Loading…
Loading…
Tender ID
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
16 Mar 2026, 6:00 pmClosed
Executive Engineer Public Health Work Division, Morbi
Work for Providing, supply & L, L & J of Various Dia. PVC - 6 Pipeline For Villages of Kadiyana HW village level sump to distribution system Under M & R to NCD-4 RWSS.
283655
13/2025-26 (2nd Attempt)
Open
Water Supply/ Sanitation Works
Works
Morbi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, P.H.Works division, G.W.S.S.B., Morbi
₹7,500
Yes
6 Mar 2026
6 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Name of work: - “Providing, supply & L, L & J of Various Dia. PVC - 6 Pipeline For
fVillages of Kadiyana HW village level sump to distribution system Under M & R to
Taluka: Halvad District: Morbi.
Estimated Cost: - Rs.
Gujarat Water Supply & Sewerage Board
Zone –3, Rajkot.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
THIS PAGE IS LEFT INTENTIONALLY BLANK
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
SUMMARY OF - Grand Summary of Schedules (Covering
Schedule – A Nil
Schedule - B Breakup of Cost for Construction Phase &
Operation and Maintenance.
Schedule B- “Work for Providing, supply
& L, L & J of Various Dia. PVC -
Pipeline For Villages of Kadiyana HW
village level sump to distribution system
Under M & R to NCD-4 RWSS."
Ta.: Halvad, Dist.: Morbi
Schedule of Payment for Works
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
Name of work :- Work for Providing, supply & L, L & J of Various Dia. PVC -
Pipeline For Villages of Kadiyana HW village level sump to distribution system
Under M & R to NCD-4 RWSS.
Taluka: Halvad, District: Morbi.
1. The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
2. The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B ( Schedule B1, Schedule B2...., Schedule C), rates and prices
received in any other formats will be rejected and the Bids will be disqualified.
a. The Schedule-B shall constitute the price summary
b. The Schedule-B1, Schedule-B2, Schkedule-B3.... & Schedule-C etc shall constitute the
price breakup for Civil, Mechanical, Electrical, O&M works.
3. It will be entirely at the discretion of the Employer to accept or reject the bidder’s proposal,
without giving any reasons whatsoever and the bidder shall not be permitted to withdraw
his bid on this account.
supplied from the by client.
5. In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as called
for against the BOQ item.
B only will be considered for price evaluation & shall form a part of the Contract Agreement.
8. The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder shall
give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
separately for Schedule-C. The total shall be in line to the price quoted in Schedule-C. The
total shall be carried forward to Schedule-B for comparison and evaluation.
9. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
10. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis.
The item shall not be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item description is for
subject matter guidance only; clause references are indicative only and all other relevant
clauses shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the bidder shall be
deemed to have covered the cost of execution of such items (according to the requirements
of the bid document) in the prices quoted for other items.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
satisfactory working/safety of the system as specified, will not be separately paid for by the
Employer when executed and shall be deemed to be already covered by other items and
rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
during the pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
arithmetic corrections if any will be considered for financial evaluation of the bid.
13. Schedule ‘D gives the basis of interim payment for construction of civil works.
14. The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting out
that may be required to be carried out for laying out of all the works involved.
15. Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
17. The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
18. The prices quoted shall also include the cost of materials utilized for testing.
19. The bidder should acquaint himself with the site conditions including the access to Work
site. The successful bidder shall have to make suitable access to work sites at his own
cost. These accesses will be used by the other contractors working for GWSSB.
shall include all the equipments / materials / accessories and services required as per the
21. The amount to be quoted for O & M / year shall be as per Volume-IB, General Conditions of
Contract, Clause No. 1, Security Deposit.
22. 1% of the value of work will be deducted from the Running bill against labour cess which is
23. Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the same
will be borne by GWSSB.
24. Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to misinformation
shall be recovered from the contractor.
25. The prices shall be quoted exclusive of all taxes, royalties and duties prevailing at the time
of submission of the bids. Statutory variation if any during the currency of contract shall
have to borne by the agency which shall be not reimbursed by the GWSSB.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
26. The rates should be quoted exclusive of GST and all other taxes as per Volume-II(A),
General Conditions of Contract, Clause No.
27. The Ministry of Finance and Company Affairs, Department of Revenue, Government of
India has issued a notification No. 6/2007-Central Excise Circular No. 6/2007, dated 1th
March 2007 regarding the Central Excise Duty Exemption. By this notification, the
notification 659/50/2002 dated 6th September, 2002 has been amended and the earlier
notification 26/2009 dated 4th December, 2009 has been amended and the Items of
materials, instruments, apparatus and appliance, ancillary equipments and their
components/parts, etc. for setting up of Water Treatment Plants and the Pipes needed for
delivery of water from its source to the Plant and from there to the Storage facility (as
mentioned in notification No.6/2007) are exempted from Central Excise Duty subject to the
Certification by the Collector/ District Magistrate/ Deputy Commissioner of the District,
regarding its use on such Projects. Necessary Project Authority Certificate shall be made
available to the Contractor, as per the prevailing rules, to facilitate him to avail the benefit in
terms of Exemption of Central Excise. ( Circulars attached herewith )
28. The Bidders shall have to quote the rates in this tender keeping in view of the Probable
rebate available to them as per the above Circulars of Government of India. The liability of
the Department is limited to issuing the Project Authority Certificate to the Contractor and
the Department does not take any responsibility whether the Agency gets the Excise
Exemption or not. The Complete responsibility rests with the Contractor/Agency only.
29. The process requires that the bidder shall quote his price for the work components
during the entire period of performance of the contract except price variation allowed for
supply of MS/DI/PVC/HDPE pipe as per Volume-II(A), General Conditions of Contract.
30. Payment shall be made for the components for which lump sump prices are quoted, as per
the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
31. Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-
1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be recovered
from the final bill before releasing the security deposit of the work. The contractor shall
furnish the statement showing the quantity of quarried materials / minerals from whom
purchased ( with full address of the seller) and copies of the bills for purchase to the
Executive Engineer of the in charge of the work. The contractor shall also furnished such
additional information as regards royalty payment to the competent authority.
32. Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be rest with
the agency and required amount shall be recovered from any due amount of the agency.
33. GWSSB can recover penalty amount from the agency for not taking the insurance. Though
the penalty amount is recovered, responsibility of the agency for taking insurance shall be
continued and will not be escaped from the responsibility.
34. The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open for
the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment details and
such other documents as may be required for the purpose.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
35. The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of claim amount to be recovered or reimbursed shall
be of the competent authority of the GWSSB and shall be binding on the contractor.
Signature of Contractor Deputy Executive Engineer Executive Engineer
P.H.S. Sub Division No. 1 P.H.W. Division
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
2. BID FORM (WITH PRICE)
Bidders are required to fill up all the blank spaces in this Bid Form.
SUB : Name of work- “Work for Providing, supply & L, L & J of Various Dia.
PVC - 6 Pipeline For Villages of Kadiyana HW village level sump to
distribution system Under M & R to NCD-4 RWSS."
Taluka:Halvad District: Morbi.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission,
operate, maintain and Run the whole of the said works for 04 (Four) Months from the date
of commissioning including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to Price
Nos.____________________ (insert numbers) for Lump sum fixed price of
____) for Construction including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract with in ......... Months, inclusive of monsoons, from the date or receipt of Letter
of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of
bid and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the Clause 1 of Volume-IB, General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
Gujarat Water Supply & Sewerage Board
Work for Providing, supply & L, L & J of Various Dia. PVC - 6 Pipeline For Villages of
Kadiyana HW village level sump to distribution system Under M & R to NCD-4 RWSS.
Ta.Halvad, Dist.Morbi
Schedule showing approximate Quantities of materials to be supplied by the department for the
work to be carried out in this contract and rates which they are to be charged.
Sr. Particulars Qty in Rate of Per Place of
No. Meter Materials Delivery
1) The contractor submitting the tender should see that the rates in Schedule-A are filled in by the
Engineer-in-Charge at the time of issue of tender.
2) Materials to be supplied to the Contractor for work are mentioned in Schedule-A.
3) Other pipes jointing material such as twisted hemp yarn bolts, nuts and washer and various size
rubber packing Zink white etc. shall be supplied by the contract or at his own cost. This shall be of
the best quality & get previously approve by the Engineer-in-Charge.
4) Any additional pipes special not mentioned in Schedule-A but found necessary at time of
execution shall be provided to the contractor at free of cost for labour work.
5) Contractor shall provide his own arrangement at his own cost for loading, unloading &
transporting safety to the site of work for the materials mentioned in Schedule-A.
6) Any materials required for other than labour items mentioned above and materials is not
included in Schedule-A. If such materials available with the département will be issue in request
from the contractor (for use of works under this contract) only at prevailing market rate or at the
depart. Issue rates which is higher plus departement charged liable under the rule in force.
7) Clause No.12.A of B form shall be applicable in case of materials mentioned above issued free to
cost of the contractor for use in the work. The issue rates for free of cost materials are as under and
in case of non return of surplus materials the recovery shall be made doubled of the issue rate.
8) The material issued by deparetment for this work and remaining unused material shall be
returned to the department in good and acceptable condition by the contractor. Any such unused
materials not returned by the contractor will be recovered at the double rate than the GWSSB SOR
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
rate (with exise duty) of year 2014-15.
9) Contractor shall have to buy and bring ordinary Portland cement as per IS-812-1989 and is
12269-1987 or its latest revision with IS mark and steel from open market and produce the bill of
purchase alongwith necessasry test certificate at the time of claiming the bill.
Signature of Contractor Deputy Executive Engineer
P.H.S. Sub Division No.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
Estimate for providing, supply & L, L & J of Various Dia. PVC - 6 Pipeline For
Villages of Kadiyana HW villege level sump to distribution system Under M &
R to NCD-4 RWSS.
Taluka:- Halvad Dist.:- Morbi
Qty Unit Item Rate Per Amount
Item No.1 :- Providing and supplying in standard
length ISI mark rigid unplasticised PVC pipes
suitable for potable water with ring fit joint
including cost of rings, as per IS specification no.
4985/1988 including all local and central taxes,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to the
departmental stores and including cost of
jointing meterial etc. complete.
(A) PVC pipe of test pressure of 6kg/cm^2
850.00 RMt. 140mm dia. PVC- 6 kg/cm^2 326.00 RMt.
350.00 RMt. 160mm dia. PVC- 6 kg/cm^2 420.00 RMt.
Item No.2 :- Providing and supplying at store or
site of work incl. freigtht, loading,unloading
stacking insurance and all taxes etc complete.
10.00 No PVC coupler 6kg/cm2 (fabricated)- 140 mm 295.00 No
5.00 No PVC Tee 140 X 140 mm (moulded) 6kg/cm2 679.00 No
25.00 No PVC Bend 90 degree 6kg/cm2 (fabricated)- 140 1037.00 No
10.00 No PVC coupler 6kg/cm2 (fabricated)- 160 mm 439.00 No
10.00 No PVC Bend 90 degree 6kg/cm2 (fabricated)- 160 1637.00 No
Item No.3 :- Excavation for pipe line trenches for
water supply, sewerage line, manhole etc. all
with shoring and struting if required as per
required gradient and line including safety
provisions using site rails and stacking excavated
stuff including up to all required lead cleaning
the site etc. complete for all lifts and strata as
(A) Upto 1.50 mt depth
354.00 CuM A.In all sorts of soil and soft murrum 89.00 CuM
266.00 CuM B. In Hard murrum, boulders, inlc Macadam Road 135.00 CuM
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
177.00 CuM C. in soft Rock and / or masonry in C.M. or L.M.or 163.00 CuM
89.00 CuM D. in Hard Rock and / or in C.C.1:2:4 or 372.00 CuM
R.C.C.With blasting and Chiseling or by Chiseling
Item No.4 :- Lowering, laying, fixing and jointing
PVC/uPVC/ pipes and specials of following class
and diameter including cost of conveyance from
stores to site of works including cost of labour,
material, cement solvent, giving satisfactory
hydraulic testing as per ISI code.
(A) PVC Pipe of test pressure of 6 kg/cm^2
150.00 RMt Kadiyana village sump to distribution 140 mm 23.00 RMt
Dia PVC-6kg/cm^2
200.00 RMt Susvav village sump to distribution 140 mm Dia 23.00 RMt
500.00 RMt Ishwarnagar village sump to distribution 140 23.00 RMt
mm Dia PVC-6kg/cm^2
350.00 RMt Sundargadh village sump to distribution 160 mm 28.00 RMt
Dia PVC-6kg/cm^2
24.00 CuM Item No.5 :- Providing CC M 100 for encasing 4113.80 CuM
pipes using trap metal size 12 mm to 50 mm incl.
form work curing consolidation etc complete for
various location on pipe line
842.00 CuM Item No.6 :- Refilling the pipeline trenches incl. 22.00 CuM
ramming, watering, consolidating disposal of
surplus stuff as directed within a radius of 3 km.
Refilling as directed
I/We am/are willing to carry out the work at % above/below percentage (should be written in
figure & words) above/below the estimated rates mentioned above/below amount of my/our tender worked out as
Estimated Amount put to tender Estimated Amount put to tender.
Rs. Add. % Rs. Deduct %
Above Rs. Below Rs.
Total Rs. Total Rs.
(In words Rupees (In words Rupees
Signature of Contractor Deputy Executive Engineer
P.H.S. Sub Division No.
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in
the measurement books in the form and by the method approved by the Employer's
Representative, and signed jointly by both the parties.
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Percentage Payment to be
Item Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation,Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
Note: (Maximum 10 Km. of unlaid pipe will be paid) - to be kept for bulk pipeline Projects
2 VALVES/Air Valves
a On receipt of materials on site 70 % of Quoted rate
Volume III: Price Bid Pipeline For Villages of Kadiyana HW
Percentage Payment to be
Item Description of Items
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
Signature of Contractor Deputy Executive Engineer
P.H.S. Sub Division No.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
F.01 VOL IA Technical Bid Kadiyana HW.pdf
F.02 VOL 1 B GCC Kadiyana HW.pdf
F.03 Preamble to Price Bid (Volume-III) Kadiyana HW.pdf
F.04 Technical Specification Kadiyana HW.pdf
all GR.pdf
Price Variation Paripatra 2023.pdf
SD-EMD GR 03-May-2025.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .