Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.1 LAccepted-AOC | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹31.6 L+₹3.5 L (12.6%)Rejected-AOC | 2 | Rejected-AOC L2 Bidder | |
| 3 | 3₹34.2 L+₹6.1 L (21.6%)Rejected-AOC | 3 | Rejected-AOC L3 Bidder |
Tender Value
₹39.5 L
EMD Value
₹50,000
Closing Date
23 Feb 2024, 4:00 pmClosed
Execeutive Engineer
O/o Executive Engineer Irrigation Division Malampuzha
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Plastering RCC 1_1 5_3 using 20mm nominal size stone aggregate Steel reinforcement Earth filling etc
2024_Irrig_658561_1
IRR/PI/TR/3749/2023_5_9_8/1CH
Open Tender
Civil Works - Canal
Item Rate
365 days
Cheramangalam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
Yes
15 Mar 2024
14 Feb 2024
26 Feb 2024
14 Feb 2024
23 Feb 2024
14 Feb 2024
Amount
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
G.RAMACHANDRAN
RAJALEKSHMY B.
Bidder Name
G.RAMACHANDRAN
Sreekumar C K
RAJALEKSHMY B.
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1018296.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .