Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance KENDAYAGOUNDANUR MURUNALLIKOTTAI POST DINDIGUL 624 710 | DINDIGUL | TAMIL NADU | 624710 | Admitted-Finance |
Tender Value
₹76.4 L
EMD Value
₹77,000
Closing Date
11 Sept 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Renovation of Ponds and Ooranies under State Finance Commission Grant in Pullambadi Block in Tiruchirappalli District for the year 2019-20 Phase II Package No.31
2020_RDTN_174778_31
A10/2340/2019 Dated 30.07.2020
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹77,000
DRDA Tiruchirappalli
23 Sept 2020
7 Aug 2020
11 Sept 2020
7 Aug 2020
11 Sept 2020
7 Aug 2020
10 Aug 2020
Amount
Renovation to Ealangulam in Melarasur at Melarasur panchayat Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to kailasan kullam in Melarasur at Melarasur panchayat Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Pattra kulam in Melarasur at Melarasur panchayat at Pullambadi block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Vannan eri in Melarasur at Melarasur panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Puthu Eri in Melarasur at Melarasur Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Sadaiyan Eri in Melarasur at Melarasur panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Thattan eri in Melarasur at Melarasur panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to karupudaiyan Eri in Mudhuvathur at Mudhuvathur panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Provision for Name Board charges
Renovation to Muppan Eri in Muthuvathur at Muthuvathur Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Kasivu Neer Kuttai in Nambukurichi at Nambukurichi panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(BATHING GHAT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(BATHING GHAT)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Kannan Kuttai in ootathur at ootathur Panchayat Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Kappusan Kuttai in P.K.Agaram at P.K.Agaram Panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Nallachi kulam in P.K.Agaram at P.K.Agaram Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Nandu Kulam in P.K.Agaram at P.K.Agaram Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Uppu Eri (Kuttai) in P.K.Agaram at P.K.Agaram Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Kalvettu Eri in P.K.Agaram at P.K.Agaram Panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete(INLET)
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(INLET)
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete(INLET)
Provision of cement pipe 90mm dia(INLET)
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete(INLET)
Provision for Name Board charges
Renovation to Naneri in P.K.Agaram at P.K.Agaram Panchayat Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Melaeri Kulam in Pudhurpalayam at Puthurpalayam panachayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Kanakkan Eri in Pudhurpalayam at Pudhurpalayam Panachayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(Bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Vellathal kulam in Pudhurpalayam Pudhurpalayam panachayat at pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(Bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Puthu Eri in Pudhurpalayam at Pudhurpalayam Panachayat at pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(Bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Thoppulan kulam Pudhurpalayam at Pudhurpalayam Panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Therku odi kasivu Neer kuttai in Reddymangudi at Reddymangudi panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(WEIR)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(upto Basement)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Name Board charges
Renovation to Unnaa kuttai in Reddymangudi at Reddymangudi panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(WEIR)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete(upto Basement)
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Name Board charges
Renovation to Dheva Kulam in Saradamangalam at Saradamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Renovation to Mottapappathi Eri in Saradamangalam at Saradamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Ponnan kulam in Saradamangalam at Saradamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Renovation to Puthu Eri in Saradamangalam at Saradamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P. Jaisankar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .