| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance PUNJAB | FATEHGARH SAHIB | PUNJAB | 140402 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THE SALAIMPUR CO-OP L/C SOCIETY LIMITED L1 | GARG ENTERPRISES L3 | Ram Singh Kanda and sons L2 |
|---|---|---|---|---|---|---|
| 1.00 | Assistance in coal bunkering (clause 2.01 of AA)
(One operation is equivalent to one man day worked for eight hours) | 4,380 | Operations | 1,320 ₹57.8 L | 1,365 ₹59.8 L | 1,339.39 ₹58.7 L |
| 2.00 | Assistance in upkeep of SGP and GTG/HRSG (clause 2.02 of AA) and upkeep of both coal bunkering systems (clause 2.03 of AA)
(One operation is equivalent to one man day worked for eight hours) | 7,711 | Operations | 1,320 ₹1.0 Cr | 1,365 ₹1.1 Cr | 1,339.39 ₹1.0 Cr |
| 3.00 | Shifting of mill rejects, stones removed from conveyors, ash below EP hoppers, chimney, spilled coal under junction towers, crusher house, gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside/outside the premises of factory as per clause no 2.04 of Scope of work. | 1,500 | Trolley of 3M3 capacity | 150 ₹2.3 L | 125 ₹1.9 L | 99.39 ₹1.5 L |
| 4.00 | Removal and disposal of sludge, silt, muck etc. from open surface drains, storm water drains within the battery limit of SGP, HRSG and MHP including Pipe trenches, slurry line trenches and ash settling pits as per clause no 2.05 of Scope of work. | 50 | Trolley of 3M3 capacity | 54.3 ₹2,715 | 65 ₹3,250 | 69.39 ₹3,469.50 |
| 5.00 | a) Shut down man days as per clause no. 2.06 a) of Scope of work
(One Shut down man day is equivalent to 36 man days) | 10 | Rate/shut mandays | 1,100 ₹11,000 | 1,200 ₹12,000 | 39.39 ₹393.90 |
| 6.00 | b) Supply of manpower during exigency
for smooth running of plant as per clause no 2.06 b) of Scope of work. | 200 | Rate/ Manday | 31.29 ₹6,258 | 40 ₹8,000 | 39.39 ₹7,878 |
| 7.00 | Upkeep of Control Rooms and office areas of SG&PP section - 26 days a month | 12 | Man-months | 26,000 ₹3.1 L | 20,000 ₹2.4 L | 27,939.39 ₹3.4 L |
| 8.00 | Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler
a) Without Scaffolding | 2 | Boiler | 1,100 ₹2,200 | 900 ₹1,800 | 1,039.39 ₹2,078.78 |
| 9.00 | Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler
a) With Scaffolding | 1 | Boiler | 1,107 ₹1,107 | 900 ₹900 | 1,039.39 ₹1,039.39 |
Tender Value
₹1.6 Cr
EMD Value
₹1 L
Closing Date
22 Apr 2023, 5:00 pmClosed
N J SINGH
TECHNICAL BUILDING NFL BATHINDA
Upkeep of Steam Generation and Material Handling Plant contract
2023_NFL_150819_1
NFB/PROD/SGandPP/207-B/2023-24
Limited
Manpower Supply
365 days
NFL BATHINDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Payable To NFL
₹1 L
Yes
17 May 2023
1 Apr 2023
24 Apr 2023
1 Apr 2023
22 Apr 2023
1 Apr 2023
Amount
Assistance in coal bunkering (clause 2.01 of AA) (One operation is equivalent to one man day worked for eight hours)
Assistance in upkeep of SGP and GTG/HRSG (clause 2.02 of AA) and upkeep of both coal bunkering systems (clause 2.03 of AA) (One operation is equivalent to one man day worked for eight hours)
Shifting of mill rejects, stones removed from conveyors, ash below EP hoppers, chimney, spilled coal under junction towers, crusher house, gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside/outside the premises of factory as per clause no 2.04 of Scope of work.
Removal and disposal of sludge, silt, muck etc. from open surface drains, storm water drains within the battery limit of SGP, HRSG and MHP including Pipe trenches, slurry line trenches and ash settling pits as per clause no 2.05 of Scope of work.
a) Shut down man days as per clause no. 2.06 a) of Scope of work (One Shut down man day is equivalent to 36 man days)
b) Supply of manpower during exigency for smooth running of plant as per clause no 2.06 b) of Scope of work.
Upkeep of Control Rooms and office areas of SG&PP section - 26 days a month
Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler a) Without Scaffolding
Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler a) With Scaffolding
Ram Singh Kanda and sons
GARG ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid