Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | L1 | Accepted-AOC TECHNO-COMMERCIALLY ACCEPTED | |
| 2 | Rejected-Technical BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED | |
| 3 | Rejected-Technical BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED |
Tender Value
₹3.7 L
EMD Value
₹4,700
Closing Date
26 Jan 2024, 10:00 amClosed
CHETAN KARMA
Kedla Washery, Hazaribagh Area, CCL
Repairing of Switchgear Panel of crusher unit no. 113A and VC Panel of unit no. 224B
2024_CCL_298261_1
PO/KW/e-Tender/23-24/93, dated 10.01.2024
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Kedla Washery
As per NIT
2 documents required · 2 mandatory
₹4,700
11 May 2024
11 Jan 2024
27 Jan 2024
12 Jan 2024
26 Jan 2024
12 Jan 2024
12 Jan 2024 - 17 Jan 2024
Amount
Supply of SDFU 400A TPN 1NO 1NC
Supply of Power Contractor 300A, 2NO 2NC coil Voltage 230V AC
Supply of overload current relay 0.5 to 60A, BOCR 3EZ
Supply of CT 3CT version 200/5A
Supply of HRC fuse 315ADIN type size II
Supply of Yoke assembly VC holding Coil 220V, DC, 400A, 6.6KV
Supply of resistance box with contactor 4NO 4NC
Supply of electronic over current relay BOCR FDM 0.5-60A
Supply of resin cost core balance transformer
Supply of epoxy CT rated 6.6KV double ratio up to 400A
Supply of auxiliary switch assly. 4NO 4NC
Labour cost
Contractors profit
Total impact of GST for the purpose of CTC
TRIBHUWAN ENTERPRISES
TRIDEO CONSTRACTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .