Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹14.1 Laccepted-aoc | ₹14.1 L | accepted-aoc |
Tender Value
₹15.2 L
EMD Value
₹15,300
Closing Date
15 Jul 2026, 3:00 pmClosed
Divisional Engineer-(Electrical), Tirumala
TIRUMALA
Hire charges for arranging temporary illumination to the roads and buildings etc, in connection with Srivari Annual and Navarathri Brahmotsavams and fairs and festivals etc, in ESD-K and P dam,Tirumala for the year 2026-27
959773
125/DE(Elec)Tml/TTD/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
7 documents required · 7 mandatory
₹540
₹15,300
11 Aug 2026
9 Jul 2026
9 Jul 2026
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.
Upto Ten days (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Ten days (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/20 Amps TPST / TPIC switch with pilot lamp and neutral. For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. ii) 30/60 Amps TPST / TPIC switch with pilot lamp and neutral link - For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 300 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supply, Fixing, wiring, Servicing, Operation & Maintenance of LED RGB wall wash par light Fitting with all accessories including suitable wire, Suitable brackets and controls units wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Ustavams) and all labour charges etc completed. Upto Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:All the LED wall washers must be placed such that the entire wall must have one colour at a time. Minimum 4 colours must be used. The Colour change of all fixtures has to be take up at a time with / without time delay.
All the change of colour must be connected to mixer which is of software control. The software must able to change the colour from one to other in slow manner. The above work includes software, plugs, wire etc., so that no bare conductor seen.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
NOTE (i)The rates are of basic rates excluding GST. (ii) The applicable GST will be reimbursed/paid as per actuals on production of proof. (iii)Statutory deductions will be made as per norms, if applicable. Any modalities imposed on GST by the Government from time to time, the same will be implemented.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.
Upto Ten days (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Ten days (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets) For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/20 Amps TPST / TPIC switch with pilot lamp and neutral. For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. ii) 30/60 Amps TPST / TPIC switch with pilot lamp and neutral link - For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 300 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supply, Fixing, wiring, Servicing, Operation & Maintenance of LED RGB wall wash par light Fitting with all accessories including suitable wire, Suitable brackets and controls units wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Ustavams) and all labour charges etc completed. Upto Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:All the LED wall washers must be placed such that the entire wall must have one colour at a time. Minimum 4 colours must be used. The Colour change of all fixtures has to be take up at a time with / without time delay.
All the change of colour must be connected to mixer which is of software control. The software must able to change the colour from one to other in slow manner. The above work includes software, plugs, wire etc., so that no bare conductor seen.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Upto Tendays (For 1st salakatla brahmotsavams from 15-9-2026 to 23-9-2026)
Upto Tendays (For 2nd Navarathri Brahmotsavams from 12-10-2026 to 20-10-2026)
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
NOTE (i)The rates are of basic rates excluding GST. (ii) The applicable GST will be reimbursed/paid as per actuals on production of proof. (iii)Statutory deductions will be made as per norms, if applicable. Any modalities imposed on GST by the Government from time to time, the same will be implemented.
(Rupees Fifteen lakhs twenty three thousands six hundred and ten only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 125.xls
TENDER_DOCUMENT • 2.02 MB
NIT 125.docx
TENDER_DOCUMENT • 0.18 MB
NIT 125.xlsx
TENDER_DOCUMENT • 0.02 MB
~$NIT 41.xlsx
TENDER_DOCUMENT • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].