CHIEF ENGINEER (G)
Work of Inspection & Repairing of Parting Plate and Tube leakage checking & attending of HP Heaters 5 & 6 of Unit No 3, 4 & 5 at GTPS during AOH/COH and as & when required
293447
EW-273
Open
Miscellaneous Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹14,055
10 Apr 2026
10 Apr 2026
17 Jul 2026
10 Apr 2026
10 Jul 2026
10 Apr 2026
Date of opening of online Technical Bid,
all relevant documents submitted
through online process, Cover for As per Tender Notice
Tender fee and EMD at 15:30 Hrs
(Online technical bid will be opened for
EW-273 PUR-F-006 RFQ-
Bidders who have submitted Cover for
Tender Fee and EMD)
Tentative date of on-line opening of Party has to be in touch with website
price bid (if possible) at 15.30 hrs. https://tender.nprocure.com and also
with e-mail sent by above website
Important Notes to Bidders:
(1) All the online Annexure and price bid, other tender documents (As per PQC) must
be submitted/attached through online form only. Bidder has to upload scanned
copies of original documents (Notarized / self-attested copies of original – as specified
in tender document) with bid. No physical documents to be submitted by bidder
(2) Payment of Tender Fee /Earnest Money Deposit (EMD):
All the bidders will be required to pay Tender Fee & EMD as mentioned in the Tender
Document either in Demand Draft, Pay Order or Bank Guarantee (only for EMD) in
favour of Gujarat State Electricity Corporation Limited payable at Gandhinagar,
Gujarat. The scanned copy of original document shall have to be uploaded online with
the bid and RPAD or Speed Post only addressed to The Chief Engineer (G), Gujarat
State Electricity Corporation Limited, Thermal Power Station, Gandhinagar-
(3) Being three part Bid, bidder shall have to submit their tender in three stages i.e.
PRILIMINARY STAGE (EMD Details- scan copy(online) & Original document- Hard
Copy submission), TECHNICAL STAGE (on line submission only) and COMMERCIAL
STAGE (on line submission only).
First preliminary stage will be opened and if the documents submitted by bidder
towards payment of Tender Fee & EMD are found ok, then only Technical Bid will
be opened (On-line). Tenders submitted without Tender Fee & EMD by the firms,
will be rejected without entering into further correspondence. Submission of
required documents for exemption of EMD is mandatory.
The exemption in payment of EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process
for the product which they are manufacturing / service which they are
providing and have Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which
they are manufacturing/service which they are providing and re-cognized by
DPIIT under the Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of
the tender, from Gujarat Khadi Gramodyog Board or Khadi and Village
Industries Commission(K.V.I.C)or Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds,
dumb and deaf, disabled, mentally disabled persons;(ii)women's self-help group
recognized by Gujarat Livelihood Promotion Company; which participate directly
in tendering process for the product which they are manufacturing / service
which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering
process as Manufacturers or Service Providers, and holds a valid Udyam
Registration, are eligible for exemption from payment of Earnest Money Deposit
EW-273 PUR-F-006 RFQ-
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or
similar categories (i.e. other than Manufacturers/Service Providers) are not
eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change
in terms of investment in plant and machinery or equipment or turnover or
both, and consequent re-classification, an enterprise shall continue to avail of
all non-tax benefits of the category (micro or small or medium) it was in before
the re-classification, for a period of three years from the date of such upward
Vendor Registration with GSECL is not compulsory for submitting this tender.
(4) If any Bank Guarantee submitted against EMD/security deposit/PBG, same should be
valid one year from the date of expiry of BG. Bank Guarantee should be confirmed
through Structured Financial Messaging system (SFMS). SFMS allows intra/interbank
message transfer system of banking. Our bank details are as under.
ACCOUNT NAME GSECL
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
(5) The tender received after time and date specified in the tender notice will not be
accepted. Once the offer Submitted by the Contractor before due date of
submission, the Contractor will not be allowed to submit revised/
additional/Modified/other after opening of bid. Any alterations/ modification to the
bids received after submission of offer shall not be considered unless carried for by the
Corporation in negotiation.
(6) Any deviation found in Data / Details / Documents between on line offer (e-tendering)
and physically submitted documents (Tender document fee, Technical offer of the
bidder) offer of the same bidder will not be considered and no any further
communication in the matter will be entertained.
Further bidders are requested to submit price – bid (Part-II) on-line only and not to
submit the price bid in physical form. This is mandatory. If price bid is submitted in
physical form, same will not be opened and only on-line submitted price bid will be
considered for evaluation. Further if the quantity quoted differs in the any of the
technical bid forms and in price bid forms, it is discretion of CE Committee –GSECL to
consider the quoted quantity.
(7) PLEASE MENTION:
(a) EPF Code No.: _________________ (The contractor shall have to submit in online the
attested copy of EPF code certificate issued by RPFC without fail otherwise tender
will not be considered )
(c) GSTIN Registration No. : _____________________________________ ( For Works &
(8) In case short submission of documents with bid and / or clarification if any required
from the bidder, The required details / documents may be asked from bidder.
(9) It shall be sole responsibility of the bidder that the uploaded scanned documents (in
PDF form) Remain legible and should not be password protected
(10) Tender will be evaluated on basis of Data / Details / Documents submitted by online
(11) It is mandatory for all the bidders to upload their tender documents by on line only (E-
tendering) in scheduled time. No documents shall be considered physically which
are mentioned for on-line submission only.
EW-273 PUR-F-006 RFQ-
(12) The bidders are required to fill up all the online annexure / forms and shall be
uploaded invariably. This is intended for transparency and speedy evaluation of the
bids. Instead of simply confirming / attached in bid / refer physical offer, the Bidder
shall fill in the particulars against appropriate place in respect of each line appearing
in each online annexure. Wherever required, bidder shall invariably have to upload
supporting authentic documents in the online bid. (In the absence of required details
in the online annexure, the purchaser has every right to evaluate the bids accordingly
and bidder cannot raise any objection against any point during evaluation.
(13) Bidders are requested to remain in touch with the web-site for any amendment /
corrigendum or extension of due date etc
(14) EMD Fee Demand Draft with different purchaser or agency shall not be accepted.
Tender without EMD shall be rejected.
(15) The GSECL reserves the right to award the work to one or more bidders, considering
their technical and financial capacity OR to reject any or all tenders or accept any
tender without assigning any reason thereof.
(16) Once the offer Submitted by the Contractor before due date of submission, the
Contractor will not be allowed to submit revised/ additional/Modified/other after
opening of bid. Any alterations/ modification to the bids received after submission of
offer shall not be considered unless carried for by the Corporation in negotiation
(17) GSECL reserves the rights to reject any OR all tenders without assigning any reasons
(18) Vendor get to register in VMS System through vms.guvnl.com. For registration following
documents are required and mail to [email protected] and [email protected].
After registration vendor have to upload the invoice in the VMS system for smooth
functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
Site : vms.guvnl.com
Username : PAN (PAN number)
Password : MyInvoice@123
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
GENERAL CONDITONS
The tenderers should thoroughly read all the following clauses before submitting their
online tender with Tender Fee & EMD Fee cover will be opened as per tender notice date
and time. and if the documents towards payment of Tender Fee & EMD are found OK
then only, offer of the bidder will be considered for further evaluation.
EMD will be forfeited (i) if the tender, which it covers, is withdrawn during the validity of
the offer and (ii) the Tenderer fails to furnish / deposit the security deposit.
“It shall be mandatory to submit security deposit within 10 days from the date of issue
of Letter of Intent before order placement. In case when successful bidder not at all
responding within notice period or withdraws his offer then his EMD shall be forfeited
and he will not be allowed to participate in the tenders invited from the same office for
the period of One year for that place from where tender is invited.”
1. TECHNICAL BID: (Online only not by physically)
1.1) The technical bid comprises scope and nature of works and quantity of works/jobs,
drawings (Refer Schedule-B), required technical qualification for execution of the
works/job etc. for which price are to be quoted. Also, all the technical details of the
stores/materials offered in accordance with the Corporation scope of work,
specification guaranteed technical particulars and conditions, etc
The supplier/contractor should mention separate HSN/SAC code and rate of GST and
cess as applicable for each item of goods/services. If no specifically mentioned then
company will have option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of tenders.
1.2) The Technical Bid shall be opened as per Tender Notice (If possible).Please note that
the required documents should be invariably submitted in online only. If party has not
submitted tender in online is liable to be ignored.
1.3) Contractor has to submit all required documentary evidences thereof to qualify for
acceptance of their technical bid. The acquisition of the tender documents by any
party will not automatically qualify the party as to its capability to execute such or
similar orders. The Corporation shall assess the capability of the party at the time of
evaluation of the technical bids.
1.4) The submission of the offer by any contractor does not mean that the bidder is
qualified for execution of the works. After opening of the online technical bids, the
competent authority will evaluate on the basis of technical qualification criteria. If
contractor’s bid does not meet the technical qualification criteria, then his technical
bid will be ignored. Decision taken by the CE(G),GTPS will be binding to all in this
2.1) The price bid comprises Schedule-B, in which the tenderer has to offer their rates in
accordance with the technical specification specified in technical bid with all
commercial terms and condition. The Price Bid must be submitted strictly as per
Schedule-B and shall be submitted online only, not by physically.
Incomplete bids and amendments and additions to bids after opening of the bids will
be ignored out rightly.
The price bid of those who are techno-commercially qualified shall be opened. After
technical bid is opened, for modification, if any, all shall be given equal chance.
2.2) Price bids of technically acceptable tenders shall be opened after analyzed &scrutiny of
the technical bid.
2.3) The ‘TECHNICAL” and ‘PRICE” Bids shall contain adequate cross-reference wherever
necessary to ensure clear and proper co-relation of the two bids without ambiguities
whatsoever. Any technical questions information and clarifications that may be
required pertaining to this Tender should be referred to the Chief Engineer (Gen),
EW-273 PUR-F-006 RFQ-
Gandhinagar, TPS-382041 reserves the right to reject any OR all tenders without
assigning any reasons thereof.
2.4) Bidders have to quote their rates online only as per GSECL’s given format of price bid.
2.5) The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-B) the price bid submitted in physical mode shall not be considered.
CONDITIONS FOR PRICE BID
a) For Works & Supply GST rate will be paid with the applicable GST rules.
b) For Supply Portion Only:-“Party shall have to quote their rates in Schedule “B” of
price bid only along with commercial terms and conditions. The details of applicable
GST, service charges, packing & forwarding charges, freight, insurance, F.O.R. etc.
The supplier/contractor should mention separate HSN/SAC code and rate of GST and
cess as applicable for each item of goods/services. If no specifically mentioned then
company will have option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of tenders.
It is mandatory to indicate GST NO in annexure 10a of tech. bid otherwise if no
specifically mentioned then company will have option to take the prices as exclusive of
taxes and duties at maximum higher slab rates for the evaluation of tenders.
3. Applicability of Goods and Service Tax (GST):-
(a) The tenders shall be evaluated on firm price and cost with GST and cess as applicable
unless otherwise mentioned in the tender documents.
(b) If the supplier/contractor have opted for the composition scheme of GST, the same
must be clearly specified with valid declaration and certificate from department. In the
event of withdrawal/ cessation of the supplier from composition scheme during the
tenure of the contract, the rate(i. e. price) mentioned in the price bid shall be final and
any additional GST will have to be borne by the tenderer himself, In no case additional
amount towards GST or otherwise will be paid/reimbursed to supplier/contractor.
(c) The bidder shall have to inform their GST no. of the registered place(s) where from the
bidder intends to supply the goods/services, meaning there by the bidder has to
supply the goods/services from the relevant declared/ registered place(s) of supply
(d) The bidder shall not include GST in their quoted rates; but the bidder has to
separately indicate the GST rate, amount in the price bid schedule.
(e) In-case Govt notification comes for change in GST , the same will be applicable.
(f) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO.
(copy of PAN to be enclosed) Tenders submitted without GSTIN No by the firms, the
offer will be rejected without entering into further correspondence.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
Other Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that may be
caused in his man or material. Moreover, the contractor shall be fully responsible for
any damage caused to the Corporation’s properties done by his man/materials while
executing the work. The Corporation will be entitled to recover the damage from the
2. At any time if GSECL feels that progress of work is unsatisfactory and work force of
contractor is inadequate, other agencies/ departmental personnel will be put in
parallel for expediting the work. Amount so incurred will be recovered from the
contractor’s bill. In this case decision of the Engineer-in-charge shall be final and
binding to the contractor.
3. At any stage of the contract period, if the contractor fails to complete the job or his
work is not found satisfactory the same will be got done at his cost and risk and
additional expenditure incurred by the Corporation will be recovered from him by
giving one week's notice.
4. To sublet or transfer of contract without prior written approval of Corporation shall be
treated as breach of contract and it shall be punishable by forfeiting the S.D. as well
as termination of contract.
5. The Corporation reserves the right to forfeit the S.D. in case of any breach of contract
and in case of disputes. The decision of Chief Engineer (Gen), TPS GANDHINAGAR
shall be final, binding & acceptable to the Contractor. If contractor fails to start the
Work as Stipulated, the E.M.D. & S.D. Shall be forfeited.
6. Conditional tender will not be accepted. Withdrawal of tender condition
unilaterally by you before or after opening of tender will not be permitted.
7. The contractor has to carry out the required work strictly according to guidance given
by the Corporation's responsible officer.
8. The Corporation reserves the right whether the materials to be accepted, or not. Only
specified and scheduled materials are to be examined by Corporation's officer and
then if suitable will be accepted by the Corporation.
9. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt of the
materials in good condition.
10. The rates should be quoted without any condition. The rates be written in words and
figures legibly.
11. Revision of prices or any commercial terms affecting the price after opening of
technical bids shall not be considered and will be ignored.
12. The contractor shall have to execute an agreement with the Corporation on a non
judicial stamp paper, the cost of which will have to be borne by the contractor and will
have to sign the contract and tender booklet of the Corporation.
13. SECURITY DEPOSIT: In tender process for L1 bidder(lowest bidder) security
deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Exempted 3% of Order Value
Organization which are
exempted from paying
For all other Enterprises 5% of Order Value 5% of Order Value
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned
above. This may be recovered by deduction through running bills of the contractors and /
EW-273 PUR-F-006 RFQ-
or by treating the Earnest Money Deposit (Bid Security) paid at the time of submission of
14. The Bank Guarantees will be executed on the standard form prescribed by the
corporation. In case of the Bank Guarantees furnished / submitted, they should have
clear one time validity till the completion of the order in all respects and up to the
expiry of Guarantee period from the date of the work completion. Bank Guarantee for
Interim period will not be allowed. If by any reasons the work period is extended then
contractor should undertake to renew the Bank Guarantee at least one month before
the expiry of the validity failing which GSECL will be at liberty to encash the same.
“It shall be mandatory to submit security deposit as per above table within
days from the date of issue of Letter of Intent before order placement. In case
when successful bidder not at all responding within notice period or withdraws
his offer then his EMD shall be forfeited and he will not be allowed to participate
in the tenders invited from the same office for the period of One year for that
place from where tender is invited.”
If the Tenderer fails to pay the Security Deposit or defaults in execution of
the orders placed or if GSECL suffers any financial loss due to this, then GSECL
will be at liberty to adjust the amount from other orders of the same firm or by
encashing the Bank Guarantee.
All the costs of the stamp papers, other than required for payment is to be made
through SIDBI / ICICI by Board, are to be borne by you as per the Govt. of India’s
latest guidelines.
15. VALIDITES OF THE OFFERS:
The offers will have to be kept valid for a period of 180 days from the date of opening
of technical bids. In case of finalization of the tender is likely to be delayed, the
tenderers will be asked to extend the same without change in the prices or any
terms and conditions of the offer. If any change is made, original or during the
extended validity period, the offers will be liable for outright rejection without entering
into further correspondence in this regard and no reference will also be made.
16. If successful contractor fails to pay the required security deposit and does not come
forward to execute the work, the full value of EMD will be forfeited by the Corporation.
17. Any terms and conditions mutually agreed to writing shall be for a part of the
18. Payment will be made as per GSECL’s rule.
19. The authorized officer/person of the Corporation will have the liberty to check the
material and work etc.
20. Regarding the quality and acceptance of the jobs the authorized officer's decision will
be binding and final and no dispute on this account will be entertained.
21. General terms and conditions of the Corporation for works contract will be made
applicable for this work also.
22. No material for the said work will be supplied by the GSECL except specified in
schedule thereof.
23. WORK COMPLETION PERIOD: The Tenderers will have to confirm work completion
period as specified in this tender. Delay in execution of order on account of any
other reason will be subject to penalty.
24. PBG (Not Applicable) : “The supplier/contractor/party (i.e. tenderee) has to give Bank
Guarantee with validity period of additional 01 (one) month i.e. more than actual
Guarantee/Warranty period of 6/12/18/24/36/48/60 months (depending upon
product) to safeguard Company’s interest in case of any eventuality happening on the
last day of the Guarantee/Warrantee period after office hours of the Bank or Bank
25. PENALTY FOR LATE EXECUTION OF WORK: Any delay that may take place in
supply and / or erection, testing and commissioning activities beyond contractual
EW-273 PUR-F-006 RFQ-
cutoff date / stipulated period in the order shall be subjected to penalty (not liquidated
damages) at the rate of ½% of the contract price / order price per week or part thereof
subject to a maximum of 10% of the total contract value / order value (i.e. End cost
including taxes & GST).
26. Statutory variations:-any statutory increase or decrease on the taxes and duties
subsequent to your offer if it takes place within the original contractual delivery date
will be to the company’s account subject to the claim being supported by documentary
evidence. However if any decrease takes place after the contractual delivery date the
advantage will have to be passed on the company
27. If the work is not done as per specification given by the GSECL in stipulated time in all
respects, the penalty will be levied as per GSECL's rules.
28. The GSECL shall have the right to make any changes, additions / deletions or
modifications in any terms / conditions of the tender and / or specifications as may be
deemed necessary by the GSECL at its sole discretion at any time before the due date
of opening of the tender.
29. Tenderer should furnish a list of orders for similar work executed by them indicating
the name of the party and their order reference to whom they have worked, to be
furnished in Annexure- 6. Failure to do this will result on contractor’s tender being
rejected without any reference.
30. GSECL does not accept the printed conditions of any Tenderer. It will be ignored
without any reference; hence tenderers should withdraw such printed conditions if
31. Tenders will be accepted only on or before due date and time of opening.
32. If technical deviations furnished by the Tenderer are not agreeable to the GSECL, the
offers may be ignored. However it will be solely at GSECL’s discretion to consider the
technical deviations OR not for considering the Tenderer. No correspondences of the
Tenderer after opening of the bid will be entertained in this matter.
33. The contractor will be responsible and liable for any damage to man and materials
during his work.
34. While execution of this job our plant and auxiliaries will be in running conditions.
Hence contractor has to take all precautions for safety etc. Safety belts etc. also to be
used wherever necessary while working.
35. GSECL reserve the right to terminate the contract if quantity shown in Schedule-B is
executed earlier.
36. All the terms and conditions specified in Industrial & safety laws are binding on the
37. Registration certificate under labor contract act will have to be obtained before
execution of contract.
38. The laborers shall be supplied for 8 hours a day, so contractors shall arrange
39. The following List of Annexures and Documents (available in this tender document)
should be invariably submitted along with the tender:
(i) Schedule–“A” Indicating the Description of work & quantities for the tender.
(ii) Schedule–“B” Price Bid to be submitted online ONLY”
(iii) Annexure-“A” - Technical Scope of Work
(iv) Form of Bankers undertaking Performa for E.M.D and S.D.
(v) Annexures – 1 TO
(vi) Certificate – “A”.
(vii) Document of Important Instructions.
All the above documents should be duly filled in, signed & stamped with company’s
seal should be submitted along with the Technical Bid in online only.
40. Please note that any additional conditions / deviations, if any, found in the
Commercial terms & conditions, then the Price Bids of such tenderers will not be
opened and no further correspondences in the matter will be allowed.
EW-273 PUR-F-006 RFQ-
41. Tenderer should invariably fill up all the details of all the Annexure of this tender
document. This is mandatory. Also all the Annexures should be duly signed by
authorized signatories with their rubber stamp and along with Company’s Rubber
(Round) seal / stamp affixed on each paper.
42. All the tenderers must ensure that all the relevant documents / papers submitted with
the tender should be serially numbered, and properly documented. This must be
43. All the above points should be complied by the Tenderers. If not, tenders are likely to
be ignored without making any further reference.
44. If participating bidder/agency have stake in one or more other agencies / bidder who
are participating in same tender and on account of submission of wrong information /
declaration in the tender / enquiry certificate – A, then the bidder will be declared as
disqualified automatically and EMD / SD will be forfeited. Further, GSECL shall take
stern action including stop dealing with their firms’
45. The CE(G),GSECL, Gandhinagar, reserves right to reject/accept any or all tenders
without assigning any reasons thereof and to split up the work between the parties as
the case may be.
46. Relationship of employee: - Every bidder should, at the time of submission of bid,
give a declaration as under.
“If in any bidder company/firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his/her relative as
defined in section 2(77) of the Company’s act. 2013 is 10% or more, the tendering
Company will not deal with such company/firm at all.
Tenderer therefore, must specifically disclose this fact in his technical bid. Non-
disclosure of such facts would immediately disqualify the tenderer for further dealing
with the tendering company.”
47. Conflict of interest among Bidders/Agents: A bidder shall not have conflict of
interest with other bidders. Such conflict of interest can lead to anti-competitive
practices to the detriment of Procuring Entity’s interests. The bidder found to have a
conflict of interest shall be disqualified. A bidder may be considered to have a conflict
of interest with one more parties in this bidding process, if:
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial stake from
any of them; or
c) they have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on
the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation by a
bidder in more than one Bid will result in the disqualification of all bids in which
the parties are involved. However, this does not limit the inclusion of the
components/sub-assembly/assemblies from one bidding manufacturer in more
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only
one agent/dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of
the design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/management,
EW-273 PUR-F-006 RFQ-
only one unit should quote. Similar restrictions would apply to closely related
sister companies. Bidders must proactively declare such sister/common business/
management units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition
act, as amended from time to time. Every bidder should, at the time of
submission of bid, give a declaration, that bidder shall not have conflict of
interest with other bidders, as above
48. All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party
inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm
along with a certificate regarding verification of authenticity of documents as per the
format placed at Annexur-1. All the documents submitted by the bidder in support of the
meeting Technical QR only shall be digitally signed by the Specified Third-Party
inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
The verification and certification of authenticity of documents is acceptable from any of
1. M/s Competent inspectorate and Consultants Pvt. Ltd, Hyderabad, lndia.
2. M/s Gulf Lloyds industrial Service lndia Pvt. Ltd.-Ahmedabad.
3. M/s international Certifications Services.
4. M/s lntertek lndia Pvt. Ltd.
5. M/s SGS lndia Pvt. Ltd.
6. M/s Moody lnternational (lndia) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (lndia) Pvt. Ltd.
9. M/s Bureau Veritas (lndia) Pvt. Ltd.
10. Hertz lnspection & Services Pvt. Ltd.
11. IRCLASS Syslems and Solutions Pvt. Ltd.
Verification for authenticity shall not be applicable in following cases.
1: Bidders having proven track record or regular suppliers/contractors (i.e.
2: Past order copies of GSECL as these documents can be verified internally.
Bidders shall be responsible for getting their documents/ credentials verified & certified
by the Specified Third-Party inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm in support of Technical QR. All the costs pertaining
to third party verification and certification (including those by statutory auditors) shall
be borne by the Bidder. GSECL shall have no liability (financial or otherwise) towards
the same and shall not be liable for any claim/ dispute between the bidder and the
Specified Third-Party inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW-273 PUR-F-006 RFQ-
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Gandhinagar TPS.
Subject: Authentication of veracity of documents submitted by M/s …….. in support of
Meeting the Qualifying Requirements
Ref : Tender no.: ________________
M/s._______________________________________________(hereinafter called Bidder) having
Registered office at_____________________intend to participate in above referred tender of
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the
list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. _________________________ dated______________ (name of Documents)
2. Doc ref. no. _________________________ dated ______________ (name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of
We further confirm that we neither have any vested interest in aforesaid tender nor have
any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s._____________________________ (Bidder) for
the purpose of participating in the subject tender/s.
EW-273 PUR-F-006 RFQ-
General Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that may be
caused in his man or material. Moreover, the contractor shall be fully responsible for
any damage caused to the Corporation’s properties done by his man/materials while
executing the work. The Corporation will be entitled to recover the damage from the
2. At any time if GSECL feels that progress of work is unsatisfactory and work force of
contractor is inadequate, other agencies/ departmental personnel will be put in
parallel for expediting the work. Amount so incurred will be recovered from the
contractor’s bill. In this case decision of the Engineer-in-charge shall be final and
binding to the contractor. At any stage of the contract period, if the contractor fails to
complete the job or his work is not found satisfactory the same will be got done at his
cost and risk and additional expenditure incurred by the Corporation will be
recovered from him by giving one week's notice.
3. Subletting the contract to other agency is not permitted unless and otherwise
approved by the competent authority.
4. The contractor has to carry out the required work strictly according to guidance given
by the Corporation's responsible officer.
5. The Corporation reserves the right whether the materials to be accepted, or not. Only
specified and scheduled materials are to be examined by Corporation's officer and
then if suitable will be accepted by the Corporation.
6. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt of the
materials in good condition.
7. Any terms and conditions mutually agreed to writing shall be for a part of the
8. The authorized officer/person of the Corporation will have the liberty to check the
material and work etc.
9. Regarding the quality and acceptance of the jobs the authorized officer's decision will
be binding and final and no dispute on this account will be entertained.
10. General terms and conditions of the Corporation for works contract will be made
applicable for this work also. The booklet is attached herewith.
11. No material for the said work will be supplied by the Corporation except specified in
schedule thereof.
12. Penalty :-If the work is not done as per specification given by the Corporation in
stipulated time in all respects, the penalty will be levied as per Corporation's rules.
Any delay that may take place in supply and / or erection, testing and commissioning
activities beyond contractual cutoff date / stipulated period in the order shall be
subjected to penalty (not liquidated damages) at the rate ½ % of the contract price /
order price per week or part thereof subjected to a maximum of 10% of the total
contract value/ order value (i.e. End cost including GST)
13. Statutory variations:-any statutory increase or decrease on the taxes and duties
subsequent to your offer if it takes place within the original contractual delivery date
will be to the company’s account subject to the claim being supported by
documentary evidence. However if any decrease takes place after the contractual
delivery date the advantage will have to be passed on the company.
14. The contractor will be responsible and liable for any damage to man and materials
during his work.
15. While execution of this job our plant and auxiliaries will be in running conditions.
Hence contractor has to take all precautions for safety etc. Safety belts etc. also to be
used wherever necessary while working.
16. Corporation reserve the right to terminate the contract if quantity shown in Schedule-
B is executed earlier.
EW-273 PUR-F-006 RFQ-
17. All the terms and conditions specified in Industrial & safety laws are binding on the
18. Registration certificate under labor contract act will have to be obtained before
execution of contract
19. The laborers shall be supplied for 8 hours a day, so contractors shall arrange
20. Payment Terms: Party has to accept payment terms as per GSECL rules only i.e. as
per actual work done. NO ADVANCE payment will be allowed. Net Payment will be
released within 30 days after completion of work and submitting their relevant
21. Dispute Resolution Mechanism: For works contracts and composite Contracts, the
arbitration mechanism shall be governed by the Gujarat Public Works Contracts
Disputes Arbitration Tribunal Act, 1992 as per below details.
(1) Amicable Settlement : "Any dispute, difference, controversy or claim between the
parties arising out of or relating to this contract with reference to the construction,
interpretation, breach, termination or validity thereof (herein after referred as "the
Dispute") shall, upon the written request of either party by referred to the
authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good faith a
resolution of the Dispute within thirty days of the service of the request."
(2) Arbitration: If the Parties fail to amicably resolve the disputes or differences or
contrary claims as indicated herewith in sub clause (1) of Clause 21 arising under or
in connection with the present works contracts, whether pertaining to works
contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal
22. For procedure for health check-up accordingly bill shall be reimbursed once during
total contract period (for as & when and AOH/COH contract) maximum up to
Rs.1000 or actual cost per worker/ labour /person, whichever is minimum after
verification & recommendation by concern doctor. In case any worker left the work in
between than for replacement Worker Company will not provide any reimbursement,
however it is compulsory to submit new report of replacement worker for fitness
certificate at contractor’s own expense.
23. For Periodic Medical examination, No reimbursement for periodic medical
examination to be given to contract employee for whom GSECL are conducting
Periodic Medical examination at company’s cost at GTPS. If a contractor fails to
undergo periodic medical examination, they have to undergo prescribed investigation
as per hazard analysis from outside, No reimbursement to be given for these
investigations.
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW-273 PUR-F-006 RFQ-
BID - QUALIFICATION CRITERIA FOR TECHNICAL BID
Work of Inspection & Repairing of Parting Plate and Tube leakage checking &
Sub: attending of HP Heaters 5 & 6 of Unit No 3, 4 & 5 at GTPS during AOH/COH and as
& when required.
Pre-Qualification Criteria (PQC) (To be submitted with Technical Bid):-
The bidders are requested to submit the technical bid with the following credentials
for technically qualifying criteria in soft ONLY.
Technical Bid Qualifying Criteria regarding
1 The bidder should have executed / completed similar works
during the last seven (7) years in Government / semi
government / state electricity board / private limited company
/ public limited company / IPP , as on last date of the month
preceding the month of publication of tender, having minimum
contract /order values as indicated below :
a) One order of value not less than the amount equal to
Rs.374800.00 of the estimated cost.
b) Two orders, each of value not less than the amount equal
to Rs. 234250.00 of the estimated cost.
c) Three orders, each of value not less than the amount
equal to Rs187400.00 of the estimated cost.
Similar work means – Similar work means party shall have an
experience of maintenance/replacement work of High Pressure
Heater/Vessels/Equipment, Replacement work of High
Pressure Pipe Lines/Valves, Air Preheater Works, BFP Works,
Dearator cleaning work only. Experience in other company/firm
as an employee will not be considered.
3 Financial qualification criteria:
(1) The Average Annual Turnover of the bidder, shall not be less
than Rs 1.41 (Rupees One Lakh Forty One thousand only
) during the preceding three (3) financial years as one date of
Techno-Commercial bid opening.
(2) Net worth of bidder shall not be less than 100% of the
bidder’s paid up share capital as on the last day of the
preceding financial year. In case the Bidder meets the
requirement of Net worth based on the strength of its
Subsidiary (ies) and/or Holding company and/or
Subsidiaries of its Holding Companies wherever applicable,
the Net worth of the Bidder and its Subsidiary (ies) and/or
Holding company and/or Subsidiary (ies) of the Holding
Company, in combined manner should not be less than
100% of their total paid up share capital. However
individually, their Net worth should not be less than 75% of
their respective paid share capitals.
Net worth in combined manner shall be calculated as
EW-273 PUR-F-006 RFQ-
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X
where x1,x2, x3 are individual net worth which shall not
be less than 75 % of the respective paid up share
capitals and y1, y2, y3 are individual paid up share
(3) In case the bidder is not able to furnish its audited financial
statements on stand-alone entity basis, the unaudited
unconsolidated financial statements of the bidder can be
considered acceptable provided the bidder further furnishes
the following documents for substantiation of its
Copies of the unaudited unconsolidated financial
statements of the bidder along with copies of the Audited
consolidated financial statements of its Holding
A Certificate from the CEO/CFO of the Holding
Company, stating that the unaudited unconsolidated
financial statements form part of the Consolidated
Annual Report of the company.
(4) In cases where audited results for the last preceding
financial year as on the date of techno-commercial bid
opening are not available, the financial results certified by a
practicing Chartered Accountant shall be considered
acceptable. In case, Bidder is not able to submit the
Certificate from practicing Chartered Accountant certifying
its financial parameters, the audited results of three
consecutive financial years preceding the last financial year
shall be considered for evaluating the financial parameters.
Further, a Certificate would be required from the CEO/CFO,
stating that the Financial results of the Company are under
audit as on the date of Techno commercial bid opening and
the Certificate from the practicing Chartered Accountant
certifying the financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net
worth Certificate in support of Financial QR, duly certified
and verified for authenticity from Independent Statutory
Auditor of their company / Practicing Charted Accountant/
C.A. Firms / TPIA (Third-Party Inspection Agency ) empaneled
/ approved by GSECL along with copy of Annual Audited
Accounts of last three years
Note for point No.1, 2, 3 & 4:
I. Other income shall not be considered for arriving at
annual turnover.
II. “Holding Company" and “Subsidiary Company” shall
have the meaning ascribed to them as per Companies
Act of India, in vogue.
III. Net worth means the sum total of the paid up share
capital and free reserves. Free reserve means all reserves
credited out of the profits and share premium account
but does not include reserves credited out of the
EW-273 PUR-F-006 RFQ-
revaluation of the assets, write back of depreciation
provision and amalgamation. Further, any debit balance
of Profit and Loss account and miscellaneous expenses
to the extent not adjusted or written off, if any, shall be
reduced from reserves and surplus.
4 Details of P.F. code No. from the appropriate provident fund
authorities and details of P.F. paid to the employees for last six
months. Certificate of separate provident fund account number.
5 Copy of PAN No.
6 Partnership Deed/Memorandum of Association & Articles of
Association: If contractor is not sole proprietor, then
contractor shall have to furnish the copy of partnership deed
along with offer. In case of a Corporation, the M/A & A/A is
required to be submitted, without which offer is likely to be
ignored. If contractor shall also submit power of Attorney.
7 Labour License for labour Contract: The contractor on getting
the work order but before starting the work shall have to
furnish the copy of Labour License under the Contract Labour
(R & A) from the appropriate authorities without which the
contract order is liable to be terminated, if applicable.
8 Details of Tools, tackles, equipments and personals available
with firm relevant to the job/subject tender.
9 Copy of the updated valid labour contract license from the
appropriate authorities and updated workman group insurance
policy covering labour engaged, before starting work.
10 Details of skilled/semi-skilled persons presently employed by
the contractor having sufficient knowledge of similar jobs.
11 Copy of valid GST Reg. No
1. The Chief Engineer (Gen.), GSECL, GTPS reserve right to reject any tender or all tenders without
assigning any reason thereof and to split up the work between more than one party as the case
2. Non-compliance of above criteria the technical bid is liable to be rejected. After acceptance
of the Technical Bid, the Price Bid will be considered for opening.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
Sr. Details Confirmation
No. (Tick √ any one)
1 Annexure – 2 YES / NO
2 Firm’s details as per “Annexure –3” YES / NO
3 Copy of the un-priced schedule (Description and YES / NO
price). “Annexure - 4”.
4 Work Completion Period as per “Annexure- 5” YES / NO
5 Past experience details as per “Annexure-6” YES / NO
6 Performance certificates as per “Annexure-7” YES / NO
7 ANNEXURE – 8 YES / NO
8 ANNEXURE – 9 YES / NO
9 ANNEXURE – 10 YES / NO
10 ANNEXURE – 11 YES / NO
11 ANNEXURE – 12 YES / NO
12 Certificate of Important Instruction & certificate-A YES / NO
13 INTEGRITY PACT YES / NO
14 Schedule-“A” & Annexure-“A” (GSECL’s work/ Scope YES / NO
of work to be carried out by contractor specified duly
signed and with seal of firm.)
I / WE, confirm that following documents are attached with the technical bid of
Signature of the Tenderer
Seal of the Firm
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE
GIVEN FLAG MARKING FOR IDENTIFICATION.
EW-273 PUR-F-006 RFQ-
Subject: Work of Inspection & Repairing of Parting Plate and Tube leakage checking &
attending of HP Heaters 5 & 6 of Unit No 3, 4 & 5 at GTPS during AOH/COH and as &
Reference: Tender No. EW-273
Due on date: / /
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Scope of Work & requirements
during execution of work in tender mentioned under reference along with the
Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications/work.
3. Further, I / We also agree that additional conditions / deviations, if any, found in the
Commercial terms & conditions, our offer shall be out rightly rejected without assigning
any reason thereof.
4. We hereby agree for the terms & conditions laid down in Tender.
All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other related matters
for the tender documents.
c) General rules and directions for the guidance of contractor booklet of GSECL, GTPS
on our website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules, Industrial
Laws and Contract Booklet (a, b & c as above) and accordingly submitted my/our
Signature of the Authorized
Representatives of the firm
Seal of the Firm
Name of the Tendering Firm / Agency:
EW-273 PUR-F-006 RFQ-
DETAILS OF THE FIRM
Tenderer may MANDATORILY fill all the details in this form.
(These details are necessary to create the database of Contractors)
Contractor Name
Within Gujarat / Outside Gujarat /GST
Pvt. Firm / Public Ltd. / State Govt. Under (Indicate the relevant status)
taking / Central Govt. undertaking
Vendor Registration Letter No. & Date
(If registered and Letter issued by Board) -
(If Applicable)
Vendor Registration Fee (If Applicable) Paid / Not Paid (Tick any one, for New
Vendor Registration Date (If Applicable) -
Vendor Registration Validity Period From Date___________ to Date___________
(If Applicable)
P.F NO (Also Physical Document is
required along with the Technical Bid)
PAN NUMBER (Also Physical Document is
required along with the Technical Bid)
Custom No. and Date (If applicable)
Electrical License Type(If Applicable) (Also
Physical Document is required along with
the Technical Bid)
License Validity Period (If Applicable) From Date___________ to Date___________
Account Number of Bidder
Type of Account of Bidder
Branch Name & Address
Contact Number of the Branch
Copy of Cancelled Cheque
COMPANY EMAIL ID FOR
CONFIRMATION OF PAYMENT
Address of Registered Office Factory Works Authorized
Contact person name
City & Pin code
Phone Nos.(Office)
Phone Nos.(Residence)
Web site address
EW-273 PUR-F-006 RFQ-
UN – PRICED SCHEDULE (COPY WITHOUT PRICES)
Description Quantity Unit
Inspection & Attending/Repairing of HP Heater No 5 &
1 Parting Plate leakages by Cutting / Welding / Repairing of 10 No.
plates as per Scope of Work and Inst. of EIC.
EW-273 PUR-F-006 RFQ-
Work Completion Period
EW-273 PUR-F-006 RFQ-
DETAILS OF THE EXPERIENCE FOR SIMILAR TYPE OF WORK AS PER TENDER’S
PRE-QUALIFICATION CRITERIA.
Party should submit below executed detailed work order physically along with the
Technical Bid. This is mandatory.
Sr. NAME ORDER DESCRIPTION ORDER ORDER STATUS, IF REMARKS
No OF REFERENCE OF WORK AMOUNT FULLY ORDER
WORK No. & DATE EXECUTED. UNDER
YES/NO EXECUTION
A GUJARAT STATE ELECTRICITY CORPORATION LTD /SISTER COMPANY.
B OTHER STATE ELECTRICITY BOARD
C OTHER ORGANISATION.
EW-273 PUR-F-006 RFQ-
LIST OF PERFORMANCE CERTIFICATES SUBMITTED WITH THE TECHNICAL BID.
Party should submit below executed work performance certificate physically along
with the Technical Bid.
Sr. No. Name of the Authority by Reference No. & Details of Works
whom certificate is issued date
EW-273 PUR-F-006 RFQ-
ANNEXURE – 8 ( for Works )
Bidder must fill up below details & should place at the top of the Technical Bid.
1 PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2 TAX: [IN PERCENTAGE] ( GST )
3 The Last three-year Audited Annual Accounts, Positive
Net worth certificate, and Average Annual Turnover
certificate certified by charted accountant as Per
Qualification Requirement
4 Please quote your GST Registration No. (Also Physical
Document is required along with the Technical Bid)
5 Please quote your PF Registration No. & Date. (Also
Physical Document is required along with the Technical
6 PENALTY TERMS AGREED :
(Please Specify YES / NO.)
7 SECURITY TERMS AGREED:
(Please Specify YES / NO.)
8 DETAILS OF EMD PAYMENT (as applicable as below)
a) DD No & Date & Name of Bank
b) B.G. No. & Date & name of Bank
c) Cash details
9 Completion of Works
(Please Specify YES / NO.)
10 VALIDITY OF THE OFFER AGREED:
(Please Specify YES / NO.)
11 PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
12 WORK OFFERED AS PER SCHEDULE-B: (YES/NO)
13 TELEPHONE NOS. & FAX NO:
14 Authorized person of the firm :
15 Name of the proprietor, partners, directors [as the case
may be], along with address, telephone, fax no. etc.
16 If Vendor Registration is Done:(If Applicable)
(Please submit copy of Vendor Registration approval -
letter in the EMD cover).
EW-273 PUR-F-006 RFQ-
TECHNICAL DEVIATIONS IF ANY TO BE FURNISHED IN THIS ANNEXURE ONLY AND
TO BE SUBMITTED WITH TECHNICAL BID.
EW-273 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(Bidder should not quote their prices in this page)
Sub: Undertaking in regard to quoted prices.
All bidders will have to furnish the following undertaking duly filled in, signed and stamped
“This is to certify that we have not worked for the subjected tender viz.…………………. to
other SEBs / Power Utilities with this tender details of GSECL at lower % price than the %
prices quoted in this tender by us for the same item during last Six (6) Months.”
The prices quoted by us for the same item to other SEBs during the last six (6) months are
Signature of the Tenderer
Seal of the Firm
EW-273 PUR-F-006 RFQ-
ANNEXURE-10A (For Supply)
Vendor must fill up below details & should place at the top of the Technical Bid.
1. PRICES:[FIRMONLY]
(Please Specify YES/NO.)
2. Rates offered FOR:__________________
3. GST :[INPERCENTAGE]
(Please Specify IN/EXCLUSIVE/EXEMPTED)
Please quote your GST Registration No. &Date
Please specify GST NO
4. In case of GST(SGST,CGST OR IGST)please specify place
of Manufacturer unit from where material is to be supplied
5. PENALT YTERMS AGREED:
(Please Specify YES/NO.)
6. SECURITYTERMSAGREED:
(Please Specify YES/NO.)
7. P.G TERMS AGREED (Wherever applicable):
(P.G.-Performance Guarantee)(Please Specify YES/NO.)
8. DETAILS OF EMD PAYMENT
(Please Specify DD/BG/Pay order/ Valid SSI/Valid NSIC
No./Valid UDYAM/Valid KVIC/Valid MSME
9. DELIVERY TERMS AGREED:
(Please Specify YES/NO.)
10. VALIDITY OF THE OFFER AGREED:180 Days from the
date of opening of Technical Bid
11. PAYMENT TERMS AGREED: 80% against T.R.C. within
30days & balance 20% within 45 days
12. ITEMS OFFERED:
13. TELEPHONE NOS. & FAX NO:
14. Authorized person of the firm:
15. Name of the proprietor ,partners, directors [As the case
may be], along with address, telephone, fax no. e-Mail ID
Signature of Tenderer Company’s roundseal
EW-273 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING / BLACK
Sub: Undertaking in regard to Stop Deal / Banned for Business dealing / Black List
Ref: Tender No.:
M/S. ______________________________________ here by certify that M/S
__________________________________________ and their proprietor / any partner / any
directors of the firm is not stop deal and/or banned for business dealing and/or black listed
by GUVNL and/or their any subsidiary company viz.
GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
(Confirmed / not confirmed)
Contractor’s Signature
With Seal & Date
EW-273 PUR-F-006 RFQ-
Bidders must furnish the scan copy of below details along with technical Bid.
(1) A copy of order on hand.
(2) Detail order copies submitted as per Annexure-6.
(3) Performance Certificate if any.
(4) Documentary Proof for Partnership of proprietor, Partners, Directors (as the case may
be), along with Address, Telephone No, Fax No. etc. if any.
(5) The Last three-year Audited Annual Accounts, Positive Net worth certificate, and
Average Annual Turnover certificate certified by charted accountant as Per
Qualification Requirement.
(6) A copy of Goods and Service Tax Registration document along with valid Registration
Number as per Annexure –
(7) A copy of PF Registration document along with valid Registration Number as per
(8) A valid B.G. against EMD or DD for the payment of EMD as per Annexure-8.
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance
with the GSECL’s Work Tender specifications and as per Technical detail work/ drawing
as mentioned in the Tender Specifications. There is no commercial or Technical
deviation in the offer from the Corporation’s Tender Specification. I undertake to
abide by the GSECL’s tender description and Particulars. I undertake to complete work
strictly as per the GSECL’s Technical specification/ Scope of work/ Guaranteed
Technical Particulars / Drawing, even if any technical deviations are mentioned by me. I
also undertake to abide by all commercial conditions of the GSECL, including work
completion schedule.”
(Signature of the Tenderer)
1. Any offer without above certificate will not be considered and the tender will be out
rightly ignored in the absence of above certificate.
2. After opening of the Tender, if it is found that the offer given by the Tenderer is not
according to the GSECL’s specifications, Guaranteed Technical Specifications/ Scope
of work, Drawing and commercial terms and conditions and false certificate is given
by the Tenderer, then GSECL will not deal with the firm for the present Tender. It is,
therefore requested that the Tenderer should take care in giving their offer and
submission of documents.
3. The conditional tenders will not be accepted.
EW-273 PUR-F-006 RFQ-
Gujarat State Electricity Corporation Ltd.
Thermal Power Station, GANDHINAGAR
(On Firm’s Letter Head)
Sub: - Work of Inspection & Repairing of Parting Plate and Tube leakage checking & attending of HP Heaters
5 & 6 of Unit No 3, 4 & 5 at GTPS during AOH/COH and as & when required.
ON FIRM’S LETTER HEAD:-
I/we __________________________________________________________the authorized signatory of
M/s. __________________________________ hereby certified that M/s.
______________________________________is not related with other firms who have submitted
tenders for the same work under this inquiry / tender and the interest (i.e. Shareholding
in company and share in partnership firm) of any employee of the tendering Company or
my/our relative as defined in section 2(77) of the Company’s act. 2013 is 10% or more, the
tendering Company will not deal with such company/firm at all.
Also I /We declare that, I/We have not conflict of interest with other bidders, as per
Conflict of interest among Bidders/Agents
A bidder shall not have conflict of interest with other bidders. Such conflict of
interest can lead to anti-competitive practices to the detriment of Procuring Entity’s
interests. The bidder found to have a conflict of interest shall be disqualified. A
bidder may be considered to have a conflict of interest with one more parties in this
bidding process, if :
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial stake
from any of them; or
c) they have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about or
influence on the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation
by a bidder in more than one Bid will result in the disqualification of all bids
in which the parties are involved. However, this does not limit the inclusion of
the components/sub-assembly/assemblies from one bidding manufacturer in
more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers or
quote on their behalf in a particular tender enquiry. One manufacturer can
also authorize only one agent/dealer. There can be only one bid from the
1. The principal manufacturer directly or through one Indian agent on his
EW-273 PUR-F-006 RFQ-
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract that is the
subject of the Bid;
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/management, only one unit should quote. Similar restrictions
would apply to closely related sister companies. Bidders must proactively
declare such sister/common business/management units in same/similar
line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition
act, as amended from time to time.
SIGNATURE OF THE TENDERER
WITH DESIGNATION.
SEAL OF THE FIRM:
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED, BARODA Date:
To, create an environment where Business Confidence is built through Best Business
Practices and in fostered in an atmosphere of trust and respect between providers of goods
and services and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
■ To maintain the highest ethical ■ Not to bring pressure
standards in business and recommendations from outside GSECL
professions. to influence its decision.
■ Ensure maximum transparency ■ Not to use intimidation, threat
to the satisfaction of inducement or pressure of any kind on
stakeholders. GSECL or any of it’s employees under
any circumstances.
■ To ensure to fulfill the terms of ■ To be prompt and reasonable in
agreement / contract and to fulfilling the contract, agreement, legal
consider objectively the viewpoint obligations.
■ To ensure regular and timely ■ To provide goods and/or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
■ To ensure that no improper ■ To abide by the general discipline to be
demand is made by employees or maintained in our dealings.
by anyone on our behalf.
■ To give maximum possible ■ To be true and honest in furnishing
assistance to all the Vendors / information.
Suppliers/ Service Provider and
other to enable them to complete
the contract in time.
■ To provide all information to ■ Not to divulge any information,
suppliers/contractors relating to business details available during the
contract/job which facilitate him course of business relationship to
to complete the contract/job others without the written consent of
successfully in time. GSECL.
■ To ensure minimum hurdles to ■ Not to enter into carter/syndicate/
vendors/suppliers/contractors in understanding whether formal/non-
completion of agreement/ formal so as to influence the price.
contract/ work order.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED.
TPS: GANDHINAGAR.
Work of Inspection & Repairing of Parting Plate and Tube leakage
Sub: checking & attending of HP Heaters 5 & 6 of Unit No 3, 4 & 5 at GTPS
during AOH/COH and as & when required.
1. Removal of insulation from the heater if required.
2. Opening of Heavy Manhole by loosening of studs & nuts.
3. Opening of Parting Plates by means of fastening.
4. Inspection of Parting Plane border for erosion or other any damages.
5. Checking & attending tube leakage. Party shall have to arrange necessary arrange for
identification of leaky tubes i.e. dismantling of shell safety valves, provide water filling line, rtc.
6. Repairing of parting plane border by cutting/welding/grinding and replacing of plates as per site
7. All welding points are to be tested by DP Test.
8. Replacement of Gasket Joint and Refitting of Parting Plates by means of fastening.
9. Refitting of Heavy Manhole with full tightening of studs & nuts.
10. Charging of the heater to check any leakage or passing of feed water for short circuit & if found
any defect same is to be attended by contractor free of charge.
FOLLOWING ARRANGEMENTS ARE TO BE CARRIED OUT BY CONTRACTOR:
All kind of tools and tackles, consumables, ordinary welding electrodes, cutting and welding
machine with equipments (if required) along with oxyacetylene gas as per requirement. All brazing
and patch work facility as per requirement with material.
All kind of consumable like grease, rustolin, emery paper, cotton waste, etc and debris collection
arrangement etc.
All kind of man power with all respect and their transportation to site as well as for material
transportation.
Party shall have to arrange necessary scaffolding if required.
Party shall have to arrange H.P. welder to execute the welding work at his own cost.
FOLLOWING ARRANGEMENTS SHALL BE PROVIDED BY GSECL
Air and electricity. Work shop facility for rectification / repair works.
Open space for material storage in plant.
Consumable like special welding electrodes, DP test material will be provided by GSECL free of
Electrical Connection will be provided by GSECL from single point for lighting at free of cost and
further extension shall have to arrange by the contractor on their own cost. Three phase supply
connection will be provided to contractor’s equipments/tools by GSECL free of cost at location
decided by Engineer in Charge. ICTP switches and ELCBs shall have arranged by the contractor
at their own cost.
Following facilities will be provided by GSECL on CHARGEABLE BASIS.
Accommodation (Hostel / Quarter) facility will be provided on chargeable basis if available.
EW-273 PUR-F-006 RFQ-
Medical facility will be provided on chargeable basis as per GSECL norms during the execution of
this works if available.
GENERAL TERMS & CONDITIONS:
1. Work is to be carried out at Powerhouse Premises.
2. The work should be commenced after isolation of HP Heater- 5 &
3. If passing/leakage will persist after completion of job, contractor shall have to re-work without
additional cost; otherwise the same will be attended by GSECL at the risk & cost of contractor.
4. Loading, Unloading and Transportation of material from GTPS to party’s works and vice versa is to
be arranged by the party at their own cost. GSECL will provide necessary crane facility for Loading
and unloading at GSECL premises.
5. Party will be fully responsible for any loss/damage to the materials provided by GSECL. The cost of
loss/damage/shortage, if any will be recovered from the party’s bill.
6. Welding Electrodes for welding is to be utilized as per Parent Metal after Testing Parent Metal and
report thereof shall be submitted to GSECL.
7. GSECL will provide only special purpose welding electrode, special tools if required,
jointing/packing materials and fasteners at free of cost. Rest of the material, welding electrodes,
consumables, tools & tackles, jigs & fixtures, machineries, etc. for above work are to be arranged
by the party at their own cost.
8. After completion of work, contractor has to credit scrap materials at main store as per instruction of
9. Contractor has to handle the GSECL equipment / tools / tackles carefully otherwise the cost of
damage / shortage will be recovered from the party’s bill.
10. Contractor has to follow all labour laws and safety rules as per GSECL procedure.
11. Contractor has to appoint supervisor to supervise the work and to follow the instruction given by
GSECL on round the clock basis.
12. Contractor shall have to mobilize their manpower within 2 days after instruction of EIC.
13. During AOH/COH of units, contractors shall have to attend daily meeting as per time fixed by EIC.
14. Contractor shall have to submit daily progress report for work carried out during previous day.
15. Contractor shall have to mobilize their manpower within immediately after instruction of EIC.
GSECL will complete the work by deputing other agencies if the progress/ quality of works are not
found satisfactory at the risk and cost of contractor.
16. Payment will be made as per actual work done only.
17. No price escalation will be entitled.
18. Contractor shall have to execute Agreement on stamp paper of Rs. 300/- and Indemnity bond on
stamp paper of Rs. 300/- in the prescribed form before commencement of the work. The cost of the
stamp papers shall be borne by contractor.
19. Time Limit:
a. Time limit for completion of one job is 06 Days per Heater from the date of commencement.
b. The validity of this work order is 24 months from the date of commencement of the work order.
20. Time Limit Extension: This contract can be extended further for a period of 12 weeks or till
finalization of new contract whichever is earlier. If this contract is extended beyond time limit, the
contractor shall have to work in extended period till finalization of new contract and during such
extended period the rates will be payable at the existing contract rate or new rate whichever is
EW-273 PUR-F-006 RFQ-
21. If this contract is extended beyond time limit, the contractor shall have to work in extended period
till finalization of new contract and during such extended period the rates will be payable at the
existing contract rate or new rate whichever is less.
22. Penalty for Delay: If the work is not done as per specification given by the Corporation in
stipulated time in all respects, the penalty will be levied as per Corporation's rules.
Any delay that may take place in supply and / or erection, testing and commissioning activities
beyond contractual cutoff date / stipulated period in the order shall be subjected to penalty (not
liquidated damages) at the rate ½ % of the contract price / order price per week or part thereof
subjected to a maximum of 10% of the total contract value/ order value (i.e. End cost including
23. The GSECL reserve the right to carry out the work by another agency in case of poor /slow
progress of the work and expense incurred will be recovered from the party’s bill.
24. Performance Guarantee: The contractor has to give performance guarantee for towards defect
free operation & poor workmanship Three month from the date of commissioning. If any defect
observed within Three Months contractor shall have to attend it free of cost.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
ON STAMP PAPER OF Rs.300/-]
EMD BANK GUARANTEE FORMAT
FOR TENDER NO.__________
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
WHEREAS M/s. __________________________________________(Name and Address of the
Firm/company) having their registered Office at ________________________________(Address
of the Firm’s registered Office) (hereinafter called the “Tenderer”) wish to participate in
the Tender No._______________ for _________work (Supply / Erection / Supply & Erection Work,
etc.) of ______________________ (Name of the Material/equipment / work) for Gujarat State
Electricity Corporation Limited (hereinafter called the “Beneficiary”) and WHEREAS a
Bank Guarantee for Rs._____________ (Amount of Bank Guarantee towards EMD) valid till
____________ (mention here date of validity of this Guarantee which will be Six months from
the date of submission of bid of the tender) which is required to be submitted by the
Tenderer along with the Tender.
We,_____________________________________________(Name of the Bank & address of the
Branch giving the Bank Guarantee) having our registered Office at _____________________
(Address of Bank’s registered Office) hereby give this Bank Guarantee No.
_________________ dated ____________ and hereby agree unequivocally and unconditionally
to pay immediately on demand in writing from Beneficiary Gujarat State Electricity
Corporation Limited or any Officer authorized by it in this behalf any amount up to
and not exceeding Rs.____________(Amount of E.M.D.), (Rupees in words______________
________________________________________) to the said Gujarat State Electricity Corporation
Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the Tender/Bid/EOI or part thereof by the Tenderer within its validity or Non
submission of Performance Guarantee towards execution/supply period by the Tenderer
within 15 days from the date of issue of Letter of Acceptance by the Gujarat State Electricity
Corporation Limited would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked & encashed within its validity by the Beneficiary
in case of any occurrence of a default on the part of the Tenderer and that the encashed
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
_______________ (mention here the date of validity of Bank Guarantee) and shall not be
terminable by notice or by Guarantor for change in the constitution of the Bank or the
Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given,
conceded with or without our knowledge or consent by or between the Tenderer and
the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the Beneficiary (i.e.
GSECL) Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee
is restricted to Rs.__________(Amount of EMD) (Rupees __________________________________)
(in words). Our Guarantee shall remain in force till _____________ (Date of validity of the
EW-273 PUR-F-006 RFQ-
Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing
on or before ___________ (Date of validity of the Bank Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged
from all liabilities there under.
Please Mention here Complete Postal Signature of the Bank’s
Address of the Bank with Branch Code, Authorised Signatory with
Telephone and Fax Nos Official Round seal
NAME OF DESIGNATED BANKS : As per Annexure – I
EW-273 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards execution/supply period ( Security
Deposit ) as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of
the Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in
this behalf any amount up to and not exceeding Rs. _____________ (Amount of
Performance Guarantee towards execution/supply period ) Rupees
Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reason whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in force
until _______________ (date of validity of the Bank Guarantee).Unless demands or claims
under this Bank Guarantee are made to us in writing on or before _____________ (Date of
validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure - I
EW-273 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards Guarantee/Warranty period as per
Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of
the Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in
this behalf any amount up to and not exceeding Rs. _____________ (Amount of
Performance Guarantee towards Guarantee/Warranty period ) Rupees
Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reason whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in force
until _______________ (date of validity of the Bank Guarantee).Unless demands or claims
under this Bank Guarantee are made to us in writing on or before _____________ (Date of
validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure – I.
EW-273 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(Combined Performance Guarantees (PBG) towards Execution/Supply period and
Guarantee/Warranty period as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of
the Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No.
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in
this behalf any amount up to and not exceeding Rs. _____________ (Amount of Combined
Performance Guarantees (PBG) towards Execution/Supply period and Guarantee/Warranty
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reason whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________(Rupees
___________________________________________only). Our guarantee shall remain in force
until _______________ (date of validity of the Bank Guarantee).Unless demands or claims
under this Bank Guarantee are made to us in writing on or before _____________ (Date of
validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee
shall be forfeited and we shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure - I.
EW-273 PUR-F-006 RFQ-
Financial Department, GR.No. FD/MSM/e-file/04/2024/2859/DMO Dtd. 01/05/2025
[ To be revised as per GoG notification issued from time to time.]
List of Banks Notified by GSECL
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for period up to March 31, 2026. The
validity cut-off date in the GR is with respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
Name of Banks Name of Banks
1 AXIS Bank 22 South Indian Bank
2 A U Small Finance Bank 23 Standard Charter Bank
3 Bandhan Bank 24 Tamilnadu Mercantile Bank
4 Barclays Bank 25 Utkarsh Small Finance Bank
5 City Union Bank 26 YES Bank
6 CSB Bank 27 Ahmedabad Mercantile Co-Operative Bank
7 DBS Bank India Limited 28 Nutan Nagrik Sahakari Bank Ltd.
8 DCB Ban 29 Rajkot Nagrik Sahakari Bank Limited.
9 Equitas Small Finance Bank 30 Sarswat Co-Operative Bank Ltd.
10 ESAF Small Finance Bank 31 SBPP Co-operative Bank Ltd.
11 Federal Bank 32 SVC Co-Operative Bank Ltd.
12 HDFC Bank 33 The Cosmos Co-op Bank Ltd.
13 HSBC Bank 34 The Gujarat State Co-Operative Bank
14 ICICI Bank 35 The Mehsana Urban Co-Operative Bank Ltd.
15 IDBI Bank 36 The Surat District Co-operative Bank
16 IDFC First Bank 37 The Surat Peoples Co-operative Bank Ltd.
17 Jammu and Kashmir Bank 38 The Kalupur Commercial Co-operative Bank
18 Jana Small Finance Bank 39 The Panchmahal District Co-operative Bank
19 Karnataka Bank 40 The Baroda District Co-operative Bank
20 Karur Vysya Bank 41 Baroda Gujarat Gramin Bank
21 Kotak Mahindra Bank 42 Saurashtra Gramin Bank
EW-273 PUR-F-006 RFQ-
GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following
Safety Rules. Concern principle contractors are responsible for informing & observance of
these rules by their supervisors/contract workers as well as the owner/supervisors/ workers
of sub-Contractors engaged, if any, by them for the work contract awarded to them. Prior to
commencement of the work, Contractor shall have to submit a written assurance on their
letterhead to the concerned Sectional Head / Engineer-in-charge that they have thoroughly
gone through these Rules, have educated their employees / workers of their sub contractor
and will strictly observe the said Rules while execution of work under work contract awarded
to them. They will have to indemnify the company for any loss or damage / accident / injury
to the company’s property / employee or employee of their own in default of non - observing
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager
as per Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass
format as per Aadhar card /Election card id proof & to follow the gate pass issue
procedure through concern department EE & SE, Security Officer, LWO/IRO/DGM,
Factory Medical Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only
for three days with prior permission of Factory Manager only. More than three days,
Permanent photo gate pass procedure shall be completed by contract agency for their
contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of
Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all
contractor workers before commencement of work & examination responsibility shall be
taken by contractor as well as concerned Head of Department .Pre-employment &
Periodical medical examination of contractor workers shall be carried out in form no.32
from GSECL Factory Medical Officer after every six (06) months of contractor with their
contractor workers. Contractor shall be fulfilled all health requirements before
commencement of work. After completion of medical examination in form no.32/33,
GSECL Factory Medical Officer shall be signed in contract worker gate pass procedure
(04) If work executed outside factory premises, Principle Contractor shall be registered
compulsory under The Building & Other Construction Workers (Regulation of
Employment and condition of service) Act, 1996 and The Gujarat Building & Other
Construction Workers (Regulation of Employment and condition of service) Rules,
before execution the ”building or other construction work” means the construction,
alteration, repairs, maintenance or demolition, of or, in relation to, buildings, streets,
roads, railways, tramways, airfields, irrigation, drainage, embankment and navigation
works, flood control works (including storm water drainage works), generation,
transmission and distribution of power, water works (including channels for
distribution of water), oil and gas installations, electric lines, wireless, radio, television,
telephone, telegraph and overseas communications, dams, canals, reservoirs,
watercourses, tunnels, bridges, viaducts, aqueducts, pipelines, towers, cooling towers,
transmission towers and such other work as may be specified in this behalf by the
appropriate Government, by notification but does not include any building or other
construction work to which the provisions of the Factories Act, 1948 (63 of 1948), or the
Mines Act, 1952 (35 of 1952), apply.
(05) Contract worker gate pass will issue after completion of safety induction 3D animation
movie & Training record is to be maintained in IMS/OHSAS training format by TK
EW-273 PUR-F-006 RFQ-
(06) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked
the issue PPE to contract workers as per nature of job, Form no.10 of lifting tools and
tackles, Driving license, Electrical contractor license, Electrical trade qualifications,
Safety induction training, SOP, supervisor qualifications etc. After fulfillment of all
Safety compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract worker
Gate pass procedure format.
(07) Work Contract shall be completed by principle contractor/agency/person who is
awarded the work order. Subletting of contract shall be allowed only if prior approval of
Power station chief before execution of work. Contractor/agency shall be submitted the
entire subletting contract documents with gate pass application through concern
department EE & SE, LWO/DGM, Safety Officer/Dy.Safety Officer & Factory Manager.
(08) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply
gate pass by agency/party with latest renewal from Chief Electrical Inspector,
Gandhinagar- Gujarat. Electrical License photocopy shall be checked by Concerned
HOD of Electrical Department/Electrical Safety Officer/Dy.Safety Officer/ Safety
Officer/Factory Manager.
(09) As per nature of job/work, Qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by
contract agency & qualification certificate with experience certificate shall be submitted
to concern EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety Officer/Factory Manager
at the time of apply gate pass.
(10) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out
the work on electrical lines and Apparatus, Contract person/worker possesses a
certificate of competency or electrical work permit, issued by the Appropriate
Government. That means, Electrical trade Qualification of contract worker/person like
ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect)
shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety
Officer/Factory Manager at the time of apply for photo gate pass procedure.
(11) As per nature of job/work & during capital overhauling work /Annual overhauling work
/24X7 round the clock work/major shut down work, Qualified Safety
Officer/Manager/Supervisor (BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in
Industrial Safety) shall be engaged by contractor during dangerous
operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness programme, SOP preparation with hazards
& its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(12) License of driver shall be submitted with gate pass issue application as per nature of
vehicles & to follow the Motor vehicle Act,1988,the Central Motor Vehicles
(Amendment) Rules,2016 as well as Gujarat Motor Vehicles rules,1989 & driver license
shall be checked every day by security shift in charge before entry in the Factory
(13) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent
person as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years
experiences. SOP will review & approve by concern JE/DE/EE/SE/Elect. Safety
Officer/Dy. Safety Officer /Safety Officer/Factory Manager before execution of work.
(14) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per
the job requirement. Do not work without use of required P.P.Es. Contractor is
responsible to provide standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked
standard/make in PPE issue format by concern JE/DE/EE/SE/Safety Officer/Factory
Manager. Personal Protective Equipments / Safety Gadgets suitable to give sufficient
protection against hazards involved in their work / job to their staff, as per the job
requirement and insist / enforce their workers to put on the same while at works.
EW-273 PUR-F-006 RFQ-
The ongoing work is liable to be stopped at any time if your contract workers/staffs
found working without P.P.Es. Following is the list of various P.P.Es (as per
ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 06 nos. of PPEs like Safety Shoes,
Safety Helmet, Safety goggles, Mask & Reusable Ear plug, hand gloves to their
workers/supervisor compulsory & it will check by concern section HOD & Dy. Safety
Officer /Safety Officer at the time of gate pass procedure.
Quality of PPE shall be approved from Safety Officer as per Indian Standard and
International Standard before executions of work or at the time of gate pass apply
List of safety equipments
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/ chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects,
with sharp edged objects, heat, hot metals/objects,
Oil/Chemical/water/heat/ electricity etc..
Electrical resistance etc.
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space
respirators with full face area
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
EW-273 PUR-F-006 RFQ-
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding
EN 12941:1998, class TH2 visor to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit
provides a constant airflow independent of filter
combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting
breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face
prevents particles and other contaminants from
entering the head top.
(15) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and allotment
of PPE list shall be submitted to Safety Officer, Dhuvaran on his letter head as per
below mentioned format by Contractor before commencement of work through
concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desi Name of Name of PPE IS Make Qt Unit Date Rec
no. of gnati Section :Code of PPE y of eivi
worke on under no. of issue ng
rs work PPE sign
Reusable Ear Pair
Safety Shoes Pair
(16) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet
of all contractor workers at entry gate of Factory Premises & shall entered contractor
workers with Safety Shoes & Safety Helmet with photo ID Gate Pass.
(17) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all
contractor workers on daily basis.
EW-273 PUR-F-006 RFQ-
(18) During the work execution, one trained & competent supervisor of agency should
always remain present at work site. Concern JE/DE of GSECL shall be supervised the
contract work as per SOP .
(19) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/
C&I/Environment survey/Chemical etc measuring /testing equipments/instruments
which are used during contract work shall be submitted before starting the work &
shall be checked by concern JE/DE/EE before starting work & it’s record shall be
maintained in concern section.
(20) The contractor shall take all the required safety measures prior to commencement of
work on dangerous substances, machineries or area at which cautionary notice is
displayed and obtain “Line Clear” or “Work Permit” through the concern Department /
Section JE/DE and shall be informed to concern section JE/DE for closed/ returned
after completion of work.
(21) Safety talk/Safety work instructions shall be given to contractor workers by concern
JE/DE regarding hazards of specific work, risk & it’s control measure (mentioned in
HIRA) before starting the job work and records shall be maintained for each & every job
(22) Display Safety instructions shall be strictly followed by all workers who are working in
factory premises.
(23) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by
contractor & contractor workers from Concern EE/Chief Chemist before starting of
chemical handling work.
(24) The contractor shall be checked & securely covered or securely fenced any opened fixed
vessel, sump, tank, pit or opening in ground or in floor which, by reason of its depth,
situation, construction or contents ,is or may be a source of danger before starting the
work each & every days or after interval/recess. Contractor supervisor shall be
informed to concerned HOD regarding any unsafe conditions.
(25) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses,
mobile phone etc are to be strictly followed by all workers who are working in factory
(26) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job,
remove all the inflammable material lying at or nearby worksite or cover it properly by
suitable protective covering. Also, special care shall be taken before carrying out such
job & see that all possible contributing factors to set fire shall be removed / vanished
prior to commencement of the work. Advance intimation shall be given to concerned
section / fire section to commence the work in fire prone areas. They should also keep
ready all the First Aid Fire Extinguishers / equipments & fire extinguishing media /
material like sand / water buckets or other appropriate equipment at such place.
(27) While carrying out work in confined space or inside vessel, obtain necessary “Confined
Space / Vessel Entry Permit” from concerned department prior to commencement of
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp
shall be used. For taking care of the persons working inside the confined space / vessel,
a supervisor / person capable to keep continuous watch on person(s) working inside,
assist them in case of emergency or arrange to get immediate outside help, shall remain
present at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants
/ passers etc shall remain available near entry point or the entry point shall be
cordoned by a barricaded tape with a cautionary notice. After completion of the works,
all the lids / covers / grills / grits opened, shall be re-fixed / re-placed in the original
position as it were prior to commencement of the work and leave the work place in safe
condition in all respect, so as to prevent accident to fellow workers.
EW-273 PUR-F-006 RFQ-
(28) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading
to plans or its auxiliaries, on which there is traffic movements or possible traffic
movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of
passage, prior permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading
tape & display suitable caution notice or keep a person to restrict / divert the traffic on
this route through other safe passage.
(29) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading
to plans or its auxiliaries, on which there is traffic movements or possible traffic
movements in case of emergency. Such passages are meant for safe escape in the event
of emergency. If it is utmost necessary to carry out work in such area with blocking of
passage, prior permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading
tape & display suitable caution notice or keep a person to restrict / divert the traffic on
this route through other safe passage.
(30) Prior to use power / electrically operated hand tools / equipments / machines / gadgets
like welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it
only if it is found safe to use. Do not use defective, unsafe or improperly maintained
The electrical power supply required to run such equipments shall not be taken directly
at their own but shall be obtained through concerned Electrical Maintenance
Departments or their authorized persons or under their observations / guidance only.
The Electrical Section shall provide temporary electrical connection up to contractor’s
Mains Board on which it is compulsory to install mains switch, ELCB & fuses of
adequate capacity. All such equipments shall invariably be earthed adequately to
prevent electrical shock, sparking, short circuit etc. Power cord to be used shall be of
adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for
three phase power connections. The plugs, receptacles, pins, holders etc shall be of
adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used
during work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has specific
prescribed life span shall not be used in any case if its expiry date is over.
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by
Electrical contractor for safe use in areas where hazardous, flammable, or combustible
vapors, liquids, dusts, or residues may be present in Gas Based power plant and list of
tools and tackles shall be submitted with technical bid. Non-Sparking Non-Magnetic
electrical hand tools and tool kits shall be checked by JE/DE before commencement of
Electrical work.
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift,
mobile crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye
bolts or any fixtures), it shall be checked and used only if found safe to use. Also,
ensure that these are tested, examined & certified in form no.10 by Competent Person
as per the Factory act-1948 & Gujarat Factories Rules and its validity do not expire.
Further, it shall be fixed properly and firmly prior to lifting the weight. Valid Test
certificate of all Lifting machines used by Contractor to be submitted to Dy.Safety
Officer/ Safety Officer before commencement of work through concerned EE/SE.
EW-273 PUR-F-006 RFQ-
(33) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity.
Obtain the work permit when working at height. While climbing on such scaffolding or
working on any structure at height, use of full body safety belt /full body hardness with
double lanyard & Fall arrestor & Helmet is compulsory. It is also necessary to fasten
chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant activities /
works except the work assigned to them, shall not loiter in the areas other than their
work jurisdiction, as well as shall not temper / operate / touch the
machineries/equipments/auxiliaries with which they are not concerned. Also, the
contractor shall strictly instruct their staff for not to sit or take rest at/near/below
running plants, auxiliaries, systems or any place which is risky, hazardous & prone to
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking
due care. To handle / shift such cylinders a special trolley /cage meant for it must be
used but in no case it should be rolled.
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour
generated area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall
be provided on each vehicle by party/agency and it will check by shift security in charge
before entry of vehicles in the factory premises.
(37) No women or young person shall be employed or permitted to work in Lead-compound
area like battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any part of a
prime mover or of any transmission machinery while the prime mover or transmission
machinery is in motion. Examination or operation of motion machinery shall be made
or carried out only by a specially trained adult male worker wearing tight fitting clothing
as per section 22 of factories act
(39) In all risky job, before start the work, contractor should obtain General Safety Work
Permit through concerned section from Shift –in-charge well in advance.
(40) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the Fire Station
Mobile No as well as Station Fire Officer or Emergency Control room no which is
displayed at prominent place of factory like Main Security Gate, All unit control room,
Canteen area, Safe Assembly points, Fire Station, All security gates, Occupational
(41) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No.
21 & ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety
In case of any electrical accident, it shall immediately be reported to Electrical Safety
Officer through concern Sectional Head / Engineer. The prescribed Electrical accident
form no. A as per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat
Factories rules shall be filled up by concern department JE/DE with written consent of
contractor. The Form may be obtained from concerned Electrical section or Electrical
Safety Officer. Electrical accident investigation shall be carried out by Electrical Safety
Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate
of injured person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety
Officer/Safety Officer/Electrical Safety Officer then after injured person may allow for
(42) For any incident occurred but have no injury to any persons should also reported as per
GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss Incident.
(43) Safety penalty shall be imposed against Offences by contract workers: If any
contract worker worked in a factory contravenes any provision of Factories act or any
EW-273 PUR-F-006 RFQ-
rules or orders made there under ,imposing any duty or liability on workers,
contractor/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at Rs.1000/- per day
height, confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not Rs.750/- per person
(iv) Welding work without flashback arrestor/double Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature Rs.1000/-per day
of job like mechanical, electrical, civil, C&I,
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / Rs.2000/- per
tackles (like C.P.Bs., Hook chooks, winch, forklift, equipment
mobile crane, EOT crane etc) & its attachments
(like D-shackles, slings, U-clamps, Eye bolts or
any fixtures) in Form No.10 of Gujarat Factories
(ix) Work without Double lynyer Safety belt during Rs.3000/-per person
working at Height work, work without anchoring
in hook/line line
(x) Work without 24 Volt supply in Confine space Rs.3000/-per person
(xi) (a) Grinding machine used without safety Rs.500/-per
guard/machine guard equipment / per set
(b) unsafe welding machine like open body, Knob
without insulation, connection without lug
(c) damaged welding cables/gas pipelines
(d) welding work doing without welding blanket,
(e) electrical supply without 3 pin plug/Industrial
(f) use of damaged electrical wire for lighting/
(g) use of lighting lamp without cage,
(h) use of open halogen tube,
(i) use of damaged PPEs/use of non Standard
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB, etc.
During plant visit/supervision of concern JE/DE/EE, SE, Safety Officer/Dy.Safety
Officer, Electrical Safety Officer, Factory Manager, If they will observed any safety
violations as per CO circular/statutory requirements then they must impose Safety
Penalty through office note directly against contract workers/ contract agency and Office
Note process through proper channel to concern Sectional head and Account head for
recovery purpose. Photograph/CCTV footage is to be put up with penalty note by
imposing officer.”
EW-273 PUR-F-006 RFQ-
(44) Party will damage any fire equipments or property or machinery in factory during
execution of work, total damage cost will be recovered from party RA bill and recovery
Office note put up by concern HOD.
(45) All the relevant labour and industrial laws shall also be followed compulsorily.
(46) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces,
scrap etc. are to be removed by contractor and scrap shall be deposited to scrap yard of
(47) For performance evaluation of contractor, safety factors of work accident, fire incident &
near miss accident will be considered. Steps can be taken to review the job assignment
up to cancellation for negligence.
(48) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the
provisions of The Factories Act-1948 & the Gujarat State Factories Rules-1963
(Amended up to date), The Electricity Act-2003 & rules, BOCW Act/Rules shall be
followed strictly. The contractor shall also obey the rules / regulations / instructions of
the local Competent Authority for safety & health requirements.
(49) The above rules shall be scrupulously followed and where required, Contractor
/contractor workers may contact to the Dy.Safety Officer/Safety Officer/Electrical
Safety Officer in case of any ambiguity or needs further guidance in this regard.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
Terms and Conditions regarding Labour Laws
During the entire period of the contract, the Contractor and his SubContractor shall at all
times comply with all applicable labour laws, rules, regulations, notifications, and bye-laws
issued by the Central Government, State Government, or Local Authorities. This includes all
existing laws as well as any amendments or new notifications that may come into force
during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following
Act/statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment & Conditions of
Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service) Act,
14. The Building And Other Construction Workers' Welfare Cess Act, 1996;
15. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall remain fully
responsible for ensuring compliance with all other applicable labour and welfare legislations,
rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to other
obligations prescribed under various labour laws, rules, and regulations issued by statutory
authorities such as the State Government or Government of India from time to time, which
the contractor shall strictly comply with during the execution of the contract.
1) The Factories Act,
The contactor should not deploy worker below the age of 18 years and above
years for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the provisions
of the Factories Act,
Payment of Earned Leave should be made monthly together with wages for
better compliance of law. The contactor shall maintain Earn Leave Register in
Form No. 19 as per the provisions of the said Act and submit the same on
All the written registers, Performa etc. shall be maintained up to date and kept
ready for inspection at any time or submitted on-time to the concerned
authorities as per applicability of the Acts by cotractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under Contract
Labour (Regulation & Abolition) Act from the appropriate authorities before
commencement of work. The contractor tor shall maintain a valid labour license
under the Contract Labour (Regulation and Abolition) Act for employing
necessary man power to be required by contractor.
EW-273 PUR-F-006 RFQ-
The contractor should not be allowed to engage fifty (50) or more contract
labourers without initiating to obtain the labour license under the Contract
Labour Act. (the said number i.e., fifty (50) or more includes Supervisor and
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through nearest Nationalized
Bank compulsory, preferably situated in the premises of TPS area in case of all
works contract. The Contractor shall supply copy of Bank Statement duly
stamped by the Concerned Bank as well as debited entry of amount displayed in
the contractors' own bank account as token of proof towards payment of Wages
through CLIM/prevailing system at relevant time. Apart from Payment of wages
through Bank, Contractors shall have to make all other payments like Advances,
Bonus, Leave Encashment etc. to their labours through bank only and cash
payment entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions
of the license. The contractor shall have to pay wages to workers as notified by
the Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of
their right to minimum wages payment on or before 7th of each month shall be
dealt as per the provision of labour laws. Recurrence of the same may lead to
cancellation of awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm
/Agency /Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are
covered under the provident fund scheme and employee's pension scheme and
their contribution must be remitted regularly to the concerned RPFC. The
photocopies of challan along with ECR in this regards should be submitted
regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement regarding
deductions against employees' provident fund and family pension scheme in
respect of each concerned employee' Provident fund and family pension scheme
at the rate of 12 %o of wages (or at the rates made applicable by the Government
time to time). The contractor's contribution and his workers contribution
towards provident fund and family pension scheme shall deposited by the
contractor with concerned PF Authorities.
5) Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the
Employees Compensation Act before starting the work. Employee Compensation
Insurance shall be obtained for all the workers engaged for the execution of
awarded contract. If any of the work is sub-letted the contractor shall ensure
that the sub-contractor take and provide workmen's compensation and
Employer's liability insurance for the labours engaged. Contractor is liable to
pay compensation in case of accidental injury arising out of and in the course of
employment as per the said Act and shall bear medical expenses due to on duty
6) The Payment of Gratuity Act,
EW-273 PUR-F-006 RFQ-
For better compliance, contractor shall pay amount of gratuity on a monthly
basis along with the payment of wages, calculated on a pro-rata basis per
month, which is equivalent to 15 days' wages for each completed year of service
for every worker. (* applicable to ARC / BRC works contract only)
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contactor in an accounting year,
bonus, in accordance with the provisions of this Act, For better compliance, the
contractor should pay bonus amount on a monthly basis along with wages
calculated on a pro-rata basis per month. Contactor has to submit the paid
bonus details of its worker in Form No. C as per the provisions of the said Act as
and when required by the Govt. Authority as well as by GSECL.
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity
Leave and other benefits as per the provision of the said Act.
9) The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1) d), happening
outside / inside the Factory premises the said act will be applicable and the
contactor or its sub-contactor shall be liable to comply with the provisions
framed there under.
10) The contractor shall give preference to existing or local contract workers for
engagement in the awarded contract and shall issue appointment orders to each
and every workers individually at the time of their engagement during the period
of contract and terminate the same at the end of the each contract.
Follow the mentioned procedure for each milestone for the execution of works
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare Officer /
Industrial Relations Officer for all formalities related to labour law compliance
before commencement of the contract and onward Labour Law compliance thereof,,
so that later no dispute will arise in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contactor’s employees
maintain strict discipline as regards security, methods of safe working etc., and not
to cause any hindrance to smooth running of power station or in execution of duties
by GSECL staff Any lapse in this regard will be viewed seriously and if lapse found,
contact is liable to be terminated. If any of contractor's staff is found unsuitable or
not behaving properly, the contractor shall have to remove such worker from the
work-site on demand by EIC. To maintain harmonious industrial relations amongst
contact labours is solely the responsibility of contractor. Any breach of the same will
be viewed seriously.
3. A digital system developed at the request of the agencies working at the premises of
GSECL, is to facilitate them for easy, efficient, effective management of data, gate
passes, attendances, medical records, Police Verification documents etc. related to
their employees / workers deployed for various works and services against work
order of GSECL.
4. On receipt of LOA and before commencement of work, authorized representatives of
the agency shall login in the CLIMS online portal / prevailing system at relevant
time and apply for registration of their employees / workers uploading all
information with required documents in digital form. Upon completion of due
verifications, clearance by EIC and HR departments, contracting agency will obtain
gate passes. GSECL will only consider documents like wage sheet duly accepted and
signed by individual workers, as per the engagement/deployment duration/hours of
EW-273 PUR-F-006 RFQ-
individual worker duly certified by the agency, being the employer, for the purpose
of payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and upto-date data of
their workers in the portal/ prevailing system at relevant time. All statutory
compliances under prevailing laws shall remain the responsibility of the contracting
agency. The agency shall indemnify/ GSECL against any liabilities arising from
non-compliance of legal provisions or inaccuracies in the data maintained by them
in the digital portal of CLlMS/prevailing system at relevant time.
5. The Contractor who intends to engage labours more than the specified limit under
law, then necessary - Form No. V under the Contract Labour (R & A) Act, 1970 or
Form No. VI under the Interstate Migrant worker (employment regulation) Act
as applicable is to be obtained for the purpose of obtaining Labour License from the
Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric
punching and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintaining of various registers and records required under the
Labour laws and contracts. No payment for such supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that specific
work order only and contractor should not divert the man power for any other work
order. If any work or part thereof is desired/required to sublet, the contactor shall
obtain the necessary permission of EIC in black and white well in advance which is
mandatory for considering the statutory documents of agency other than the agency
who awarded work order.
12) During Contractual Work under the progress:
1. All Contractors shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through Nearest Nationalized
Bank compulsory, preferably situated in the premises of power station area. The
Contractor shall supply copy of Bank Statement duly stamped by the Concerned
Bank as a token of proof towards payment of Wages through CLIMS / prevailing
system at relevant time.
2. All Contractors has to comply & maintain statutory documents / registers under
the provision of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS, the
contractor shall have to obtain work order wise separate Gate Passes and submit
the same with the documents of statutory compliance that too work order wise
every month to the User Department to enable their onward billing clearance.
13) CONTRACTORTO II\TDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every member,
officer and employees of the GSECL, also Engineer-in-charge and his staff against all
actions, proceedings, claims, demands, costs and expenses whatsoever arising out of or
in connection with the matter referred in above clauses and elsewhere and against all
actions, claims demands, cost and expenses which may be made against the GSECL by
any workman/ employees of contractor or any sub-contractor and or from any liability
any wise to any workman/employees of the contractor or sub-contractor under any
laws, rules or regulation having in force of law including but not limited to claims
against the owner under employee compensation Act, 1923. The Employee's Provident
Fund Act.l952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or
injury to any workmen or other person in the employment of the contractor or his sub-
contractor, and the contractor shall indemnify and keep indemnified the GSECL against
all such damage and compensation and against all claims, demands proceedings costs,
charges and expenses whatsoever in respect of or in relation thereto.
EW-273 PUR-F-006 RFQ-
The contractor shall at his own expense / risk and cost to comply with all the labour
laws as above-mentioned and keep the G.S.E.C.L. indemnified in respect thereof.
GSECL : shall be entitled /empowered to deduct directly from the bills, the amount to
be paid to engaged bonafide contract workers or the contract workers engaged by Sub-
contractor any sum or sums payable by main contractor / sub-contractor and which
sum/sums the Corporation is required to pay in capacity of Principal Employer on
account of the default of contractor in respect of all liabilities incurred out of non-
compliance regarding any provisions of Labour Laws and same amount shall be
recovered from the pending dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at present
and that may be famed by the G S E C L from time to time in connection with contracts
will be binding and acceptable to contractor. The above are some of the major liabilities
of the contractor in addition to other liabilities prescribed under the various labour laws
in force from time to time from Statutory Authorities like State Government /
Government of India, which the contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as provided to other
statutory Government authorities and will be notified to Engineer In-Charge time to
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour Laws
and EPF in CLIMS / prevailing system at relevant time. Required documents shall be
uploaded by the contractor in existing portal /prevailing system at relevant time
invariably each month to Engineer In-Charge for onward process and smooth clearance
by HR Department.
List of documents required for gate passes of contract workers through clims /
prevailing System.
Sr. Description of documents attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 insurance Policy as per subject of work order under the Workmen
Compensation Act,
4 Contract agreements/ subletting work contract documents with
5 Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
6 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to submit
‘Declaration cum Indemnity Bond’ on Rs. 300/- Non-Judicial stamp paper in prescribed
Performa (Annexure- ‘B’) with Agreement and Indemnity Bond before the commencement
of the contract.
EW-273 PUR-F-006 RFQ-
DECLARATION CUM INDEMNITY BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at_____________________
(mention location) by M/S. ________________________________________________ having its Reg.
office at___________________________(hereinafter referred to as “Contractor” which expression
Shall unless it be repugnant to the context or meaning thereof, be deemed to mean and include
their respective assigns, successor, executors, subcontractors and/or administrators) of the ONE
PART in favour of M/S Gujarat State Electricity Corporation Limited having its power Station
at Gandhinagar Thermal Power Station (hereinafter referred to as the “Company”), which
expression shall unless it be repugnant to the context or meaning thereof be deemed to mean and
include its assigns, successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of
_____________________________________dated_____________“hereinafter called the “Contract”);
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall
comply with all the provisions of the Labour& Industrial Laws, as may be applicable from time to
time for the discharge and completion of the works and completion of the Works and Services
covered under said Contract Labour (R & A) Act 1970, Child Labour (Prohibition and Regulation)
Act 1986, The Employees Provident Funds & Miscellaneous Provisions Act, 1952, Employees
State Insurance Act 1948, Minimum Wages Act, 1948, Payment of Bonus Act, 1965, Payment of
Wages Act, 1936, Employees Compensation Act, 1923, Factories Act, 1948 and other Labour
Laws, Rules, Notifications and Codes which are at present applicable to the contractor and which
may be applicable during the tenure of the contract (hereinafter referred as the ‘Laws’).
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to
this effect and has agreed to indemnify and Company, it’s Directors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges, penalties,
fines, expenses, losses, damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse,
delays, misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors,
subcontractor and/ or administrators shall be construed to be have been done by the
contractor and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to the
condition of execution of this Declaration cum Indemnity bond, the Contractor declares and
represents to the Company that the Contractor has obtained all Statutory registrations,
Certificates, licenses and approvals required under the Laws enabling the Contractor to
execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or non-compliance of any
such „Laws‟ by the Contractor in connection with the Performance of the contract, the
Contractor shall bear all the resultant whatsoever liability(ies), if any arising out thereof and
that the company, its Directors, Officers and employees, representatives, shall not be liable
for any such liability(ies). The Contractor agrees to indemnify and keep the Company and its
Directors, Officers and employees, representatives indemnifies, defend and hold harmless,
against all losses, costs, damages, claims, penalties, interest, expenses, demands, fines, legal
liability, causes of action, injury to persons, suits etc., which may be suffered, incurred,
undergone and / sustained by the Company including the Costs and expenses that may be
incurred in defending any such liability(ies) claim(S), Proceeding (S) etc. that maybe made or
taken or taken or arise on the same by any Person, body, authority, government, judicial /
quasi - judicial authority due to the failure or non-compliance of any such laws and rules
EW-273 PUR-F-006 RFQ-
there under (including any amendments in acts, laws, statutes & rules there under) of
whatsoever kind and nature arising out of or in any way connected with, whether or not such
acts or omissions are actual or alleged, active or passive with regard to the discharge of the
4. The Contractor further declares that in case of any suit / claim / right / damages /
compensation / fine / levy / charges / expenses / losses / penalties / costs raised by the
third party, including contract labours engaged by the contractor, he shall join such
proceedings in such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims, suits,
demands, decrees, expenses that the Company may suffer to the fullest satisfaction of the
Company and if the Contractor fails to make good the same then the Company shall have the
right to recover the same and or any other loss sustained, without any restriction or
limitation, together with any other incidental expenses, costs, and all incidental logistic
expenses etc that may be suffered by the Company from the Contractor and the Contractor
hereby further confirms and declares that this Declaration cum Indemnity Bond is
irrevocable and shall be final and binding on it / him heirs, executors, administrators, legal
representatives, successors, subcontractors and assigns, wherever the context applies. any
claims, demands, shall be adjusted against any amount due and payable to the Contractor
and the Company shall have the right to withhold any amounts due and payable to the
Contractor, till the settlement of such claims, disputes to the Contractor towards discharge of
such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India and any
dispute between the parties with regard to this Declaration cum Indemnity Bond shall be
resolved through the dispute resolution process mentioned in the General Conditions of the
Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
In presence of Witness
Name & Address of Witness Signature
Residential Address:
Residential Address:
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FORTHE GUIDANCE OF CONTRACTOR
Notwithstanding anything contained to the contrary in the specification or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on the
contractor and any change of variation expressed or implied however made in the said
conditions shall not be however valid or operative unless expressly sanctioned by the
corporation The contractor shall be deemed to have fully informed himself and to have
special knowledge of the provisions of the conditions of contract herein contained.
1. All works proposed to be executed by contract shall be notified in one of the English and
one of the vernacular local daily newspapers stating the work to be carried out as well as
the date for submitting and opening tenders and time allotted for carrying out the work
also the amount of earnest money to be deposited with the tenderer and the security
deposit to be deposited by the successful tenderer.
2. Copies of the specifications, designs drawings, estimated rates. Schedule rates and any
other documents required in connection with work which will be signed by the Executive
Engineer for the purpose; of identification shall be open for inspection by the contractors
at the office of the Executive Engineer during office hours.
3. Where the works are proposed to be executed according to the specification recommended
by a contractor and approved by a competent authority on behalf of the Gujarat State
Electricity Corporation Ltd. Such specification with designs and drawings shall form part
of the accepted tender.
3 The tender and receipts for payments made on the account of any work, when executed
by a firm, should be signed by all the partners except where the contractor are described
in their tender as firm in which case the receipt shall be signed in the name of firm
including the Partners or some other persons; having authority to do so.
5. Any person who submits tender at percentage rate shall fill up the usual form stating
what percentage above or below rates specified he is willing to undertake the work. Only
one rate or such percentage on all the estimated rates or scheduled rates shall be
6. Tenders which propose any alteration in the work specified in the form invitation to
tender or in the time allowed for carrying out the works or which contain any other
conditions of any sort, will be liable to rejection.
7. No single tender shall include more than one work. but contractors who wish to tender,
for two or more works, shall submit a separate tender for each work. Tender shall have
the name and the number of the works of which they pertain be subscribed on the
8. The Executive Engineer or his duly authorized assistant will open tenders in the presence
of any intending contractors who may be present at the time and will enter the amount of
the several tenders in a comparative statement in a suitable form. In the event of tender
being accepted the contractor shall thereupon, for the purpose of identification, sign
copies of the specifications and other documents. In the event of tender being rejected the
officer (Executive Engineer ) shall authorize the paying officer to refund the amount of the
earnest money deposited to the contractor making the tender on his giving for the return
9. The officer competent to dispose off the tenders, shall have the right of rejecting all or any
of the tenders without assigning any reasons thereof.
10. No receipt for any payment alleged to have been made by a contractor in regard to any
matter relating to tender of the contract shall be valid and binding on the corporation
unless it is signed by the Executive Engineer.
EW-273 PUR-F-006 RFQ-
11. The memorandum of work to be tendered for and the schedule of materials to be supplied
by the Gujarat state Electricity corporation Ltd. and their rates shall be filled in and
completed by the office of Executive Engineer before the tender form is issued if a form
issued to an intending tenderer has not been so filled in and uncompleted he shall
request the said office to have this done before he completes and delivers his tender.
12. All work shall be measured, meet by standard measure and according to rules and
custom and usual in the use in the Gujarat state electricity corporation Ltd. and no
proposals to adopt alternative method will be accepted. The Executive Engineer's decision
as to what is the usual method in use in the Gujarat state Electricity Corporation Ltd.
shall be final.
13. Every contractor shall except the registered contractor on the approved list of the
corporation produce along with his tender a solvency certificate from the collector of the
District within which he resides or a bankers Certificate of his financial stability if he fails
to produce such a certificate his tender will not be considered.
14. All correction and addition or pasted slips should be initiated.
15. Tenderer shall be deemed to have full knowledge of all relevant documents site conditions
etc. whether inspected or not by him.
16. Submissions of a tender by a contractor implies he has read the instruction and
conditions of contract and has made himself aware of the scopes and specification of the
work to be done & of the conditions and rates at which stores etc. will be issued to him
and local conditions and other factors bearing on the execution of the work.
17. Under no circumstances shall any contractor be entitled to claim enhanced rates for any
items of contract without prior sanction of the competent authority.
18. These rules and directions shall form part of the contract.
I/We hereby tender for the GUJARAT STATE ELECTRICITY CORP.LTD. (herein referred as
"Corporation") of the work specified in the under written memorandum within the time
specified in Scheduled B (memorandum showing items of work to be carried out) and in
accordance in all respect with the specifications design drawing and instructions in writing
and as per annexed conditions of contract and agree that when the materials for works are
provided by the corporation such materials and rates to be paid for them shall be as Provided
in schedule A hereto.
(a) General description of work.
(b) Estimated cost.
(c) Earnest money.
(d) Security deposit:
(1) Party shall have to pay security deposit(if applicable) in the form of Bank
Guarantee/ Demand Draft in favour of GSECL payable at Gandhinagar within 10 days
of date of issue of Letter of Intent.
(2) Time allowed for the completion of work from date written order to commence. Should
this tender be accepted I/we hereby agree to abide by and fulfill all the terms and provision
of conditions of contractor annexed hereto as applicable and in default thereof forfeit and
pay to the corporation the sums of money mentioned in the said conditions.
Receipt No. date from the GUJARAT STATE ELECTIRICITY CORP. LTD. in
respect of sum of Rs. (The amount to be specified in figure & words,) Is herewith forwarded
representing the earnest money (the full value of which is to be absolutely forfeited to the
CORPORATION l/We not deposit the full amount Deposit of the said conditions/otherwise
the said sum of Rs. Shall be refunded on surrendering the original receipt.
EW-273 PUR-F-006 RFQ-
Signature of the Contractor Address of the Contractor
Signature of witness Address of Witness
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity
Corporation Ltd.
The Chief Engineer (Gen).
Superintending Engineer
Executive engineer
Or his duly authorized assistant.
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD, GANDHINAGAR
TENDER & CONTRACT FOR WORKS
CONDITIONS OF CONTRACT
(a) The “contract” means the documents forming the tender and acceptance thereof together
with the document referred to therein or individual work order in the case of term
contracts including these conditions schedules and or additional conditions attached to
the form of tender or individual works, order, rate schedule the specifications and the
drawings and all these documents as applicable taken together shall be deemed to form
(b) The “Tender Document” means the form of tender the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued on the contractors
for the purpose of preparing tender.
(c) The expression "Works" or 'work when used in the condition of contract shall, unless
there be something in the subject or context repugnant to such construction means the
work or the work contracted to be executed under or in virtue of the contract whether
original or altered.
(d) The "Contractor” means the individual or firm or company. Whether incorporated or
not, undertaking the works and shall include his or its legal personal representatives
successors and permitted assignees.
(e) ”Corporation” means Gujarat state Electricity Corporation Ltd. and the "Accepting
Officer" means the officer who is authorized to sign and signs the contract on behalf of
the corporation.
(f) The letter “EE" means Executive Engineer who in the case of measurement and lump
sum contracts directs the contract and the letters S.E. mean Superintending Engineer
and "CE(G)" means Chief Engineer (Generation), who administers and in the case of the
term contracts directs the contract.
(g) 'The Engineer-in-charge" means all officers of the CORPORATION appointed by the Chief
Engineer (Gen), to supervise the works or part of the works.
(h) "Approved" and "Directed" means the approval or direction of the Chief Engineer (Gen), or
the Superintending Engineer or the person deputed by him for the particular purpose.
(i) B.S. means the "British Standards" as issued by the British Standard Institution. "A.S.”
means the “American Standards" as issued by the "American Standards Institution" and
"I.S." means the “Indian Standards" as issued by the Indian Standards Institution.
Wherever the above mentioned abbreviations are referred to in the specifications
and/or work orders, they mean the addition with all amendments current at the
date of issued of tender document of work orders.
In case of measurement and terms of contracts "Specifications" mean those contained in
Gujarat State Electricity Corporation Ltd. Schedule together with any amendments etc.
embodied in the tender documents “Drawing” refer to those accompanying the tender
documents and/or any work orders referred therein.
(j) The “Contract Sum" means the sum accepted or the sum calculated in accordance with
the prices accepted in the tender and/or the contract rate as payable to the contractor
for the full and entire execution and completion of works.
(k) "The date for completion" is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work orders and the
tender documents or any subsequent agreed amendments thereto.
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
1. Security Deposit:
The contractor shall within 10 days from the date of issue of letter of intent pay the security
deposit for the performance of the contract.All damages, costs, charges, expenses and other
sums which may be or may become due to payable by the contractor to the CORPORATION
under the terms of the contract may be deducted from the cash the proceeds of sale of the
securities so deposited (which the officer or person to whom the same may be endorsed as
aforesaid is hereby authorized to sell that purpose) of from the interest of any such securities
or from any sums or which may become due to the contractor by the CORPORATION whole
or the balance unapplied as aforesaid of cash securities so deposited being repaid or
transferred and returned as may be to contractor after the date on which the final bill is paid
or after the expiry of the date up to which the contractor has to maintain the work in good
order whichever is later.
2.Compensation for the delay :
The time limit allowed for carrying out the work as entered in the tender shall strictly
observed by the contractorand shall be reckoned from the date on which the order to
commence the work is given to the contractor. The work shall throughout the stipulated
period of contract be proceeded with all due diligence (time being deemed to be the essence of
contract) and for delay the contractor shall pay compensation an amount equal to half
percent per one week for the Contract value or as per the decision of the Competent
Authority of the GSECL..
3. Action when whole of Security Deposit is forfeited;
In any case in which under any clause of this contract the contractor shall have tendered
himself to pay compensation amounting to the whole of his security deposit (whether paid
sum or deducted by installments) or in the case of abandonment to the work owing to
serious illness/ death of the contractor or any other cause, the Executive Engineer on behalf
of the corporation shall have powers to adopt (a) below and any of the following causes
under (b) and (c) as he may deem best suited to the interest of the corporation.
To rescind to the contract (or with rescission notice of 10 days in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence and in
that case the security deposit of contractor shall stand forfeited and be absolutely at the
disposal of the corporation.
(b) To employ labor paid by the corporation to supply materials to carry out the works, or any
part of the works debiting the contractor with the cost of the labor and the price of the
materials (as to the correctness of which cost & price, the certificate of Executive Engineer
shall be final & conclusive against the contractor) and crediting him with value of the work
done. In all respect in the same manner and at the same rates as if it had been carried out by
the contractor under the terms of this contract and in that case the certificate of the
Executive Engineer as to the value the work done shall be final and conclusive against the
(c) To order that the work of the contractor be measured up and to take such part thereof as
shall be unexecuted out of his heads and to give it to another contractor to complete in which
case any expenses which may be incurred in excess of the sum which would have been paid
to the original contractor if the whole work had been executed by him (as to amount of which
excess expense the certificate in writing of the Engineer shall be final, conclusive and shall be
paid by the original contractors) and shall be deducted from any money due to by the
corporation under the contract or otherwise from his security deposit of the proceeds sale
thereof or a sufficient part thereof.
In the event of the above causes being adopted by the Executive Engineer the contractor
shall have no claim to compensation for any loss sustained by him by reason of his having
purchased or procured any materials or entered into any engagement or made any advances
on account of or with a view to the execution of the work or the performance of the contract.
And in case the contract shall be rescind under the provision aforesaid the contractor shall
EW-273 PUR-F-006 RFQ-
not be entitled to recover or be paid any sum for any works thereof actually performed by
him under this contract unless and until the Executive Engineer shall have certified in
writing the performance of such work and the amount payable to him in respect thereof and
he only be entitled to be paid the amount so certified.
4. Notice for Unsatisfactory Progress :
If the progress or a particular portion of the work is unsatisfactory the Executive Engineer
whose decision shall be final shall not withstanding that the general progress of work is
satisfactory be entitled to take action under Clause 3(b) after giving the contractor 10 days
notice in writing and the contractor will have no claim for compensation for any loss
sustained by him owing to such action.
5. Action in the case of Default by Contractor:
If any case in which any of power conferred upon the Executive Engineer by Clauses 3 and
hereof shall have exercisable and the same shall not have been exercised, the non-exercise
thereof shall not constitute a waiver of any of the conditions hereof and such powers shall
notwithstanding be exercisable in any further case of default by the contractor for which by
any hereof he is declared liable to pay future compensation shall remain unaffected in the
event of the Executive Engineer taking action under sub-clause (a) or (c) of Clause 3 he may,
if he so desires take possession of all or any tools plant materials and stores in so upon the
work or the site thereof belonging to the contractor or procured by him and intended to be
used for the execution of the work or any part thereof paying for allowing the same in
account at the contract rates or in the case of a contract rates not being applicable of current
market rates to be certified by the Executive Engineer whose certificate thereof shall be final.
In the alternative the Executive Engineer may by notice in writing to the contractor or his
clerk of works, foreman or other authorized agent require him to remove such tools Plant
materials or stores from the premises within a time to be specified in such requisition the
decision to the contractor failing to comply with any such requisition the decision of the
Executive Engineer as to the expense of any such removal and the amount of the proceed
and expense of any such shall be final and conclusive against the contractor.
6. Extension of Time Limit :
If the contractor shall desire an extension of the time limit for completion of the work on the
ground of his having been unavoidably hindered in execution or any other ground he shall
apply in writing to the Executive engineer and the executive Engineer may, if in his opinion
there are reasonable grounds for granting extension recommend such extension as he thinks
necessary or proper. The decision of the competent authority in this shall be final.
7. Completion Certificate
On completion of the work the Contractor shall be furnished with Completion Certificate by
the Executive Engineer of such completion but no such certificate shall be given nor shall be
the work of considered to be complete unit works are taken over and/or duly tested and put
to operation as the case may be nor until the work have been measured by the Engineer in
Charge or where the measurements have been taken by his subordinates until they have
received the approval of the Executive Engineer the said measurements being binding and
conclusive against the contractor.
8. Effect of the Certificate :
No payment shall be made for any work estimated to cost less than Rs. 1,000 till after the
whole of said work shall have been completed and certificate of completion given. But in the
case of works estimated to cost more than Rs. 1,000 contractor shall on submitting a
monthly bill thereof to be entitled to receive payments propionate to the part of the work
them approved and passed by the Engineer-in-charge whose certificate of such approval and
a passing of the sum so payable shall be final and conclusive against the contract of all such
intermediate payment shall be regard as payment by way of advance against the final
payment only and not as payments for work actually done, completed and shall not preclude
the Engineer-in-charge from requiring bad, unsound, imperfect or unskillful work to be
removed and taken away and reconstructed or re erected not shall any such payment be
considered as admission of the due performance of the contractor any part thereof in any
EW-273 PUR-F-006 RFQ-
respect of the accruing of the claim nor shall conclude, determine or effect in anyway the
otherwise or in any other way vary or affect the contract. The final settlement and
adjustment of the accounts otherwise or in any other way vary or affect the contract. The
final bill shall be submitted by the contractor within one month of the date fixed for
completion of work, otherwise, the certificate of the Engineer-in-charge of the measurement
and of total amount payable for the work shall be final and binding on all parties.
and of total amount payable for the work shall be final and binding on all parties.
9. Payment to Contractors:
The rates for several items of works estimated to cost more than Rs. 1000 agreed to within
shall be valid only when the item concerned is accepted having been completed full in
accordance with the sanctioned specification. In case, where the items of the work are not
accepted as so completed the Engineer-in-charge may make payment on account of such
items at such reduced rates as he may considers reasonable in the preparations of final or
running accounts bills.
Bills shall be submitted by the contractor each month on or before the date fixed by the
Engineer-in-Charge for all works executed in the previous month and the Engineer-in-
Charge shall take or cause to be taken the requisite measurement for the purpose or having
the same verified and the claim so far as it is admissible shall be adjusted. If, possible,
within ten days from the presentation of the bills, If the, contractor does not submit the bill
within the time fixed as aforesaid the Engineer-in-Charge may depute a subordinate to
measure up the said work in the presence of the contractor or his duly authorized agent
whose counter signature in the measurement list shall be sufficient warrant and the
Engineer-in-Charge may prepare a bill from such list which shall be binding on the
contractor in all respects.
11. Supply of Materials to Contractor:
If the specification of the estimate work provides for the use of any special description of
material to be supplied from the corporations Stores or if it is required that the contractor
shall use certain stores to be provided by the Engineer-in-Charge (such material and stores
and the prices to be charged thereof as hereinafter mentioned being so far as practicable for
the convenience of contractor but not so as in any way to contro1, the meaning or effect of
this contract specified in the schedule or memorandum hereto annexed) the contractor shall
be supplied, with such materials and stores as may be required from time to time be used by
him for the purpose of the contract only and the value of the full of materials and stores so
supplied shall be cut of or deducted from any such item due or thereafter to become due to
the contractor under the contract or otherwise or from the security deposit or the proceeds of
sale thereof if the deposit is held in Government securities the same or a sufficient portion
thereof shall be sold for the purpose. All materials supplied to the contract or shall remain
the absolute property of corporation and shall on account be removed from the site of the
work and shall at time be open to inspection by the Engineer-in-charge. Any such materials
unused and in perfectly good condition at time of completion or determination of the contract
shall be returned to the corporation stores if the Engineer-in-Charge so requires by notice in
writing given under his hand but the contractor shall not be entitled to return any such
materials supplied to him as aforesaid but remaining unused by him or for any wastage in
damage thereto.
The contractor shall be responsible for the loss, destruction or deterioration of the material
stores or articles supplied to him by the corporation even if such loss, destruction or
deterioration has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property.
12. Works to be executed in accordance with Specifications, Drawings, Orders etc.:
The contractor shall execute the whole and every part of work in the most substantial and
workmanlike manner and both as regarding materials and in every other respect in strict
accordance with the specifications, the contractor shall also confirm exactly , fully and
faithfully to the designs, drawings and instructions in writing relating to the work signed by
the Engineer-in-Charge and lodge in his office and to which the contractor shall be entitled
EW-273 PUR-F-006 RFQ-
to have access for the purpose of inspection at such office or on the site of the work during
office hours and the contractor shall; if he so requires, be entitled at his own expense to
make or cause to be made copies of the specification, and of all such designs, drawings and
instruction as aforesaid .
13. Alterations in Specifications and Designs not to invalidate Contracts:
The Executive Engineer shall have powers to make any alterations, in or addition to the
original specifications designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out-the
work in accordance with any instruction in this connection which may be given to him in
writing signed by the Engineer-in-Charge and such alterations shall not invalidate the
contract. Any additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the same
conditions in all respect on which he agreed to do the main works, and at the same rates as
are specified in the tender for the main work.
Where, however, the work is to the executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority. The
alteration above referred to shall be within the scope of such designs, drawings and
specifications appended to the tender.
14. Rates for Works not entered in Estimate or Schedule of Rate of the District:
And if the additional and altered work includes any class of work for which no rate is
specified in this contract then such class of work shall be carried out at the rates entered in
the Schedule of Rates of the Division or at the mutually agreed upon between the Executive
Engineer and the contractor whichever are lower. If the additional or altered work for which
no rate is entered in the Schedule of Rates of the Division is ordered to be carried out before
the rates agreed upon then the contractor -thin seven days of date of receipt by him of the
order to carry out the work inform the Executive Engineer does not agree to this rate he
shall be notice in writing be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided always that if
the rates shall have been determined as lastly herein before mentioned then in such case he
shall only be entitled to be paid in respect of the work carried out or expenditure incurred by
him prior to the date of the determination of the rate as aforesaid according to such rate or
rates as shall be fixed by the Executive Engineer. In the event of dispute, the decision of the
Superintending Engineer of the Circle will be final.
15. Extension of Time Limit in consequence of Addition or Alteration:
The time limit for the work shall be extended in the proportion that the increase in its cost
occasioned by alteration or addition bears to the cost of the original contract work and the
certificate of the Engineer-in Charge as to such proportion shall be conclusive.
16. No Compensation for Alteration in or Restriction of Work to be carried out:
If any time after the execution of the contract documents the Engineer-in-charge shall be for
any reason whatsoever require the whole or any part of the work as specified in the tender to
be stopped for any period or shall not require the whole or part of the work to be carried out
at all or to be carried out by the contractor he shall give notice in writing or the fact to the
contractor who shall thereupon suspend or stop the work totally or partially as the case may
be in any such case except as provide hereunder the advantage which he might have derive
from the execution of the work in full but which he did not so derive consequence of the full
amount of work not having been carried out or on account of any loss that he may be put to
on account of material purchased or agree to be purchased or for unemployment of labor
recruited by him. He shall not also have any claim for compensation by reason of any
alterations having been in the original specification drawings, designs, and instructions
which may involve any curtailment of the work as originally completed. Where, however,
materials have already been purchased or agreed to be purchased by the contractor before
receipt by him of said notice, the contractor shall be paid for such materials at the rate of
requirement and are of approved quality and/or shall be compensated for the loss, if any,
that the he may put to in respect of materials agreed to be purchased by him, the amount of
EW-273 PUR-F-006 RFQ-
such compensation to be determined by the Executive Engineer whose decision shall be final.
If the contractor suffers any loss on account of his having to pay, his labor charges during
the period during which the stoppage of work has been ordered under this clause the
contractor shall on application be entitle to such compensation on account of labor charges
as the Executive Engineer whose decision shall be final may consider reasonable provided
that the contractor shall be entitle to any compensation on account of labor charges if in the
opinion of the Executive Engineer , the labor could have been employed by the contractor
elsewhere for the whole part of the period during which the stoppage of the work has been
ordered as aforesaid.
17. No claim to compensation on account of loss due to delay of materials by
The contractor shall not be entitled to any claim any compensation from corporation for the
loss suffered by him on account of delay by corporation in the supply of materials entered
in Scheduled A where’ such delay is caused by:
(i) Difficulties relating to supply of railway wagons.
(ii) Force Major
(iii) Act of God
(iv) Any other reasonable cause beyond the control of corporation
In the case of such delay in the supply of materials.corporation shall grant such extension of
time for the completion of the works as shall appear to the Executive Engineer to be
reasonable in accordance with the circumstance of the case. The decision of the Executive
Engineer as to the extension of time shall be accepted as final by the contractor.
18. Time Limit for Compensation claims:
Under no circumstances whatsoever shall the contractor be entitled to any compensation
from corporation on any account unless the contractor has claimed in writing to the
Executive Engineer within one month of the cause thereof.
19. Action and Compensation payable in case of Bad Work:
At any time before the security deposit is refunded to the contractor shall appear the
Executive engineer or his subordinate in charge of the work that any work has been executed
with unsound imperfect or unskillful workmanship or with materials of inferior .quality or
that any materials or articles provided by him for the execution of the work are unsound or of
a quality inferior to that contract for or are otherwise not in accordance with the contract it
shall be lawful for Engineer-in-Charge to intimate this fact in writing to the contractor and
then notwithstanding the fact that the work materials or articles complained of may have
been inadvertently passed, certified and paid for, the contractor shall be bound forthwith to
rectify or remove and reconstruct the work so specific in whole or in part as the case may
require or if so required shall remove the materials or articles so specified and provide other
suitable materials or articles at his own charge and cost, and in the event of his failing to do
so within a period to be specified by the Engineer-in-Charge in the written intimation
aforesaid, the contractor shall be liable to pay compensation at the rate of one percent on the
amount of the estimate for every day not exceeding ten days during which the failure so
continues and in the event of any such failure as aforesaid the Executive Engineer may
rectify to get remove and re-execute the work and replace the materials or articles
complained of as the case may be at the risk and expense in all respects of contractor should
the Engineer -in-Charge consider that any such inferior work of materials as described above
may be accepted or made use of, it shill be within discretion to accept the same as such
reduce as he may fix thereof Provided that in the case of any work of which is visible check
is not possible if the Engineer-in-Charge or his subordinate in charge of the work feels that
such work has been executed with unsound, imperfect , unskillful workmanship or with
materials of interior quality, he shall take sample test at random, cost of which shall; have to
borne by the contractor and if after taking such test part of such work is found to be
defective in any respect of to have been executed with materials of inferior quality, then the
contractor shall be paid for the whole work such amount as may be fixed by the office on the
basis of the lowest quality of work found by him in such sample tests.
EW-273 PUR-F-006 RFQ-
Sample Test shall mean:
(i) In relation to poles fixed as line supports the token of one pole out of every 100 poles
after taking it out from its foundation for inspection.
(ii) In relation to any other work such test as may be considered necessary by the Engineer-
in-charge or his subordinate in charge of the work.
Cost of sample test shall mean cost incurred for the purpose of taking sample test and for
restoring the tested work to its original condition.
20. Work to be opened to inspection Contractor or Responsible Agent to be present:
All works under or in course of execution or executed in pursuance of the contract shall at
times be open to the inspection and supervision of the Executive Engineer and his
subordinate and contractor shall at all times during the usual working hours and at all
other times at which reasonable notice of the intention of the Executive Engineer or his
subordinate to visit the works shall have been given to the contractor, during which period
either he should be present to receive order and instruction or have a responsible agent duly
accredited in writing, present for that purpose. Orders given to the contractors duly
authorized agent shall be considered to have the same force and effect as if they had been
given to the contractor himself.
21. Notice to be given before work is covered up:
The contractor shall be given not less than five days notice in writing by the Executive
Engineer or subordinate In-charges of the work before covering up of otherwise placing
beyond the reach of measurement any work in order that the same may be measured and
correct dimension thereof taken before the same is so covered up or placed beyond the reach
of measurement and shall not and work without the consent in writing of Executive Engineer
or his subordinate in charge of the work. If any work shall be covered up or placed beyond
the reach without such notice having been given or consent obtained the same shall be
uncovered at the contractors expense, and in default thereof no payment or allowance shall
be made for such work or for the materials with the same was executed.
22. Contractors Liabilities:
The contractors shall supply at his own cost all materials (expect such special materials, if
any, as may be supplied from the corporation Stores in accordance with the contract plant
tools appliances, implements ladders, cordage, take scaffolding and any temporary works
which may be required for the proper execution of the work, in the original altered or
substituted from and whether included in the specification or other document forming part
of the contract or referred to in these conditions or note and which may be necessary for
the purpose of satisfying or complying with the requirement of the Engineer-in-charge as to
any matter on which under these conditions he is entitled to be satisfied or which he is
entitled to require together with carriage thereof to and from the work. The contractor shall
also supply without charge the requisite number of person with means and materials
necessary for purpose of setting out works, and accounting, weighing and assisting in the
measurement of examinations at any time and from time to time of the work or material.
Failing this the same may be provided by the Engineer-in-charge at the expenses of the
contractor and the expenses may be deducted form any money due to the contractor under
the contractor from his security deposit or the proceeds of sale thereof or of a sufficient
portion thereof. The contractor shall provide all necessary fencing and lights required to
protect the public from accident and shall also be bound to bear expenses of defense of every
suit, action or other legal proceedings at law that may be brought by any person for injury
sustained. Owing to neglect of the above precautions and to pay any such person or which
may be awarded in such suit, action or proceedings to any such Persons or which may with
the consent of the contractor be paid in compromising any claim by any such person.
23. Contractors Liable for all Damage:
Compensation for all damages done intentionally or unintentionally by contractor's laborer
whether in or beyond the limit of corporation’s property shall be estimated by the Executive
EW-273 PUR-F-006 RFQ-
Engineer, or such other officer as he may appoint and the estimates of the Executive
Engineer, subject to the decision of the Superintending Engineer, on appeal shall be final
and the contractor shall be bound to pay the amount of the assessed compensation demand
failing which, the same will be recovered from the contractor as damages or deducted by the
Engineer-in-charge from any sums that may be due to or become due from corporation to
the contractor under this contract or otherwise. The contractor shall bear the expense of
defending any action or other legal proceeding that may be brought by any person for injury
sustained by him owing to neglect of precautions to prevent the spread of fire and he shall
also pay any damages and cost that may be awarded by the court if in consequence.
24. Rescission of Contract and Forfeiture Deposit
The contractor shall not be assigned or subject without the written approval of the Engineer-
in-charge and if the contractor assign or subject his contract, or attempt to do so or become
insolvent or commence any Proceedings to be adjudicated as insolvent or make any
composition with creditors, attempt to do so the Engineer-in-charge may by notice in
writing, rescind the contract. Also, if any bribe gratuity, gift, loan, Perquisite, regard or
advantage pecuniary or otherwise shall either directly or indirectly be given promised or
offered by the contractor any of his servants, or agents, to any person in the employee of
corporation in any way directly or indirectly interested in the contract the Executive
Engineer may give 10 days notice in writing and rescind the contract. In the event of a
contract being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the discretion of corporation and the same consequences shall
ensure as if the contract has been -rescinded under Clause 4 thereof and in addition the
contractor shall not be entitled to recover or be paid for any work thereof actually performed
under the contract.
25. Compensation .
All sums payable by a contractor by way of compensation under any of these conditions shall
be considered as a reasonable compensation to be applied to the use of corporation without
reference to the actual loss or damage sustained and Whether any damage has not been
26. Changes In the Constitution of Firm to be notified.
In the case of tender by partners of a firm any change in the constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
27. Works under direction of Superintending Engineer.
All works be executed under the contract shall be executed under the direction and subject
to the approval of the Superintending Engineer of the Circle for the time being who shall be
entitled to direct at what point or points and in what manner they are to be commenced and
from time to time carried on.
28. Decision of superintending Engineer to be final.
Except where otherwise specified in contract and subject to the power delegated to him by
corporation under the corporation , then in force the decision of the Superintending
Engineer of the Circle for the time being shall be final conclusive and binding on all parties of
the contract upon all questions relating to the meaning for the specification, designs
drawings and instruction herein before mentioned and as to the quality of workmanship or
material used on the work or as to any other question, claim right matter or thing whatsoever
in any way arising or relating to the contract. designs, drawing specification estimates
instructions orders or these conditions or otherwise concerning, the works or the execution
or failure to execute the same whether arising during progress of the work or after the
completion on abandonment thereof.
29. Stores to be obtained from corporation
The contractor shall obtained from the corporation stores, such stores and articles as are
mentioned schedule A which may be required for the work or any part of the work or in
making up any articles required therefore or in connection therewith unless he has obtained
permission in writing from the Executive Engineer or obtained such stores and articles from
elsewhere. The value of such stores & articles as may be supplied to the contractor by the
EW-273 PUR-F-006 RFQ-
Engineer-in-charge will be debited to the contractor his account at the rate shown in the
schedule A attached to the contract and if they are not entered said schedule, they shall be
debited to him at cost price which for the purposes of this contract shall include cost of
carriage and all other expenses whatsoever which may have to be incurred in obtaining
delivery of the same at the stores aforesaid and further overhead charges 15%. The
contractor shall be responsible for the loss destruction or deterioration of the materials,
stores or articles supplied to him by the corporation even if such loss destruction or
deterioration has occurred under any articles so supplied were his property. The contractor
shall be responsible for returning the residual materials after completion of the contract
and if fails to return the balance materials supplied to him by the corporation the cost of the
of the residual materials will be recovered form the contractor at the market rate or stock
issue rate whichever is higher at the time of materials account plus 15%.
30. Lump Sum in Estimate.
(1) When the estimate on which tender is made includes lump sums in respect of parts of the
works contractor shall be entitled to payment in respect of the items or works involved or the
part of work in question at the same rates as are payable under this contract or such items
of the part the work in question is not in the opinion of the Engineer-in-charge capable of
measurement Engineer-in-charge and the certificate in writing of the Engineer-in-charge
shall be final & conclusive against the contractor with regard to any sum or sums payable to
him under provision of this clause.
Lump sum Tenders
(2) Whenever lump sum tenders have been invited for buildings or other structures of the
same type, design, the contractor shall submit his bill stated in Clause II and the Engineer-
in-charge not below the rank of Executive Engineer shall certify by general measurement or
by other method considered suitable to him, the value of work done and the contractor shall
be paid monthly a sum equal to. 90% of the total value the work so certified since the last
payment after deducting a part or whole of the secured advance if not already paid for the
materials utilized on the works. An additional secured advance for any fresh materials
brought on site will also be paid if certified by the office not below the rank of Executive
After the work is completed final bill would be paid on the certification of an officer not below
the rank of Executive Engineer, that the works are done according to drawing and
specifications attached to the tender if any additions and alteration have been carried out,
details measurement in respect thereof shall be recorded and extra payment of deductions
are regulated as per item rates quoted by the contractor while submitting the tender and if
there are any items in the additions and alteration for which the contractor has not quoted a
rate, the payment shall be regulated as per clause 14 above.
31. Action Where no Specification.
In the case of any class of work for which there is no such specification as is mentioned in
rule I such work shall be carried out in accordance with the divisional specifications and in
the event of absence of divisional specification the work shall be carried out in all respect in
accordance with the instructions and requirement of the Engineer-in-charge.
32. Compensation under Workmen’s Compensation Act.
The contractor shall be responsible for and shall pay any compensation to his workmen
payable under the workmen’s Compensation Act 1923 (VIII of 1923) (herein after called the
said Act) for injuries caused, to the workmen. If such compensation is paid by corporation as
principal under sub-section (1) of Section 12 of the said Act on behalf of the contractor, it
shall be recoverable by Corporation from the contract or under sub-section (2) of the said
section. The contractor shall pay such amount of compensation on demand failing which it
will be recovered from him by deducting it from any sums that may be due or become due to
the contractor by the corporation under this contract or otherwise.
33. No claim for Variation in quantities of work
Quantities shown in the tender are approximate and no claim shall be entertained Quantities
of work executed being either more or less than those entered in the tender or estimate.
EW-273 PUR-F-006 RFQ-
34. No claim for Compensation for Delay in execution of work
No compensation shall be allowed for any delay caused into starting of work on account of
acquisition of land and in the case of clearance works for any delay in according to sanction
35. No claim for Compensation for delay in execution of work
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow pits or compartment, the rates are inclusive for hard or cracked soil,
excavation in mud, subsoil water or water standing in borrow pits and no claim for an extra
rate shall be entertained unless otherwise expressly specified.
36. Entering upon or commencing any portion of work
The contractors shall not enter upon or commence any portion of work except with the
written authority any instructions of the Executive Engineer or his subordinate in charge of
the work fail in such authority the contractor shall have no claim to ask for measurement of
payment for work.
37. Method of Payment
Payment to contractors shall be made by cheques provided the amount exceeds Rs. 10/-
Amount not exceedingRs. 10/- will be paid in cash.
38. ACCEPTANCE OF CONDITIONS OF TENDERING FOR WORK
Submission to tender or acceptance of work order shall imply acceptance of those conditions
of tender by contractor.
39. Employment of Scarcity Labor
If Government declares a state of scarcity of famine to exist in any village situated within
miles of the work the piece worker/contractor shall employ upon such parts of the work as
are suitable for unskilled labor any person certified to him by the Executive Engineer or by
any person to whom Executive Engineer may have delegated this duty in writing to be in
need of relief and shall be bound to pay such person wage not below the minimum which
Government may have fixed in this behalf. Any disputes which arise in connection with the
implementation of this clause shall be decided by the Superintending Engineer whose
decision shall be final and binding on the piece worker/contractor
40 Employment of Technical Persons.
The contractors who are registered class ‘A’, ‘B’ and ‘C’ or such contractors who execute the
works of Rs. 5 lakhs and above shall employ the technically qualified personnel possessing
minimum a Diploma from a recognized Technical Institution executing the work of the
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW-273 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPEs
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.: ____________
Authorized signatory of M/s____________________________________
Hereby certify that following mentioned PPEs (as per ISI/DGMS/CE/EN/ANSI
approved only) must be issued to our all contract workers as per nature of hazards
before execution of work.
Sr. Name of PPE IS :Code no. of Make of Qty Unit
no. PPE PPE If our
1 Safety Helmet IS:2925 Nos. compa
2 Safety goggles with IS:5983:1980 Nos. ny is
Anti fog lens or EN:166 not
3 Reusable Ear Plug ANSI S3.19- Pair provid
352-2:2002 above
4 Dust Mask EN149:2001 Nos. mentio
5 Safety Shoes IS:15298 Pair good
6 Cur resistance Hand EN 388:2003 Pair quality
gloves Cut level-1 of
Officer and Factory manager shall be empowered to stop the work without any notice.
Seal of the Firm Signature of Authorized signatory
EW-273 PUR-F-006 RFQ-
ANNEXURE-II: SOP/JOB SAFETY ANALYSIS
Name of Job analyzed:
Tender No. /Work order No.
Name of Agency: Mobile No.
Name of Supervisor: Mobile No.
Name of Section/Department:
Job Location/Area:
Required PPEs and Emergency equipment :(1) Safety Helmet (2) Safety Shoes (3)
Safety Goggles (4) Reusable ear plug (5) Cut resistance hand gloves (6) Dust mask
Job Step Hazard Risk Level Control Measures Responsibility
Prepared by Checked By Approved By
DE / EE Safety Chief
SE ( ) Factory Manager
( ) Officer Engineer
EW-273 PUR-F-006 RFQ-
GSECL Contractor EH&S Performance Evaluation Form
Name of Contract Agency:
Contract work order No.
Date Evaluation Completed:
Work Description:
Name of Power Station:
Status of Work/ Project: _________% completed.
No. of person engaged during work contract:
Total Exposure hours worked on work order:
This evaluation must be completed by Concern EE & SE after completion of the Work
Contract /project and at pre-determined intervals (three months) as agreed upon at
the Pre-Job Mobilization Meeting.
Statistics Number Frequency
Environmental Excursions
Traffic Violations
The following categories should be rated for the Contractor’s overall
performance on the work order/ Project.
RATING (5 = Excellent; 4=Very Good 5 4 3 2
3=Good 2=Satisfactory 1 = Poor)
A. Adherence to Requirements:
Adherence to contract provisions for new
hire orientation.
Compliance to plant safety rules.
Compliance with industrial hygiene
Compliance with site contractor’s health and
safety guidelines.
Compliance with site permits.
Material Safety Data Sheets (MSDS)
Response to safety requests.
B. Housekeeping
Monthly housekeeping inspection results.
Overall site housekeeping practices.
Response to safety requests.
EW-273 PUR-F-006 RFQ-
Chemical hazard control
Fire control measures
Flammable and explosive materials control
General waste – trash collection
C. Injury Performance:
Contractor’s timely reporting of accidents
Contractor’s use of modified work program.
Contractor’s participation in accident
investigations.
Number of incidents observed and reported.
D. Contractor Safety Program:
On site safety officer.
All subcontractors employed by the
Contractor have been managed effectively
with reference to EHS and Quality (meets
company standards, practices and/or
Safety training for supervisors.
Substance abuse policy compliance.
Weekly toolbox meeting and/or participation.
Updates to written safety programs.
E. Tools and Equipment:
Availability of tools and equipment
Condition of contractor’s tools and
equipment by site and provincial Labour and
OH&S standards.
Maintenance of Equipment / Tools / etc.
Contractor’s knowledge and proper use of
Contractor’s equipment certification readily
Contractor’s materials
inspection/acceptance program followed.
F. Costs Within Expectations:
Contractor’s cost program.
Contractor’s reasonableness and/or
G. Execution of Work:
Contractor’s cooperation in handling change
Contractor’s efforts to eliminate
nonproductive time.
Contractor’s planning of work.
Relationship with other site contractors.
Contractor’s cooperation with our company
and other contractor personnel.
H. Key Field Personnel:
EW-273 PUR-F-006 RFQ-
Competence of main office staff and
Quality of first and second line supervision.
J. Labour Relations:
Contractor’s ability to anticipate problems.
Contractor’s efforts in exercising
management rights.
Contractor’s relationship with the building
K. Project management /Supervision:
Contractor’s efforts to use efficient crew size.
Control of subcontractors.
L. Quality of Craft Labour :
Contractor’s ability to obtain qualified
Quality of work.
Contractor’s adherence to schedule
N. Quality Control/Assurance:
Contractor’s equipment certification readily
Contractor’s material inspection /
acceptance program followed.
Contractor meets expectations on quality
O. Issues and Concerns:
Advises of potential problems.
Efficiency in handling paperwork.
Readiness to accept responsibility.
Reliability in dealings.
Response to site requests for action by the
supervisor/ management.
OVERALL PERFORMANCE:
Any specific issues or concerns with the contractor:
Would you hire this contractor again to do similar work:
How can this contractor improve on its past performance:
Evaluation carried out By:
Designation Executive Engineer Superintending Safety Officer
Date Completed:
EW-273 PUR-F-006 RFQ-
Work Agreement Format
STAMP PAPER OF RS. 300/-
This agreement is made at Gandhinagar the ___ day of ________________in the
Christian year two thousand and fourteen between M/s
“THE CONTRACTOR” which expression shall unless excluded by or repugnant to the
context include its successors or permitted assigns)of the one part and the Gujarat
State Electricity Corporation Ltd., having their Head office at Race course Baroda -7
(hereinafter called “GSECL” which expression shall unless excluded by or repugnant
to the context include- its successors or assigns) of the other part.
WHEREAS the aforesaid GSECL has accepted the tender of the aforesaid contractors
for work ______________________________________at GTPS as per GSECL’s order
_________________________________dtd.___________ hereinafter called ”The works” and
more particularly described enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule
of price which for the purpose of identification have been signed by Shri
____________________________________ On behalf of the contractors and by Chief
Engineer (Gen.) on behalf of GSECL a list where of is made out in the schedule
hereunder written and all of which said documents are deemed to form part of this
contract and included in the expression “THE WORKS” wherever herein used, upon
the terms and subject to the conditions herein after mentioned.
AND WHEREAS GSECL has accepted the tender of the contractors for the
construction/work, of the said works for the sum Rs.___________________(Rupees
___________________________only) upon the terms and subject to the conditions herein
NOW THIS AGREEMENT WITNESS AND IT IS HEREBY AGREED AND DECLARED
1. The contractors shall do and perform all works and things in this contract
mentioned and described or which are implied therein or thereof from respectively or
are reasonably necessary for the work as mentioned and at the times, in the manner
and subject to the terms condition s and stipulations contained in this contract, and
in consideration of the due provision, executions, work/ construction and completion
of the; works agreed to by the contractors as aforesaid, GSECL both hereby convenant
with the contractor to pay all the sums of moneys as and when they become due and
payable to the contractor under the provisions of the contract Such payments to be
made at such times and in such manner as is provided by the contract.
2. This conditions and convenants stipulated herein before in this contract are
subject to and without prejudice to the rights of GSECL to enforce penalty for delays
and/or any other rights what so ever including the right to reject and cancel on default
or breach by the contractors of the conditions and the covenants as stipulated in the
general conditions, specifications, forms or tender, schedule drawing etc. attached
with GSECL’s order No
EW-273 PUR-F-006 RFQ-
3. The contract value, extent of supply delivery dates, specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be
deemed or constructed to means or apply to affect or alter other terms and conditions
of the contract and the general conditions and the contract so altered or revised shall
be and shall always be deemed to have been subject to and without prejudice to said
List of documents forming part of the contract :-
1. Original tender
3. Tender & contract for works booklet.
4. General specifications for civil works book.
In witness whereof the parties hereto have set their hands and seals this day,
month and year first above written.
1. Signed, Sealed and delivered by (Contractor)
(Signature with Name, Designation & official seal / stamp)
(Contractor) (Complete Name, Address of the authorised person of the
Supplier with Authority letter or Board’s Resolution in case of company)
In the presence of Name, full Address & Signatures:
EW-273 PUR-F-006 RFQ-
2. Signed, Sealed and Delivered by (Purchaser-GSECL):
(Signature with Name, Designation & official seal / stamp)
For and on behalf of ____________________________________________ (Purchaser-
(Complete Name, Designation & Location / Address of the authorized
officer as per DOP of the Purchaser Company)
In the presence of Name, full Address & Signatures:
EW-273 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
(Price Bid should be submitted by bidders directly online. Bidder should not submit
physical Price Bid.)
Work of Inspection & Repairing of Parting Plate and Tube
EW-273 leakage checking & attending of HP Heaters 5 & 6 of Unit No
3, 4 & 5 at GTPS during AOH/COH and as & when.
Offered GST Unit
Rate Applicabl Rate
SAC/ per Unit e With GST
Sr. Qty. Amount Amount
Description UOM HSN in Rs. [in in Rs.
Code Withou Percenta (D)
t Tax ge %] =(B)+
Inspection & Attending/
Repairing of HP Heater
No 5 & 6 Parting Plate
1 leakages by Cutting / 10 No. To be quoted in attached Price break up
Welding / Repairing of
plates as per Scope of
Work and Inst. of EIC.
(1) Goods and service tax:- The GST rate will be paid extra as applicable in accordance
with GST rules party shall have to raise the invoice in duplicate as per GST rules.
The supplier/contractor should mention separate HSN/SAC code and rate of GST
and cess as applicable for each item of goods/services. If no specifically mentioned
then company will have option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of tenders.
(2) Payment Terms: Party has to accept payment terms as per GSECL rules only i.e. as
per actual work done. NO ADVANCE payment will be allowed.Net Payment will be
released within 30 days after completion of work and submitting their relevant
(3) L1 is considered on over all lowest quoted party.
(4) Quantity mentioned is tentative; however payment will be done as per actual
executed quantity.
(5) GST No. & SAC/HSN Code must be required in Bill/Invoice.
Chief Engineer (Gen)
Contractor’s Signature
With Seal & Date
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-273_28_03_2026.pdf
Download all tender documents and submit your bid