| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹54.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹56.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹56.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹60.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹60.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹61.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹61.7 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹62.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹62.0 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | jamaludheen va L5 | Horizia Construction(india)pvt ltd L6 | Jipin John Abraham L3 | LARAS DEVELOPERS PRIVATE LIMITED L9 | HRUTHUL MP L1 | HYDRIX INFRASTRUCTURE PRIVATE LIMITED L2 | Jayanandan L8 | SRI ROYAL ELECTRICALS L7 | Dhebasish K S L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SUPPLYING OF PIPES FOR REPLACEMENT OF DEMOLISHED PIPES BY KRFB | ||||||||||||
| 1.00 | 100.98.117:Supply of DI K9 Pipe Conforming to IS 8329/2000, 200mm Dia. | 137.5 | metre | 2,471 ₹3,39,762.5 | 2,781 ₹3,82,387.5 | 3,089.59 ₹4,24,818.63 | 2,904.21 ₹3,99,328.88 | 3,089 ₹4,24,737.5 | 2,317.1 ₹3,18,601.25 Lowest | 2,780.63 ₹3,82,336.63 | 2,700 ₹3,71,250 | 2,749.73 ₹3,78,087.88 |
| 1.00 | 100.98.118:Supply of DI K9 Pipe Conforming to IS 8329/2000, 250mm Dia. | 96 | metre | 3,275 ₹3,14,400 | 3,685 ₹3,53,760 | 4,094.29 ₹3,93,051.84 | 3,848.83 ₹3,69,487.68 | 4,094 ₹3,93,024 | 3,070.7 ₹2,94,787.2 Lowest | 3,684.86 ₹3,53,746.56 | 3,500 ₹3,36,000 | 3,643.91 ₹3,49,815.36 |
| 1.00 | 100.98.119:Supply of DI K9 Pipe Conforming to IS 8329/2000, 300mm Dia. | 30 | metre | 4,045 ₹1,21,350 | 4,552 ₹1,36,560 | 5,057.17 ₹1,51,715.1 | 4,753.74 ₹1,42,612.2 | 5,057 ₹1,51,710 | 3,792.8 ₹1,13,784 Lowest | 4,551.39 ₹1,36,541.7 | 4,200 ₹1,26,000 | 4,500.88 ₹1,35,026.4 |
| 1.00 | 100.98.123:Supply of DI K9 Pipe Conforming to IS 8329/2000, 500mm Dia. | 33 | metre | 8,030 ₹2,64,990 | 9,034 ₹2,98,122 | 10,037.68 ₹3,31,243.44 | 9,435 ₹3,11,355 | 10,037 ₹3,31,221 | 7,528.2 ₹2,48,430.6 Lowest | 9,033.91 ₹2,98,119.03 | 8,000 ₹2,64,000 | 8,933.53 ₹2,94,806.49 |
| 1.00 | 100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia. | 500 | metre | 238 ₹1,19,000 | 234 ₹1,17,000 | 259.36 ₹1,29,680 | 243.8 ₹1,21,900 | 259 ₹1,29,500 | 194.5 ₹97,250 Lowest | 233.42 ₹1,16,710 | 250 ₹1,25,000 | 230.83 ₹1,15,415 |
| 1.01 | 100.98.155:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 110mm Outer Dia. | 280 | metre | 350 ₹98,000 | 347 ₹97,160 | 384.47 ₹1,07,651.6 | 361.4 ₹1,01,192 | 384 ₹1,07,520 | 288.3 ₹80,724 Lowest | 346.02 ₹96,885.6 | 380 ₹1,06,400 | 342.17 ₹95,807.6 |
| 1.01 | 100.98.157:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 140mm Outer Dia. | 404 | metre | 574 ₹2,31,896 | 559 ₹2,25,836 | 620.95 ₹2,50,863.8 | 583.69 ₹2,35,810.76 | 620 ₹2,50,480 | 465.7 ₹1,88,142.8 Lowest | 558.86 ₹2,25,779.44 | 600 ₹2,42,400 | 552.64 ₹2,23,266.56 |
| 1.01 | 100.98.158:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 160mm Outer Dia. | 794 | metre | 756 ₹6,00,264 | 731 ₹5,80,414 | 811.67 ₹6,44,465.98 | 762.97 ₹6,05,798.18 | 811 ₹6,43,934 | 608.7 ₹4,83,307.8 Lowest | 730.5 ₹5,80,017 | 790 ₹6,27,260 | 722.38 ₹5,73,569.72 |
| 1.01 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. | 894 | metre | 270 ₹2,41,380 | 124 ₹1,10,856 | 137.06 ₹1,22,531.64 | 128.54 ₹1,14,914.76 | 137 ₹1,22,478 | 102.2 ₹91,366.8 Lowest | 170 ₹1,51,980 | 130 ₹1,16,220 | 121.98 ₹1,09,050.12 |
Tender Value
₹75.8 L
EMD Value
₹50,000
Closing Date
25 Jul 2026, 5:00 pmClosed
Executive Engineer
WSP division Palakkad
DEPOSIT-WSS TO KUMARAPATHUR, WSS TO KOTTAPADAM AND ALANALLUR Utility Shifting of pipes and connections in Kanjirampara Masjid - Kumarapathur KRFB Road-Pipeline Work
2026_KWA_861341_1
05/26-27/EE/WSP/PKD
Open Tender
Civil Works - Others
Item Rate
Kumaramputhur
No
10 documents required · 10 mandatory
₹2,760
₹50,000
31 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
18 Jul 2026 - 25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SUPPLYING OF PIPES FOR REPLACEMENT OF DEMOLISHED PIPES BY KRFB | |||||
| 1.001 | 100.98.117:Supply of DI K9 Pipe Conforming to IS 8329/2000, 200mm Dia. | - | metre | - | - |
| 1.002 | 100.98.118:Supply of DI K9 Pipe Conforming to IS 8329/2000, 250mm Dia. | - | metre | - | - |
| 1.003 | 100.98.119:Supply of DI K9 Pipe Conforming to IS 8329/2000, 300mm Dia. | - | metre | - | - |
| 1.004 | 100.98.123:Supply of DI K9 Pipe Conforming to IS 8329/2000, 500mm Dia. | - | metre | - | - |
| 1.005 | 100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia. | - | metre | - | - |
| 1.006 | 100.98.155:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 110mm Outer Dia. | - | metre | - | - |
| 1.007 | 100.98.157:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 140mm Outer Dia. | - | metre | - | - |
| 1.008 | 100.98.158:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 160mm Outer Dia. | - | metre | - | - |
| 1.009 | 100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia. | - | metre | - | - |
stage.html
html • 0.03 MB
finance_1456671.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 0.86 MB
NoticeInvit.pdf
Tender Documents • 0.61 MB
BOQ_1456671.xls
BOQ • 0.33 MB
Form8384.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].