Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-Finance | ₹8.3 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹9.0 LAccepted-Finance | ₹9.0 L | 2 | Accepted-Finance Accepted |
| 3 | 3₹9.4 LAccepted-Finance | ₹9.4 L | 3 | Accepted-Finance Accepted |
| 4 | 4₹10.2 LAccepted-Finance | ₹10.2 L | 4 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M/s Jitendra Electric Store L2 | K.C. Engineering Co. L4 | Shree Navdurga Electrical L1 | Jai Balaji Electricals L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 2 | Job | 38,000 ₹76,000 | 45,000 ₹90,000 | 30,300 ₹60,600 Lowest | 34,500 ₹69,000 |
| 2.00 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 864 | Job | 100 ₹86,400 | 200 ₹1,72,800 | 100 ₹86,400 | 98 ₹84,672 Lowest |
Tender Value
₹12.2 L
EMD Value
₹24,460
Closing Date
29 Apr 2026, 6:00 pmClosed
Sr. DGM RIICO Boranada
Office of the Sr. DGM RIICO Boranada
Providing and Fixing of High Mast Light at Ind. Area Medical Device Park.
2026_RIICO_552803_1
3/2026-27
Open Tender
Electrical Works
Percentage
365 days
RIICO BORANADA
Scanned copy of valid contractor Registration and duly signed Bid Documents and its terms and conditions
3 documents required · 3 mandatory
₹1,180
RIICO BORANADA
₹24,460
12 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
20 Apr 2026 - 29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | - | Job | - | - |
| 2 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
tenderdocument.pdf
Tender Documents • 2.51 MB
termsandconditions.pdf
Other Document • 0.40 MB
BOQ_984986.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].