| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAccepted-AOC KANNUR | KERALA | 670001 | ₹8.5 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹9.7 Cr+₹1.2 Cr (14.1%)Rejected-AOC | ₹9.7 Cr+₹1.2 Cr (14.1%) | L2 | Rejected-AOC Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Experience certificate submitted for balance work-include approach road and BC work only |
| Sl No | Description | Qty | Unit | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L1 | PMR Construction Company L2 |
|---|---|---|---|---|---|
| 1.00Appendix A. bridge proper | |||||
| 1.00 | OD96656/2021-2022:RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete. | 150.72 | metre | 1,310 ₹1,97,443.2 Lowest | 1,565.94 ₹2,36,018.48 |
| 1.00 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means | 1,362.78 | cum | 175 ₹2,38,486.68 | 116.49 ₹1,58,750.36 Lowest |
| 1.00 | 12.1.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited) - Mechanical Means | 148.77 | cum | 2,500 ₹3,71,925 | 1,015.29 ₹1,51,044.69 Lowest |
| 1.00 | 12.8.F.2:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump - (Without form work) | 28.75 | cum | 8,700 ₹2,50,168.5 Lowest | 10,143.93 ₹2,91,688.71 |
| 1.00 | OD101871/2023-2024:Providing MS Dowel Bar with 25 mm dia rod 3.0m Long 1.00m C/c plugging 1.50m into concrete and 1.50m into rock after drilling holes in granite rock including cost and conveyance of all materials cutting od into the required length and fixing rod into position with CC etc complete with all other incidental | 168 | 1 nos | 1,424 ₹2,39,232 Lowest | 1,560.46 ₹2,62,157.28 |
| 1.01 | 12.8.E.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump <br> | 231.45 | cum | 8,800 ₹20,36,760 Lowest | 10,537.79 ₹24,38,971.5 |
| 1.01 | 12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump | 201.45 | cum | 9,000 ₹18,13,050 Lowest | 10,555.11 ₹21,26,326.91 |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 90.91 | MT | 92,600 ₹84,18,266 Lowest | 1,26,033.49 ₹1,14,57,704.58 |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 281.13 | cum | 9,240 ₹25,97,678.16 Lowest | 11,417.06 ₹32,09,723.75 |
Tender Value
₹7.8 Cr
EMD Value
₹2 L
Closing Date
5 May 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum 695033
Construction
2025_KRFB_757333_2
PWD/KR/TR/108204/2021_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
365 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,010
Yes
₹2 L
Yes
18 Mar 2026
22 Apr 2025
7 May 2025
22 Apr 2025
5 May 2025
22 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A. bridge proper | |||||
| 1.001 | OD96656/2021-2022:RING BUND Type II Putting up ring bund with earth filled gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work. etc. complete. | 150.72 | metre | - | - |
| 1.002 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means | 1,362.78 | cum | - | - |
| 1.003 | 12.1.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited) - Mechanical Means | 148.77 | cum | - | - |
| 1.004 | 12.8.F.2:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump - (Without form work) | 28.76 | cum | - | - |
| 1.005 | OD101871/2023-2024:Providing MS Dowel Bar with 25 mm dia rod 3.0m Long 1.00m C/c plugging 1.50m into concrete and 1.50m into rock after drilling holes in granite rock including cost and conveyance of all materials cutting od into the required length and fixing rod into position with CC etc complete with all other incidental | 168 | 1 nos | - | - |
| 1.006 | 12.8.E.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump <br> | 231.45 | cum | - | - |
| 1.007 | 12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump | 201.45 | cum | - | - |
| 1.008 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 90.91 | MT | - | - |
| 1.009 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 281.13 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.10 MB
Tenderdocument_2.pdf
Tender Documents • 0.03 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument_3.pdf
Tender Documents • 15.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .