Jtuzo fauheyu sYhe
<vtm fhelu s xuLzh btufjJw.
xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn ylu ytJe ftuR AufAtf
fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkkfzt vh Auftu bthelu <ult mtawk
jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkkt
ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu
ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
xuLxhhu ctujvtuWLx vul lt cœju Ntne Jt¤e vul &e Chujt xuLzh <whk< s ybtLg dKJtbkt ytJNu.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk bwfuj Nh<
y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u
btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu fhe NfNu
lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R NfNu lrn.
8 R: xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw
ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
9: rJmkkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtkk
xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg htFJtbtkk ytJNu.
10 y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR. ytÃgt
<theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY &guj dKJtbt
ytJNu. <&t <u mbg œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
10 c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk ytJNu
ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk
Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10 f: bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu suxjt rœJm ftbdehe btuze vqhe fhuj ntug <uxjt rœJmle
vulÕxe xuLzh hfb (fhth rfkb<) lt 0.1 % bwsc «r< rœJm bwsc xuLzhbtk bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe
ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
xuLzh Chuj œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mrJom -ftbdehe, Jes¤e, htugÕxe Jduhu <btb
Faoltu <&t sYh sKtg ðgthu ht<vt¤elt ftblu jd<t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle
ftuR awfJKe ykkdult <ublt ftuR œtJt ægtlbtkk juJtNu lnekk. xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe <u
ctkk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk.
<ublw xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu
vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK
ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «Joðbtl rlgb bwsc fhJtbt ytJNu. <&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb (xuLzh bwsclwk vubuLx + yu¾Mx[t ytRxb) Wvh
% juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt cejbtkk&e fvt<
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth œM<tJusbtkk
œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ
(2) xuLzh Vtubolwk CtJvºtf
(3) MvuNeVefuNl
z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
(2) xuLzh Vtubole ylwmwra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atso Ãjtl <&t
MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJtle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 : atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule mkvwKo
sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu
lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle hnuNu. CuFz ^me l
vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e
bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt
sJtcœth hnuNu. Bgwrl.ftuvtuohN u lltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn. Btswhtultu rJbtu vK W<thJtu.
17 : bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu
jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu ftb fhJt
ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <wh<k rœl 1btk vh< jR sJtltu hnuNu. yLg&t <ule
lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt ftgœtlw
vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t xuMxekd
fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu
25: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ rM&<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle ftbdehe
fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u
bwsc awfJKe fhJtbtk ytJNu.
26: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef vxe,rJ.
ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle hnuNu.
27: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk juch
yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
28: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t yr^ftheytuyu ftb
mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤
Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
29: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu
su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn
ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t
zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
30: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
31: mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mh¾gwjh lu.38,<t.21/11/22 <&t mûtb m•tle b¤uj bkswhe bwsc
S.yum.xe. rmJtg dKºtebtk juJtbtk ytJuj <&t «Jo<btl S.yum.xe. bwsc awfJJt vtºt &Nu. su&e <btb cezomu <u bwscle
dK<he fhe xuLzhtu ChJtlt hnuNu.
32. mefgwhexe zevtuÍex / vVtuobLm duhxele hfb Yt.1 fhtuz mw^ele ykœtS< hfblt ftb,ze.ze ,cukf duhkxelt MJYvbt <&t Yt.1
fhtuz &e Wvhle ykœtS< hfblt ftb btxu mefgwhexe zevtuÍex / vVtuobLm duhkxele hfb btºt ze.ze.,vuytuzoh, cukf duhkxe lt
MJYvbt ytvJtle hnuNu. zebtLz z[tVx / cukf duhkxe ‘‘ Bgwrl.frb§h©e ybœtJtœ ’’lt ltbltu ytvJtltu hnuNu.
33. ybœtJtœ Bgwrlrmvj ftuvtuohuNl BGþrlrm5j frbNlh©ele muLx[j yturVm mhfgwjh lk 41 bwsc xuLzhh îtht The
Apprentices Act, 1961 yLJgu <uytulw EMPLOYER ltufheœt<t <hefu yJ~g hSMx[uNl fhtJJtlw hnuN.u
yufhthlwk Vtubo
1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t œM<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
TECHNICAL SPECIFICATIONS
SPECIFICATIONS OF MATERIALS
1.1. Water shall not be salty or brackish and shall be clean, reasonably clear and free objectionable
quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other deleterious
material which will either weaken the mortar or concrete or cause efflorescence or attack the
steel in R.C.C Container for transport, storage and handling of water shall be clean. Water shall
conform to the standards specified in I.S.456-1978.
1.2. If required by the Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than 10 per cent in strength of mortar
prepared with water sample when compared with the results obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.
1.3. Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be
free of elements which significantly affect the hydration reaction or otherwise interfere with the
hardening of concrete during curing or those which produce objectionable stains or other
unsightly deposits on concrete or mortar surfaces.
1.4. Hard and bitter water shall not be used for curing.
1.5. Portable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per
M-4. White Cement :
4.1 The white cement shall conform to I.S. 80412-E
M-5. Coloured Cement:
5.1 Coloured cement shall be with white or gray Portland cement as specified in the item of the
5.2 The pigments used for coloured cement shall be of approved quality and shall not exceed 10% of
cement used in the Mix. The mixture of pigment shall be properly grounded to have a uniform
colour and shade. The pigments shall have such properties to provide for durability under
exposure to sunlight and weather.
5.3 The pigment shall have the property such that it is neither by the cement nor detrimental to it.
6.1. Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic
matter, loam, mica or another deleterious substance and shall be got approved from the
Engineer-in-charge. The sand shall not contain more than 8 percent of silt as determined by field
test. If necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
The sieve analysis of coarse shall be as under:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
6.3 Fine Sand:The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation Passing Sieve Designation Passing Sieve
M-8. Stone Grit:
8.1. Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of proper
gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally
comply with the provisions of I.S. 383-1970. Unless special stone of particular quarries is
mentioned, grit shall be obtained from the best black trap or equivalent hard stone as approved
by the Engineer-in-charge. The grit shall have no deleterious reaction with cement.
8.2. The grit shall conform to the following gradation as per sieve analysis:
I.S.Sieve Percentage by I.S.Sieve Percentage by
Designation through Sieve Designation through Sieve
8.3. The crushing strength of grit will be such as to allow the concrete in which it is used to used to
built up the specified strength of concrete.
8.4. The necessary tests for grit shall carried out as per the requirements of I.S.2386(Parts I to VII)
1963, as per instructions of the Engineer-in-charge. The necessity of test will be decided by the
Engineer-in-charge. The necessity of test will be decided by the Engineer-in-charge.
Sand: Sand Shall conform to specification M-6.
10.1. Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and sand as
may be specified in the item. The slaked lime and sand be measured by volume.
10.2. Preparation of Mortar :
10.3.1. Lime mortar shall be prepared by wet process as per I.S. 1625-1971. Power driven mill shall be
used for preparation of lime mortar. The slaked lime shall be placed in the mill in an even layer
and ground for the 180 revolutions with a sufficient water. Water shall be added as required
during grinding (care being taken not to add more water) that will bring the mixed material to a
consistency of stiff paste. Thoroughly wetted sand shall then be added evenly and the mixture
ground for another 180 revolutions.
10.3. Storage : 10.4.1 Mortar shall always be kept damp, protected form sum and rain till used up
covering it by tarpaulin or open sheds.
10.4. Use : 10.5.1 All mortar shall be used as soon as possible after grinding it should be used on the
day on which it is prepared. But in no case mortar made earlier than 36 hours shall be permitted
11. or the Above Building Technical Specification can be Available from Ahmedabad Municipal
Mode of Measurement should be as per IS
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of Work: Laying New Drainage line and upgradation work and Repairing Chamber/MH
in parihar nagar, shyamnagar ,Vidyanagar and Diff.Chawls Regarding Pollution work in
Kubernagar ward in North zone.(ARC)
temNo. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil includingsorting out
1 stacking of useful material & disposing of excavated stuff up to 50 tm. leadloose or soft soil,
girding, lighting, fencing the trenches', and pits. (depth measured fromGL). Etc.comp.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of
excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructions of C.E. or his representative will
be strictly followed. Measurement shall be given onCmt.basis.
Excavationforfoundationupto(a)Upto0to2.0Mt(b)from2.0to3.0mtdepth(c)from3.0to
5.0mtdepth(d)above5.0mtdepthincludingsortingoutandstackingofusefulmaterialsanddisposalof
theexcavatedstuffupto50mt.lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of
excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructionsof C.E.orhisrepresentative
willbestrictlyfollowed.
MeasurementshallbegivenonCmt.basis.
ItemNo.2/ (a) Extra rate over item of excavation of earth for excavation of asphalt pavement /
3 RCCofthickness
upto0.20meterincludingdemolishingtheasphaltcarpet,metal,soiling/cuttingReinforcementetc.
comp.withstackingthematerialasdirected.(app.rate)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transportaion
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transportaion
Extra rate for excavation of asphalt pavement of any thickness including demolishing theasphalt
carpet, metal, soiling etc. complete with stacking the materials as directed. Theroad surface of
asphalt shall carefully be opened to full width as directed by the Engineerin charge Asphalt,
popada's spouls, metals etc shall be separately deposited in suchplaces as may be determined by
the Engineer-in-charge. In case above materials notbeing so deposited or being mixed up with the
excavated materials will not be allowed
forrefilling.Thecostofmaterialsshallbechargedfromthecontractor.Thedecisionofthe
C.E.shallbefinalandbindingtothecontractor.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:Therate shallbefora unitofSmtBasis.
ItemNo. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
4 layers not exceeding 20 cm. in depth consolidation each deposited layer by ramming and watering.
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyancecharge of earth ,lime,murrum, building rubbish, manual garbage,sludge
5 ,excavatedrock,flyash,aggregateofanykindetc.comp.Upto5.0Km.lead
Allthe surplusearthetc.shallbecarriedawayimmediatelyfromthesiteofworktoaplacewithin
5km.distanceorasdirectedandorderedbytheEngineer,soasnottocauseanyinconvenience to the public traffic
finding which in view of public safety and traffic convenience.The Corporation shall carry out the work by
any other agency at the contractor’s risk and cost. iftheinstructions arenotcomplied within7daysfrom
thedateoforder tocart the surplusmaterials and clear the site, the said work shall be carried out by the
Municipal Corporation attherisk
andcostofthecontractorandnoclaimordisputeshallbeentertainedinthisrespect.
If the filling in trenches after settlement of the earth filling in trenches is to be done andthe
sameshall becarriedoutby thecontractorwithout asking any extra rate. The contractorshall have to cart the
surplus earth after the trenches we will watered and refilled with the sand.The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, ifnecessarytoclearthe roadsurface.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling, transportingpipes to
work site, unloading lowering in trnch such as cementsand, hemp bitumen
asdirected,incl.wateringthetrenchesspreadingandcartingawayofsurplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement jointsin C.M.1:1
proportion in proper position , grade and alignment at all level as directed byEngineer-in- charge
including conveyance from stone to site of work, Jointing materialetc.comp.
A)…………do…….(b)10 cm dia lineB)………do
C)……………do….(c)23cmdialine
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved qualitymake and
shall be brought on site after approval. (The pipes shall be laid in grade as perinstruction.)Contractorshall
havetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarndipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to thecontractor for testing pipes
and jointing. No trenches shall be filled without the approval of theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on theplan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.The sewer excavation
shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the completed
sewer only when directed by the engineer in charge looking to the progress ofthe work in obtaining the
formation of the bottom of the trenches the usual methods of using signrails and boning roads shall be
adopted during the whole of the process. The centre line ofuniform height shall be carried clearly on each
rail. The depth of the excavation and invert of thesewer shall be checked by means of boning road of
approved length and also by straight edge.The bed of the trench shall be well rammed before starting laying
of sewer lines and cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by suitabletimbering of
shorting work looking to the nature of the soil near big or important structure, thesides of the trenches shall
be closely and securely timbered, if any settlement of the buildings inanticipated the timbering shall be left in
the ground. The various materials excavated shall beseparately stacked so that in refilling that may be
relayed on the same order as before and leastpossible damage shall be done carpet on the public roads and
private properties. Surfacecovering consisting of asphalt carpet shall be kept on side and preserved for
reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused unnecessary
obstructionalong the trenches during inspection trenches etc. shall be tunneled under only as necessary.The
side of the trenches shall be nearly vertical and plumb and red light shall be placed at eachend at intervals
and instructions and further protected by rope fence. Necessary caution boardsshallalsobe
createdandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave to be taken
in refilling the trenches so that no damage may be done no sewer, no lumpshall be allowed to be put around
the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The measurementsof the work
shall be exact length and width of the trenches as specified or as per City Engineerinstruction and depth
shall be measured vertical as per section up to invert or the pipeline. TheCity Engineer reserves the right of
extra excavation on either side if considers necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all directedbefore any
concrete is in dia. In case the excavation is done deeper than required no filling shallbe allowed to bring the
formation to proper level but contractor shall have to lay cement or
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost so as to
come to proper formation. In case bad formations are met with the work shall haveto be done as per
instruction of City Engineer. Necessary arrangements for watering trenchesmust be provided by contractor
and without proper watering trenches will not be allowed to befiled to further Contractor shall have to make
arrangement for access to invert of the sewer andfor inspection of the work as ordered by the engineer. If it
is required to shift or after thealignment section of diameter of the pipe the contractor shall carry out the
altered work at therates quoted by him for the original work for items and contractor shall not claim any
expensesduetothe changesmade.
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework must be
executed vigorous day night without interruption when so ordered by the engineer.All existing water pipe
storm drains sewer line railway track, electric cables etc. which do not inthe opinion of engineer required to
be changed in location shall be supported and protected frominjury by the contractor. The contractor shall be
liable to pay all damages to water-pipe, drainselectric and telephone cable and to private property during the
execution of this contract and thesame will be recovered from the running bills or the deposit of work change
location of anyexisting sewers drains etc. not otherwise from in these specification the contractor shall do
thework of making such change and the work shall be paid for as extra work. All places utility etc.shallbekept
accessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than theinside diameter
of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor. Wherever
natural soil demands winder excavation the mentioned above the same shall begiven after approval of City
Engineer. The rate for excavation for easy jointing and caulkingnothing extra shall be paid for this. Refilling
of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches arecompletely
refilled. Temping and ramming with rammers shall have to be done at all place ofimportant work where
ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo watering
satisfactory corporation shall get it done at the risk and cost of the contractor with orwithout giving any notice
and the expenses incurred in doing so recovered from the contractoreitherincost
orfromhispaymentthroughbills.
Therateshallbepermeterbasis.
TherateperCmt.inthisitemshallbepaidextraadditiontotherateforexcavation
ItemNo. ProvidingandsupplyingISIStandardRCCpipes(ofsulphateresistingCement)instandardlengths
7 offollowing class anddiametersuitable for rubber ringjoints (socketand spigot) including all
taxes,insurance, transportation,treight charges,octroi,inspectioncharges, loading,unloading,
conveyance to departmental stores, stacking etc. completeClassNP3Testpressure0.7Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in properposition
grade and alignment at all level as directed by Engineer-in- charge
includingconveyancefromstonetositeofwork,labourgivinghydraulictestingasperISIcode.
(a)300mminternaldiameterB)450Mm Internal
Diameter(C)500MmInternalDiameter,(D)600MmInternal
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class workmanship
as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The proportion of concrete shall be
one part of cement to 2 parts sand and 4 parts of blacktrap agg. mix. of suitable size to as to produce uniform
concrete through out thicknessof thepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar shall be
sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially preparedformation or
on concrete bed and for the purpose to extra rate shall be given making extraexcavation
forbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in thelength. For each
joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop. 1:1 shall be
forced into joints and chaucked completely by means of special cutting toolsuntil the whole space is full. The
mortar shall be sprayed around the collar joints so as tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and ifhe has any
doubt as to their soundness be may required the contractors to cut open and clearaway the cement of any
joint that he may select and to make good the same at their expensesprovided that, unless some defect be
found, they shall be required to open more than one jointsin 18mt (60’) of pipe, though if defect be found the
Engineer direct them to open as many jointsas he may deem necessary, the joints made one day will not as a
rule, be inspected until thefollowingdayandthe cementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using bestmaterials first class
workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line ofNP3class.
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofsuitablesize
soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of thecollar shall be
sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on speciallyprepared
formation and for the purpose no extra rate shall be given for claming such hollows
inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoff intheformof filleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly togradient.
M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactoryworking of the
same for 12months after it is put into commission, contractor must satisfy
IS458/1971andIS783/1959withreferencetoRCCpipe.
ItemNo.8 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) forfoundation,
C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of chamberseatcoveretc..completed.
(A) 0.60X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60X0.75mt.sizeInsideClear,Depthfrom0.0to0.90meterforpipedia<=20mm.
(C) 0.75x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissufficentlycoa
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface. The
surface must be kept damp during and after consolidation & inlaying consecutive layer the lower coars
should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand book
No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin chargebefore
theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement mortar for
the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water is required to be
ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan working to
the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement mortar
shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for sand and
cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the site as not
to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like manner with
joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.Therateincludesallnecessarymaterualsmixinglayingandremainandwateringtheexposed
facestobefinishedwithneatcementasperinstructionthechannelshallbehalfroundandas
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in uniform
thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi cations for )plaster
no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains, Bends
and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The maximum distance
between inspection chambers shall beabout 25 meters. Where the diameter of sewer/drain is increased, the
soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimuminternals
izesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The channel
shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the horizontal diameter,
the sides shall be extended vertically to the same level as thecrown of the outgoing pipe and the top edge shall
be suitable rounded off. The branch channelsshall also be similarly constructed with respect to the benching out
at their junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in the main
channel shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr in
depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be 450 mm
below the manhole/ inspection chamber cover and the lowest not more than300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of castiron of specified weight and shall conform to the
requirements given in IS:1726. The covers andframes shall be cleanly cast and they shall be free from air and
sand holes and from clod shuts.They shall be neatly dressed and carefully trimmed. All castings shall be free
from voids whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe
top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and water
tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The coating
shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly embeded to
correct alignment and level in cement concrete on thetop of the masonry. The item shall be executed as per the
detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineerincha
rgeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling, Brick Bats
No.9 Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm 1:3, Finishing
With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 CmC/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15C.M.,Including Cantering & Reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mmdia.)But Excluding The Cost Of Manhole Seat Cover
Etc..Completed Of Size 0.75 X 1.00Meter(InsideClear, M.H. lengthshouldbeparalleltotheflow)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia <=300mm)
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcomplywithspecificati
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesandsizefrom
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissufficentlycoate
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface. The
surface must be kept damp during and after consolidation & inlaying consecutive layer the lower coars
should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand book No.2
The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin chargebefore
theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement mortar for
the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water is required to be
ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan working to
the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement mortar
shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for sand and
cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the site as not to
obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like manner with joints
plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate includes
all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished with neat cement
as per instruction the channel shall be half round and asper drawing & instruction of Engineer in charge. proper
bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in uniform
thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi cations for )plaster
no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains, Bends
and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The maximum distance
between inspection chambers shall beabout 25 meters. Where the diameter of sewer/drain is increased, the
soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimuminternals
izesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The channel
shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the horizontal diameter,
the sides shall be extended vertically to the same level as thecrown of the outgoing pipe and the top edge shall
be suitable rounded off. The branch channelsshall also be similarly constructed with respect to the benching out
at their junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in the main
channel shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr in
depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300mmabove
thebenching. Themanhole/inspectionchamberframeand covershallbeofcast iron of specified weight and shall
conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts.They shall be neatly dressed and carefully trimmed. All castings shall
be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top surface to
provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and water
tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The coating
shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly embeded to
correct alignment and level in cement concrete on thetop of the masonry. The item shall be executed as per the
detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineerinchar
georAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
ItemN RatereductionoveritemofConstructingSlabTypeM.H.Chamberofsize1.00x0.75mtforconstructingslab@depth
o.10 morethan0.60mtbelowGroundLevel(Max.3unit\ofDM
shouldbereducedinthisitem)(AsPerR.A.BasedonBuildingSOR2015-16)
ItemN Constructing Slab type M.H. Chamber of the following size including excavation, refilling,brick bats
o.11 cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness10 C.M., finished 15 mm
thick cement plaster inside & outside (Only for shaft) in CM 1:3,finishing with cement slurry, P/F 4 mm dia
M.S.Steel HDPE coated steps 35 cm c/c at 35cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., includingCantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.)
but excludingthecostofManholeseatcoveretc..completed.ofSize1.00X1.40meter(InsideClear,
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Excavation:Thisbed
oneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissufficentlycoated
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in thickness
and be well and quickly rammend with heavy rammers, until mortarcreams up to surface. The surface must
be kept damp during and after consolidation & inlaying consecutive layer the lower coars should be well
watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand book No.2
The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin chargebefore
theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement mortar for
the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water is required to be
ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan working to the
proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement mortar
shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould be
constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral specification No.45
P.W.D hand book. The face work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts of sand
4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate includes
all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished with neat cement
as per instruction the channel shall be half round and asper drawing & instruction of Engineer in charge. proper
bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in uniform
thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi cations for )plaster
no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains, Bends and
junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The maximum distance
between inspection chambers shall beabout 25 meters. Where the diameter of sewer/drain is increased, the soffit
of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimuminternalsi
zesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection chambershall
be constructed as perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The channel shall
be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the horizontal diameter, the
sides shall be extended vertically to the same level as thecrown of the outgoing pipe and the top edge shall be
suitable rounded off. The branch channelsshall also be similarly constructed with respect to the benching out at
their junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in the main
channel shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr in
depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be 450 mm
below the manhole/ inspection chamber cover and the lowest not more than300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of castiron of specified weight and shall conform to the
requirements given in IS:1726. The covers andframes shall be cleanly cast and they shall be free from air and
sand holes and from clod shuts.They shall be neatly dressed and carefully trimmed. All castings shall be free from
voids whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and water
tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The coating
shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly embeded to
correct alignment and level in cement concrete on thetop of the masonry. The item shall be executed as per the
detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineerincharg
eorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
ItemN ExtrarateoveritemofConstructingSlabTypeM.H.Chamberoffollowingsizeforconstructing M.H. Chamber, per
o.12 1.00 Decimetre of additional depth or part thereof.
etc.complete.Ofsize1.00x1.40mt.(insideclear)andDepthfrom
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
ItemN Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mtfor constructing
o.13 slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt
for(MHabove3.0mtdepth)belowGroundLevel(Max.5unitof DMshouldbereducedinthis
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
ItemN Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manholeof following size
o.14 incl. excavation, refilling and & finished 15 mm thick cement plasterinside in CM 1:3, P/F 4 mm dia
M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggeredinmasonryCM1:5,incl.costofRCCSlabinCC1:1.5:3,includingCantering&reinforcement as directed
by engineer in charge. Rate includes carting of debris andexcavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Singlejalliat15C.M.
c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Singlejalli at 15 C.M.
c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slabatbelow 1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt. FromG.L.)
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM & reinforcement(double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt. FromG.L.)
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissufficentlycoated
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in thickness
and be well and quickly rammend with heavy rammers, until mortarcreams up to surface. The surface must
be kept damp during and after consolidation & inlaying consecutive layer the lower coars should be well
watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand book No.2
The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin chargebefore
theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement mortar for
the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water is required to be
ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan working to the
proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement mortar
shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for sand and
cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the site as not to
obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like manner with joints
plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts of sand
4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe
finished with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in uniform
thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi cations for
)plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains, Bends
and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The maximum
distance between inspection chambers shall beabout 25 meters. Where the diameter of sewer/drain is
increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumintern
alsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The channel
shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the horizontal
diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing pipe and the top
edge shall be suitable rounded off. The branch channelsshall also be similarly constructed with respect to the
benching out at their junction with the mainchannel as appropriate fall suitable rounded off in the direction of
flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr in
depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be 450 mm
below the manhole/ inspection chamber cover and the lowest not more than300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of castiron of specified weight and shall conform to the
requirements given in IS:1726. The covers andframes shall be cleanly cast and they shall be free from air and
sand holes and from clod shuts.They shall be neatly dressed and carefully trimmed. All castings shall be free
from voids whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe
top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and water
tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The coating
shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly embeded to
correct alignment and level in cement concrete on thetop of the masonry. The item shall be executed as per
the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Modeofmeasureme
Therateshallbeforaunit ofonenumberbasis.
ItemNo. Provdg.&layingS.W.Gullytrapwithbrickmasonry chamber &
16 watertightG.T.StoneincludingfixingofcoverSquaremouthtrap100mmx100mmsizeP-Trap
ConstructingGullyTrapChamberWithMasonryInCementMortar1:5&PlasteringInCementMortar1:3UsingG.T.S
toneIncl.FixingCoverEtc.CompletedAsDirected.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Making connection to the ex. M.H.in running sewer incl. Dewatering and otherrequired machinery etc.
15 of following dia pipes at any convenient time. All damaged workshallbewellrepaired
asperinstructions. etc..complete.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in less. All
damaged work shall be well repaired as per instruction of officer in charge.Proposed R.C. C. line should be
connected with the existing M.H. as directed. Holes made inthe well of existing M.H. should be finished
smooth and in circular shape as directed. Rate alsoincludes making new channel or repairing existing
damaged channel if instructed. Rate isinclusiveofwateringetc.as directed.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in
16 runningsewerincludingcuttingbars,includingremoving debris /silt from the M.H. and carting at a
suitabledistance etc..complete as directed. No payment for M.H. work will be made until pipe
isnotcutcompletelyinall respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshall bewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars shall also
have to be cut in existing manhole as per requirement and making good thesame. the dis mental materials
shall be carried ti placesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshall beforaunitofNosBasis
tem Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in
No.17/ C.M.1:5andplasterinC.M.1:3andfixingC.I.stepsandM.H.andcartingthesameasdirected.A)………………do
B) ………………do ....................... Upto0.35mt.(@Fourcoarse)
C)………………do…………………Upto0.65mt.(@Sevencoarse)D)………………do
Upto0.90 mt.(@TenCoarse)
RepairingdamagedI.C./Raisinremovingdamagedbrickworkandrepairingbybrickmasonry in C.M. 1:5
and plasterinC.M.1:3andfixingC.I. steps and existingchamber sheet cover,removing the debris
from chamber andcartingthesameasdirected.
Required level shall be achieved in brick work as specified including plaster, the thickness ofjoints shall not
exceed 10 mm (3/9”). In no case the frame shall be supported by chips or brokenbrickorasphaltmix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface ofan asphalt
road/concrete pavement. The frame shall be bedded in cement mortar on the brickworkwithsplayedfillerall
Water:Gullyframesbeingontheedgeofroadshallbefixedtothecorrectroadlevelatitsupperendandtheslopeshouldbe
suchitmustbeabout(12mm)(1/2”)lowerthanwatertable.
A concrete pavement should be case around the frames and covers of man-holes,chambersetc.
incaseof asphlaticroad.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) asspecified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edgeof the circular frame no
pavement will be made of this pavement under the item of cementconcrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) inexternal
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the
longerdimensionbeingalongthedirectionofthemain.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C.No payment
will be made for the pavement should be at least 8 cm (3”) wider than the outermostedgeoftheframe.
After removing the top portion of the manholes, the proper brick masonry layer with c.m.(1:4) should
be constructed for proper bondage with old masonry and 8 cms thick PCC work(1:2:4) should be laid on the
top of brick layer an up to the bottom of the seat. After fixing
theseatthemanholeshouldbeproperlyleveledwithroadlevel.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall
becleanwithin48hoursofconcretingday.
M/SshallbegivenonNobasis.
ItemNo. Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
19 1) HeavyDuty
FrameSuitablefor50CmopeningofMHCoverSuitablefor
50CmOpeningOfMH
FrameSuitablefor50CmopeningofMHCoverSuitablefor
50CmOpeningOfMH
3) HouseconnectionChamberLightDutyFrame
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to matchexisisting road
20 level in C.C. 1:2:4andfinishing smooth, watering and protectingfor 7days etc. complete as directed.
M.H. seat cover will be supplied byA.M.C.(from anystore)
Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to matchexisisting road
level in C.C. 1:2:4 and finishing smooth, watering and protectingfor 7 days
etc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. ProvidingKachhaOfPakkaDummyIn The Following Dia Pipes And Removing
21 TheSameAfterTheConnectionOfTheWorkAs Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the sameafter the
connecting of the work as per instruction of engineer in charge. If kachcha or pakkadummy is not removed by
the contractor then the penalty shall be laid as per municipal rules orderived
bythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequiredthickness and size
22 including placing the nece. supports of reqd. size, nailing, fixing withmortar, levelling. All specification
for dead centring as per standard engg. practice etc.comp. asdirected..
ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequired thickness and size
including placing the nece. supports of reqd. size, nailing, fixing withmortar, levelling. All specification for dead
centring as per standard engg. practice etc. comp. asdirected.
Therateshallbefor aunit ofSmtBasis
ItemNo. Supplying,labourforbreakdownrepairingworkforactivitieslikeexcavation,disliting,removingdebrisfromtre
23 nchbackfillingetc.comp.asdirectedbyEng.incharge.
1) Mazdooratday/Night
2) Makadam/supervisionatday/NightModeofmeasur
ement: TherateshallbeforaunitofNoBasis.
ItemNo. Barricading theentirebreakdownorexcavatedareaon rentalbasisusingwoodenballies
24 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion & movement including cautionaryboard etc. Item also includes
for making temporary sufficient nos of lighting arrangementthrough out the work with necessary
required arrangement. ..The same shall be removedaftercompletion ofwork.
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Fabricating, supply and erecting in position Standard Structural steel sections conforming to IS
25 for railing , skywalk, stair, or other works using ISMB, ISA, ISMC, MS plate, flat, square bars, pipe,
square pipe, rectangular sections, square section, tube, etc. including welding, cutting, wastage, etc.
complete. The rate is inclusive of welding rod, supply & fixing of correct size nut, bolts, washers,
including one primer coat of red lead paint conforming IS:102 Zinc chromate paint conforming to IS:104
followed by two coat of aluminium paint as per IS:2339 OR enamel paint of color as selected by
engineer incharge, with all contractor's materials, labour, tools & plants, in bolted/welded construction
as directed by Engineer-in Charge. The waste cut pieces shall not be included in the paying quantity.
The work shall be done as per drawing and specification. The work shall be carried out as per IS:800,
ItemNo. Providing TMT Bar FE415 reinforcement for R.C.C. work including bending, binding and placing in
26 position complete upto floor two level (upto 10 ton)
Therateshallbeforaunitof KG Basis.
ItemNo. Brickworkusingcommonburntclaybuildingbrickshavingcrushingstrengthnotlessthan35kg/Sq.cm.inceme
27 ntmortar1:5(1cement:5finesand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6.Brickshall
conformtoM-15Cementmortarshall conformtoM-11.
Theproportionofthecementmortarshallbe1:6(1cement:5finesand)byvolume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean waterfor about two
hours before use or as directed. The cessation of bubbles, when the bricks
arewettedwithwaterisanindicationofthroughwettingof bricks.
BricksshallbelaidinEnglishbondunlessdirectedotherwise.Halforcutbricksshallnotbeusedexcept when necessary
to complete to bond; closer in such case shall be cut to required sizeandusedneartheendsofwalls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brickshall first be
properly bedded and set home by gently tapping with handle of trowel or
woodenmallet.Itsidefaceshallbeflushedwithmortarbeforethenextbrickislaidandpressedagainst
it.Oncopletionofcourse,theverticaljointsshallbefullyfilledformthetopwithmortar.
Thewallsshallbetakenuptrulyinplumb.Allcoursesshallbelaidtrulyhorizontalandallverticaljoint shall be truly
vertical. Vertical joints in alternate course shall generally be directly one overtheother.Thethicknessof
brickcourseshallbekeptuniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges,mason’s sprit
level, square half meter rub, and pins, string and plumb shall be kept on the site ofworkforfrequent
checkingduringtheprogressofwork.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
theconnectedbrickworkshallbekeptnotmorethanonemeterovertherestofthework.Wherethisis not possible, the
work shall be raked back according to bond (and not left toothed) at an anglenot steeperthan45degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to
bebuiltinwallshallbeembeddedincement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall notexceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during theprogress of work, when the mortar is
still green so as to provide key for plaster or pointing todone.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortardroppingremoved.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all thefaces for a period
seven days. The top of masonry work shall be kept well wetted at the close oftheday
Preparationoffoundationbed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared ofall loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid onconcrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtainthe engineer'’ approval for the foundation
bed, before foundation masonry is started. Whenpuccas flooring is to be provided flush with the top to plinth,
the inside plinth offset shall be keptlowerthantheoutsideplinthtopbythethicknessoftheflooring.
Modeofmeasurementsandpayment:
Themeasurementsofthisitemshallbetakenforthebrick masonryfullycompletedinfoundationuptoplinth.
Thelimitingdimensionsnotexceedingthoseshownontheplansorasdirectedshallbefinal.Battered, tapered
andcurvedportionsshallbemeasurednet.
No deduction shall be made from the quantity of brick work nor any extra payment made forembedding in
masonryormakingholesinrespectoffollowing items:
Endsofjoints,beams,posts,girders,rafters,purlins,trusses,corbelstepsetc.wherecrosssectionalareadoesnotexcee
Openingnotexceeding1000Sq.cm.
Wallplatesandbedplates,bearingofslabs,chhajasanthelikewhosethicknessdoesnotexceed10Cms.and
thebearingdoesnotextendto thefullthicknessofwall.
Drainageholes,andrecessesforcementconcreteblockstoembedholdfastsfordoors,windowsetc.
Ironfixtures,pipesupto300mmdiaholdfastsanddoorsandwindowsbuiltintomasonryandpipesetc.forconcealedwiring
Formingchasesofsectionnotexceeding350Sq.Cm.inmasonry.
Aperturesforfireplacesshallnotbedeductednorshallextralabourrequiredtomakesplayingofjambs,throatingandmaki
ngArchesovertheaperturebepaidforseparately.
Therateshallbeforaunit ofonecubicmeter.
ItemNo. Providing15mmthickcementplasterinsinglecoatonRough(Similar)sideofsingleorhalfbrickwallsforinterior
28 plasteringuptofloortwolevelandfinishedevenandsmoothin
(i)Cementmortar1:3(1-cement:3-sand)finishingwithafloatingcoatofneatcementslurry.
WaterM-1.TheCementmortarofproportion1:3shallconformtoM-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound.These shall be
properly examined before erection and use Stage scaffolding shall be providedforceilingplaster, whichshall
beindependent ofthewalls.
Preparationofback-ground:
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescenceand other
foreign matter by water or by brushing. Smooth surface shall be roughened by wirebrushing if it is not hard and
by racking if it is hard. In case of concrete surface, if a chemicalretarder has been applied to the form work, the
surface shall be roughened by wire brushing andall the resulting dust and loose particles cleaned off and care
shall be taken that none of
theretarderisleftonthesurface.Trimmingofprojectionsonbrick/concretesurfacewherenecessaryshallbecarried
outtogetanevensurface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for
sufficientperiodbeforecarryingout theplasterwork.
The work shall not be soaked but only damped evenly before applying the plaster. If the
surfacebecomesdrysuchareashallbemoistenedagain.
Forexternalplaster,theplasteringoperationshallbestartedfromtopfloorandcarrieddownwards. For internal plaster,
the plastering operations may be started wherever the buildingframe and cladding work are ready and the
temporary supporting ceiling resting on the wall
ofthefloorhavebeenremoved,Ceilingplastershallbecompletedbeforestartingplastertowalls.
ApplicationsofPlaster:
Theplasterabout15x15cms.Shallbefirstappliedhorizontallyandverticallyat notmorethan2metre intervals over the
entire surface to serve as gauge. The surfaces of these gauges shall betruly inplane of the finished plastered
surface. The mortar shall then be applied in uniformsurface slightly more than the specified thickness, then
brought to a true surface by working
awoodenstraightedgereachingacrossthegaugeswithsmallupwardandsidewaysmovementata time. Finally, the
surface shall be finished off true with a trowel or wooden float according as asmooth or a sandy granular
texture is required. Excessive trowelling or overworking the floatshall be avoided. All corners, arrises, angles
and junctions be truly vertical or horizontal as thecase may be and shall be carefully finished. Rounding or
chamfering corners, arrises junctionsetc.shallbe carriedoutwithpropertemplatestothesizerequired.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plasterwhich
ispartiallysetshallberejectedandremovedforthwithfromthe site:
In suspending the work at the end of the day, the plaster shall be left out clean to the line bothhorizontally and
vertically. When recommending the plaster, the edges of the old work shall bescraped clean and wetted with
cement putty before plaster is applied to the adjacent area toenable the two to properly joint together.
Plastering work shall be closed at the end of the day onthe body of the wall and nearer than 15 cm. To any
corners or arrises. Horizontal joints
inplasterworkshallnotalsooccuronparapettopsandcopingsastheseinvariablyleadtoleakage.Noportionofthesurfac
eshallbeleftoutinitiallytobepackeduplateron.
Eachcoatshallbekeptdamcontinuously tillthenextcoatisappliedorforaminimumperiodof7 days. Moistening shall
commence as soon as plaster is hardened sufficiently. Soaking of wallsshall be avoided and only as much
water as can be readily absorbed shall be used excessiveevaporation onthesunny orwindwardsideofbuildingin
hot airordry weather shall beprevented by handling mattings or gunny bags on the outside of the plaster and
keeping themwet.
Modeofmeasurement&payment:
The rate shall include the cost of all materials, labour and scaffolding etc, involved in
theoperationsdescribedunderworkmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth orheight
shallbemeasuredcorrecttoacentimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open jointsin brick work,
stone work etc. or space between laths. Thickness of plaster shall be averagethicknesswithminimum
10mm.atanypointonthissurface.
Thisitemincludesplasteringuptofloortwolevel.
The measurement of wall plastering shall be taken between the walls or partition (dimensionsbefore plastering
being taken) for length and from the top of floor or skirting to ceiling for height.Depthof coverof cornicesif
anyshallbededucted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measuredseparately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,beams, posts,
girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openingsexceeding 0.5 sq.mt. and not
exceeding 3.0 sq. mt. in each area deductions and additions shallbemadeinthefollowingmanner:
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5sq. mt. each
and no addition shall be madefor reveals, jambs, soffits, sills etc. of these openingforfinishtoplasteraround
endsof joints,beams,postsetc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made
asfollowsandnoadditionshallbemadeforreveals,jambs,soffitsetc.sillsetc.oftheseopenings.
When both faces of all wall are plastered with same plaster,
deductionshallbemadeforonefaceonly.
When two faces of wall are plastered with different types of plasters or ifone faces is
plastered and the other pointed, deductions shall be made from the plaster orpointing on the side of frame for
door, window etc. on which width or reveals is less than that
ontheothersidebutnodeductionsshallbemadeontheotherside.Wherewidthofrevealsonbothfaces of all are equal,
deductions of 50% of area of opening on each face shall be made fromareaof plasterand/orpointingasthecase
For openings having door frames equal to projecting beyond the thickness of wall, full
deductionforopeningshallbemadefrom eachplastered faceofthewall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening butjambs,
soffitsandsillsshallbemeasured.
The rate shall be for a unit of one sq.
metre.finishingwithafloatingcoatofnetcementslurry.Materials
Thisworkisonlyofprovidingsmoothcementfinishwithfloatingcoatofneatcementslurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be appliedto the
plastered surface with a trowel to provide uniform texture while the base coast is stillplastic.
In any continuous face of wall the finishing treatment should be carried out continuously and
daytodaybrakedmadetocoincidewitharchitecturalbreaksinordertoavoidunsightlyjunctions.
Curing:Alltheplasterworkshallbekeptdampcontinuouslyforaperiodof7days.
Modeofmeasurements&payment:
Thepaymentshallbemadeforaunit of 1.0sq. mt. ofworkdone overandabovethe finishingofworkof base coat.
Therelevantspecificationsofitemofbasecoatshallbefollowedformeasurements andpayment.
Therateshallbeforaunit ofonesq.metre.
ItemNo. Reinstatement of Asphalt road using the same material.
Therateshallbeforaunit ofonesq.metre.
ItemNo. Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft and cutt off walls
30 including necessary shuttering laying, vibrating, ramming and curing complete.(B) Walls, fom top of
foundation level upto floor two level.
Therateshallbeforaunit ofone Cu.metre
ItemNo. Labour charger for lowering existing Ventilating column safely with the help of required capacity of
31 hydra crane or any type of required capacity of crane. Item also includes welding machine , gas cutter
electric cutter , breaker etc necessary machineries required for this work with out damage and item
also includes carting the same to the AMC store. etc. comp as directed.
Therateshallbeforaunit ofone Nos.
ItemNo. ConstructingBombayPatternTypeCatchPitofsize0.60x0.60depthupto 1mtincludingexcavation, B.B.C.C.
32 (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with40 mm thick IPS flooring in the
propM15 at bottom and 15 mm thick cement plasterinsidethecatchpitinthe
proportionofCM(1:3)withoutjalietc.comp.asdirected.
Catchpit shall be provided at every change of alignment, gradient or diameter
ofstormwaterdrains,Bendsandjunctionsinthesewer/drainshallbegroupedtogetherinchamberas far as possoble.
The maximum distance between inspection chambers shall be about
25meters.Wherethediameterofsewer/drainisincreased,thesoffitofthepipeshallbefixedatthesame level and
necessary slope given to the channel of manhole/inspection chamber. Theminimum internal sizes of
manhole/inspection chamber shall be as per the respective item
ofwork.Themanhole/inspectionchambershallbeconstructedasperthedetaileddrawingsandasdirected by
Engineer. The bed concrete and the brick masonry shall be constructed of suchthickness as shown on
drawing. The brick masonry shall be constructed in C.M. (1:5), plasteredon both faces with 15 mm cement
plaster in C.M. (1:3). The channel shall be semicircular in thebottom half and of diameter equal to the
sewer/drain. Above the horizontal diameter, the sidesshall be extended vertically to the same level as the
crown of the outgoing pipe and the top
edgeshallbesuitableroundedoff.Thebranchchannelsshallalsobesimilarlyconstructedwith
Respecttothebenchingoutattheirjunctionwiththemainchannelasappropriatefallsuitable
rounded off in the direction of flow in the main channel shall be given. The channel at the bottomof
manhole/inspection chamber shall be plastered with C.M. (1:3) and finished smooth. Rungsshall be provided
in all manholes/inspection chambers over 0.6 mtr in depth and shall be of castiron conforming to IS:5455.
These rungs shall be fixed staggered in two vertical runs,
mmaparthorizontallyand300mmc/cvertically.Thetoprungshallbe450mmbelowthemanhole/inspection chamber
cover and the lowest not more than 300 mm above the benching.The manhole/inspection chamber framing
and cover shall be of cast iron of specified weight andshall conform to the requirements given in IS:1726. The
covers and frames shall be cleanly castand they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressedand carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gasinclusion or other causes.Covers shall have a raised chequered design on the top surface
toprovide an adequered nonslip grip. Cover shall be capable of easy opening and closing and itshall be fitted
in the frame in workmanship like manner. The cover shall be gas tight and watertight. The size of covers
specified shall be considered as the clear internal dimensions of theframe.Coversand framesshall be coated
with a blackbituminous composition. The coatingshall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmlyembeded to correct alignment and level in cement concrete
on the top of the masonry. The itemshallbeexecutedasperthedetailed drawingandasdirectedbyEngineer
Modeofmeasurements&payment:Therate shallbeforaunitofNos
ItemNo. CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc.
33 comp.. As directed by engineer in charge.
Modeofmeasurements&payment:Therate shallbeforaunitof Nos
ItemNo. Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following dia. Including
34 fittings of standard make as approved by Engineer-in-charge.
Mode of measurements&payment:Therate shallbeforaunitof Rmt
ItemNo. Providing, supplying & fixing to wall ceiling and floor 6.0 kg. F/Cm2 working pressure polythelene
35 pipes of the following outside dia. Low density. Complete with special flange empression type fittings.
Wall clips etc. incl. making good the wall ceilling and floor
Mode of measurements&payment:Therate shallbeforaunitof Rmt
ItemNo. Providing and operation dewatering Pump including fuel charges & operator Charges etc.asdirected
36 etc.comp. (ShiftforEightHour)(ForEachPumpSet)
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost oftoand fro
37 transportation, laying of the delivery hoses as required, lowering and liftingthe pumps as and when
required etc. complete. Set Do As Directed. (No paymentshouldbeallowedfornonworking
conditionofmachinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofHP/Hr.
ItemNo. Hiring and operatingthe 20 KV 3 Phase Electric Generator foroperatingdesiltingmachinery,andlighting
38 and other requirements with Arranging diesel to run the
D.G.SetDoAsDirected.8HrsShift.(Nopaymentshouldbeallowedfornon workingconditionofmachinery )
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation andbreak down
39 type work & also during unavoidable condition as per instructionof
engg.incharge,rateincludesallnece.shifting,fueland operatingcharges andstackingof useful & non-
useful materials separately up to store. (No payment shouldbe allowed for non working condition of
machinery and for pipelineexcavation andlayingwork)
The item is for supplying JCB on rent for various construction activities The rate includes variousoperational
cost such asoperating generater/electricity diesel,petrol, operater's salary, etccomp.
when machine is in working condition all precautions shall be taken by contractor to avoid theaccident.if any
accident occurs contractor shall be fully resonsible for that. the payment shall begiven on hour basis.No
payment shall be given for idle hour and no time shall be counted forcarrying
machinetositeandfromshiftingsitetosite.
Thepaymentshallbegivenon hour basis.
ItemNo. SupplyingElectricBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing Operator, fuel,
40 power Supply etc. Complete as Directed. (No payment should beallowed for non working condition of
machinery and for pipe line excavation and M.H.work.Allowed onlyforbreak downwork)
Modeofmeasurements&payment:Therateshallbefor aunitof Hr.
ItemNo. Providing & Supplying Hitachi Machine-110 capacity on rental basis in case of emergency situation and
41 break down type work & also during unavoidable condition as per instruction of engg. in charge, rate
includes all nece. shifting, fuel and operating charges . (No payment should be allowed for non
working condition of machinery)
Modeofmeasurements&payment:Therateshallbefor aunitof Hr
ItemNo. Providing & Supplying Hitachi Machine-200 capacity on rental basis in case of emergency situation
42 and break down type work & also during unavoidable condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating charges. (No payment should be allowed for non
working condition of machinery)
Modeofmeasurements&payment:Therateshallbefor aunitof Hr
ItemNo. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case of emergency
43 situation and break down type work & also during unavoidable condition as per instruction of engg. in
charge, rate includes all nece. shifting, fuel and operating charges. (No payment should be allowed for
non working condition of machinery)
Modeofmeasurements&payment:Therateshallbefor aunitofShift
Conctractor's Signature Addl.City Engineer
Address & Mobile no. ( North Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance
with the term and conditions of tender for the work of Laying New Drainage line and
upgradation work and Repairing Chamber/MH in parihar nagar, shyamnagar
,Vidyanagar and Diff.Chawls Regarding Pollution work in Kubernagar ward in North
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to
pay to Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his
first written demand, without demur without delay and without the necessary of a previous of
judicial or administrative procedures and without the necessity of a previous of judicial or
administrative procedures and without the necessity to prove to the Bank the defects or short
comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect
during the period that would be taken for the acceptance of tender. However unless a demand
of claim under this guarantee is made on its in writing on or before the (Date to be specified
will not be less than 120 days from the stipulated date of receiving the tender) we shall be
discharge from all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .As per
Seal and Signature of the Bidder Addl.City Engineer (N.Z)
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for the Laying New Drainage line and
upgradation work and Repairing Chamber/MH in parihar nagar, shyamnagar
,Vidyanagar and Diff.Chawls Regarding Pollution work in Kubernagar ward in North
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
have agreed to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way
of these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in
Rs. _ __________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as
to ensure and indemnify the AMC for full and proper performance of the contract by
the _______________________________Bank hereby indemnify the AMC for all losses and / or
damages to the road surface which would be laid or resurface by
M/s.________________________ and such PERFORMACE GUARANTEE would include any
damage to hot mixes, dense bituminous macadam asphalt, concrete, seal coat, concrete blocks,
road markings, signage, steel structures which may be suffered by the AMC as a result of
defective production of mixes, because of poor workmanship, or at all, by way of this bond, we
the _________________________________Bank agree and promises that in the eventuality of
the contractors M/s. __________________________________________not repairing or
remeding the Problem, loss or damage to the road surface we shall indemnify and pay the AMC
such expenses, losses and damages that may be incurred by the AMC, as a result of the AMC
getting the work done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to
whether any losses or damages to the project have taken place or not and / or whether the
work suffers from poor workmanship or not will be taken by the Commissioner of AMC and on
the Commissioner's decision regarding such losses or damages or defect whatsoever being so
notified by the AMC to us, We shall immediately take steps and ensure that
M/s.__________________________________ faithfully and diligently carry out the necessary
remedial steps to the full satisfaction of the Commissioner of the AMC. The opinion of the
Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of
arriving at such decision as aforesaid it will be open to the Commissioner of the AMC in case he
so desires, to delegate this power to subordinate like the city Engineer to take appreciate
decision and the decisions referred to above will be deemed to be properly take and as if taken
by the Commissioner of the AMC. In the eventually of M/s.______________ not taking
remedial action to the almost satisfaction of the Commissioner of AMC. The AMC will be
entitled to get the work done itself or from sources. On the Commissioner of the AMC notifying
to us the total expenses incurred for this purpose. We hereby expressly have under taken to
pay the AMC the said amount forth with and in any case not less than 7 days from taken to pay
the AMC the said binding the amount indicted by the Commissioner of the AMC and our
obligation to pay such amount will be continuing of the AMC and our obligation irrespective of
any dispute of differences that may arise between us and M/s.
_____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE is
limited to 5% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of five
years and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such
completion that to us. In case, no such completion it is notified, this performance guarantee will
be a valid from five years from the date of execution of this agreement. The Performance
Guarantee will come into effect from such completion date. In case however, the contract of
several parts it will be opened to the Commissioner to indicate separate completion dates for
separate part and to simultaneously indicate a break up of the contract value equivalent to the
separate part. In which case the PERFORMANCE GUARNATEE to extent of the different
completion dates. It is expressly understood that the considering this period of five years and
one month, the date by which the Corporation, intimate the Bank about the losses, damages or
problems as the case may be, shall be considered as long as such intimation is within a period
of five years and one month from the completion date. We the ___________________ Bank
will be liable, irrespective of whether the remedial actions or lack thereof has taken place after
the period of the five years and one month.
5. We _________________________________ Bank agree that the PERFORMANCE
GUARANTEE which is continuing guarantee will be binding, and enforceable against us
irrespective of any difference / disputes between the AMC and M/s.
and irrespective of any change or variation or execution time or any forbearance or waiver
made or grant by the AMC to M/s.___________________________________.
6. In case any disputes arise as to the interpretation or implementation or implementation of
this PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he
Commissioner of AMC whose decision in the matter will be final. In case any resource to any
court of law is necessitated, the appropriate Civil Court in the Ahmedabad along will have
Date: Signature of Contractor
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
____________________________________________ (here in after called “the Contractor”) of
the other part.
WHEREAS the Employer is desirous that certain works should be executed by the Contractor,
____________________________________________ and has accepted the bid by the
contractor for the execution and completion of such works and the remedying of any defects
therein at a contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in
after mentioned, the Contractor hereby covenants with the Employer to execute and complete
the Works and remedy any defects therein in conformity in all respects with the provisions of
3. The Employer hereby covenants to pay the Contractor in consideration of the execution
and completion of the Works and the remedying of defects therein the Contract Price or such
other sum as may become payable under the provisions of the Contract at the times and in the
manner prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this
Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
GENERAL SPECIFICATION
Name of work Laying New Drainage line and upgradation work and Repairing
Chamber/MH in parihar nagar, shyamnagar ,Vidyanagar and Diff.Chawls Regarding
Pollution work in Kubernagar ward in North zone.(ARC)
The work shall be completed with 12 (Twelve) Months after the order to start the works.
The details of reinforcement of R.C.C. work shall be as per design and instructions of City
Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection
by Municipal Staff. Watering of all the items shall be as per instructions. Mixing of concrete
shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if
required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any when such case
occurs. The contractor shall arrange formed iampasant night and fencing and pagi and shall be
responsible for any damage of life and limb or property if any happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the city Engineer shall
be final. The contractor shall have to give site clean of all rubbish on completion of work and
have over the building with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this rsk and cost.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on
case he shall be allowed to mix the mortar either on floor or any finished surfaces.
The contractor shall have to make his own arrangement for water required for the work and
shall pay the water charges as per water meter.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by C.E. as per the rate analysis based on current
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any
extra and the contractor will have to carry out the works and he will be paid at the rate quoted
by him and no claim for extra for subsequent changes may be entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measures.
The R.C.C. or specified work shall not be done on Sunday and holiday excepting emergency or
when technical requirements are such that continuity of work should be maintained and that to
will be with prior. Permission of the competent authority.
Retetion money at the rate of 2% shall be deducted from every running bill of the contractor
and which will be paid at the time of final bill, for works costing less than Rs. 10-00 lakhs.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various prevision under contract Act. 1970 and
the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the
offer on his own during the period. If any tenderer withdraw or makes any modifications (s) or
addition (s) in the terms and conditions of his tender not acceptable to the Municipal
Corporation the Municipal Corporation shall without prejudice to any right or remedy be at
liberty to forfeit in full the said earnest money absolutely.
As per Circular No. MCR 2176 (96) 2418 (ii) GHH dated 31-03-77 issued by Government of
Gujarat contractors are requested to produce their quarry materials for construction work
through legal sources. i.e. only form the quarry lease holders, permit holder or middle man who
satisfies the contractor as to the legality of the source of purchase by him on these materials.
Contractor has to make his own arrangement for procurement of steel and cement.
i) Conditional tender will not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft or in cash.
iv) Condition of form B1 Standard Specification of material & code of practice will be
applicable. Form B1 & B2 can be is available in website.
Contractor’s Signature Addl.City Engineer
y{ŒtðtŒBÞwr™rË…÷ftu…tuho uþ™
mhœthvxujCJl,œtKtveX,ybœtJtœ-380001.
mkœCo:(1)©b yl uhtusdth htsgbkºte©e - lJe rœÕnelt vrhvºt ¢btkf C-III /011/2(82)2015/HQ
(2)fboathe CrJ»g rl^e mkdXl- lJe rœÕnelt vrhvºt ¢btkf
(3) ©b ylu htusdth rJCtd-dtkDeldh vrhvºt ¢btkf: RveyuV/182016/368596/b(3)
Cth< mhfth©elt ©b ylu htusdth bkºttjg-lJe rœÕne ylu fboathe CrJ»g rlr^ mkdXl
(R.ve.yuV.ytu.) lJerœÕneyu <ublt ylw¢bu <t.07/07/2015 ylu <t.21/06/2016lt vºttu&e
mhftherJCtdtu, mhftherldbtu <ubs htsgle mnfthe mkM&tytu ylu ctuzeytubtk ytWxmtumo&e ftb fh<tk
bnufblu mtbtrsf mwhûttlwk Aºt b¤e hnu <u btxu <ublu ftbœth CrJ»g rlr^ ylu vhawhK studJtRytult
yr^rlgb,1952 nuX¤ ytJhe juJt sKtJuj Au.
yt ylwmk^tlu htsg mhfth©e lt mJuo rJCtdtu, ònuhrldbtu, htsgle mnfthe mkM&tytu,
MJtg< mkM&tytu ylu MJhtsgle mkM&tytubtk ytWxmtumeod yusLmeytu îtht ytWxmtumeod&e ftb fh<t,
ftuLx[tfx fboatheytu,htusbœth <&t mhfth©elt ftb btxu rVfm vdthu hFtgujt <uJt «ðguf fboathe fu
sublu ftuR vK yr^rlgb yk<do< mtbtSf mwhûttlt jtCtu b¤<t l&e <uJt fboatheytulu CrJ»g rlr^
Vt¤tu yaqf fvtg ylu <ublu mtbtrsf mwhûttltu jtC b¤u <u btxu leau bwsclt vdjtk juJt sKtJtguj Au.
1. ftuR vK mkM&t/ yusLme/ ftuLx[tfxhlu ftuR vK mhfthe ftgtuo btxu ftuLx[tfx ytv<t vnujt <uble
vtmu fboathe CrJ»g rlr^ mkdXl yk<do< RMgw &guj «turJzLz Vkz hSMx[uNl Au fu lne <ule
2. Wvhtuf< fuxudhebtk ytJ<t fboatheytulu ftbœth CrJ»g rl^e ylu vhawhK studJtRytult
yr^rlgb,1952 ylu <u ykk<do< DzJtbtk ytJuj gtusltytule studJtRytu jtdw vzu <u btxu
<tðftrjf vdjtk juJt.
3. Wvhtuf< fuxudhebtkk ytJ<t fboatheytultu CrJ»g rlr^ltu Vt¤tu <&t ltufhe œt<t <hV&e
WbuhJtltu &<tu Vt¤tu yaqf fvtRlu <ublt «turJzLz Vkzlt Ft<tbtk sbt &tg,<ule aftmKe fhelu
s vAelt brnltle awfJKe ytWxmtumekd yusLmelu fhJe.
R.ve.yuV.ytu. fauhelt yr^f]< yr^fthe©eytult sKtÔgt bwsc ybœtJtœ Bgwrlrmvj
ftuvtuohuNlbtk ftb fh<tk ftuLx[tfxh©eytu, mÃjtgoh©eytu <&t fLmjxLx©eytu rJduhu suJe <btb cnthle
yusLmeytuyu <ublt nM<flt fboathe©eytultu vK R.ve.yuV.btk mbtJuN fhJtltu ylu R.ve.yuV.lt
rlgb bwsc R.ve.yuV. awfJJtu sYhe ylu VhSgt< Au. stu yub fhJtbtk awf &tg <tu r«Lmevtj
yuBÃjtugh <hefu <ublt awfJJtlt ve.yuV. ykdult ltKtk rlg< Ôgts, vulÕxe ylu zubuSm mne<
ybœtJtœ Bgwrlrmvj ftuvtuohuNlu awfJJtle sJtcœthe l &R Nfu <u nu<w&e mkœrCo< vºt ¢btkf 3 yLJgu
bnu. Bgwrl. frbNlh©e XhtJlk.50 <t.06/08/2018&e b¤uj bkswhe R.ve.yuV.yufx jtdw &guj ntug
<uJt ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftb fh<t ntjbtk ftgoh< ntug <uJt ylu yts vAe ftb
ytvJtlt &tg <uJt <btb ftuLx[tfxhtulu ftb ytv<t vqJuo R.ve.yuV.hSMx[uNl fhtJuj ntug <u sYhe
Au.<ubs suytulu R.ve.yuV.yufx l&e jtdw vz<tu <uJt ftuLx[tfxhtuyu htFuj fboathe©eytu btxu R.ve.yuV.
yufx <&t htsg mhfth©elt vrhvºtbtk sKtÔgt bwsc r«Lmevtj yuBÃjtugh <hefu R.ve.yuV.le
sJtcœthe ybœtJtœ Bgwrlrmvj ftuvtuohuNlle hnu<e ntuJt&e CrJ»gbtk R.ve.yuV. yufxlwk vtjl l
fhJt&e zebtLz ltuxem <&t ftgœtfeg «r¢gt&e caJt btxu <&t ftgœtfeg vrhrM&<e WvrM&< l &tg <u
nu<w&e htsg mhfth©elt ©b ylu htusdth rJCtdlt yt mt&u mtbuj fhuj vrhvºt ¢btkf
RveyuV/182016/368596/b(3) <t.07/07/2017 ltu awM<vKu ybj fhJtu sYhe Au.
ybœtJtœ Bgwrlrmvj ftuvtuohuNllt <btb Ft<tlt Jztyr^fthe©eytulu <ublt nM<flt Ft<t/
rJCtdbtk fhtJJtle &<e ftuR vK «fthle ftbdehe btxu fhtJJtbtk ytJ<t fJtuxuNl, xuLzh fu ytuVhbtk
R.ve.yuV.yufx bwsc sYhe hSMx[uNl ctc<u yawf ltuk^ fhJtle <&t R.ve.yuV.yufxltu awM< vKu
ybj fhJtle Ftm ltuk^ juJt yºtu&e sKtJJtbtk ytJu Au.
zu.Bgwwrl.frbNlh
Seal and Signature of the Bidder Addl.City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Vol-01 tender-59.pdf
Vol-2 tender-59.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .