Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.4 LAdmitted-Finance | ₹68.4 L | L1 | Admitted-Finance |
| 2 | L2₹77.6 LAdmitted-Finance | ₹77.6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | ELMACK ENGG SERVICES L2 | GEZWI INDUSTECH L1 |
|---|---|---|---|---|---|
| 1.00 | Supply Manufacturing and installation of Multifunction Test Bench: Minimum dimensions 2000 mm X (900-1000) mm X 750 mm (Tabletop height) ± 50mm. Instrument Mounting height (1450-1620) ± 50mm mm from ground. Mains power control and Isolation Module
Single Phase Mains Power Supply - AC Power Panel having:
1. Voltmeter and Ammeter for incoming (TB) AC Supply
2. RCCB for Test bench MAINS and MCB’s for Individual instruments
3. Fixed DC Power Supply Point 24VDC/5AMP- 3nos output socket (1 in each test bench)
4. Fixed 110 VAC/5AMP – 6 nos output sockets (2 in each test bench)
5. Fixed 230 VAC/5AMP – 12 nos output socket (4 in each test bench)
6. Six Nos. of Chair (two for each test bench) | 3 | Nos. | 4,75,540 ₹14.3 L | 1,74,640 ₹5.2 L |
| 2.00 | Supply and Installation of Variable DC Power Supply: 0 to 60V/3A | 1 | Nos. | 46,020 ₹46,020 | 35,400 ₹35,400 |
| 3.00 | Supply and installation of Variable AC Power Supply with Display | 1 | Nos. | 13,098 ₹13,098 | 40,120 ₹40,120 |
| 4.10 | Panel Mounted Pressure Calibrator -10mbar to 10mbar | 1 | Nos. | 23,27,314 ₹23.3 L | 11,32,800 ₹11.3 L |
| 4.20 | Panel Mounted Pressure Calibrator -500 to 500 mbar | 1 | Nos. | 4,93,358 ₹4.9 L | 13,73,520 ₹13.7 L |
| 4.30 | Panel Mounted Pressure Calibrator -1bar to 2bar | 1 | Nos. | 1,60,008 ₹1.6 L | 13,21,600 ₹13.2 L |
| 5.00 | Supply and installation of Decade Resistance Box in the range 0.01Ω to 1MΩ | 1 | Nos. | 1,05,020 ₹1.1 L | 1,71,100 ₹1.7 L |
| 6.00 | Panel Mounted Digital Multimeter | 3 | Nos. | 1,38,060 ₹4.1 L | 1,05,964 ₹3.2 L |
| 7.00 | Supply and installation of Electrically Operated Vacuum Pump with Hose | 1 | Nos. | 53,100 ₹53,100 | 99,120 ₹99,120 |
| 8.00 | Supply and installation of Panel Mounted Multifunction Calibrator having Foundation Fieldbus Communication, Documenting feature & Pressure calibration facility | 1 | Nos. | 22,80,586 ₹22.8 L | 13,23,960 ₹13.2 L |
Updated dates
Tender Value
₹72.9 L
EMD Value
₹1.5 L
Closing Date
24 Feb 2026, 3:00 pmClosed
General manager
Heavy Water Plant, Tuticorin
Design Engineering Supply testing and Commissioning of Instrument Calibration Test Bench
2026_HWB_894980_1
HWPT/INST/2025/324/IC
Open Tender
Miscellaneous Works
Heavy water Plant Tuticorin
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.5 L
26 May 2026
22 Jan 2026
28 Feb 2026
22 Jan 2026
24 Feb 2026
22 Jan 2026
22 Jan 2026 - 7 Feb 2026
Supply Manufacturing and installation of Multifunction Test Bench: Minimum dimensions 2000 mm X (900-1000) mm X 750 mm (Tabletop height) ± 50mm. Instrument Mounting height (1450-1620) ± 50mm mm from ground. Mains power control and Isolation Module Single Phase Mains Power Supply - AC Power Panel having: 1. Voltmeter and Ammeter for incoming (TB) AC Supply 2. RCCB for Test bench MAINS and MCB’s for Individual instruments 3. Fixed DC Power Supply Point 24VDC/5AMP- 3nos output socket (1 in each test bench) 4. Fixed 110 VAC/5AMP – 6 nos output sockets (2 in each test bench) 5. Fixed 230 VAC/5AMP – 12 nos output socket (4 in each test bench) 6. Six Nos. of Chair (two for each test bench)
Supply and Installation of Variable DC Power Supply: 0 to 60V/3A
Supply and installation of Variable AC Power Supply with Display
Panel Mounted Pressure Calibrator -10mbar to 10mbar
Panel Mounted Pressure Calibrator -500 to 500 mbar
Panel Mounted Pressure Calibrator -1bar to 2bar
Supply and installation of Decade Resistance Box in the range 0.01Ω to 1MΩ
Panel Mounted Digital Multimeter
Supply and installation of Electrically Operated Vacuum Pump with Hose
Supply and installation of Panel Mounted Multifunction Calibrator having Foundation Fieldbus Communication, Documenting feature & Pressure calibration facility
Supply and installation of Calibration Management software with Documenting Hardware
Make cut out for old gauges total no. of cutout is 7 with each cutout make one inlet and two outlet port for pneumatic supply 1. Total 2nos of cutout for 248mm diameter 2. Total 4nos of cutout for 155mm diameter 3. Total 1nos of cutout for 200mm diameter
Supply of Table for Documenting Hardware
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 0.37 MB
TechnicalDoc.pdf
Tender Documents • 0.38 MB
BOQ_940888.xls
BOQ • 0.32 MB
GENERALCONDITIONSCONTRACT.pdf
Additional Documents • 1.52 MB
Download all tender documents and submit your bid