| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.5 LAccepted-AOC | L-1 | Accepted-AOC Successful L-1 Bidder | |
| 2 | Rejected-Technical AL GIDDI A ARGADA PO ARGADA DISTT RAMGARH PIN 829108 | ARGADA | RAMGARH | JHARKHAND | 829108 | - | Rejected-Technical Unsuccessful Bidder | |
| 3 | Rejected-Technical SIRKA PO ARGADA DIST RAMGARH JHARKHAND | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical Unsuccessful Bidder |
Tender Value
₹27.0 L
EMD Value
₹33,800
Closing Date
21 Nov 2022, 11:00 amClosed
Staff Officer (Civil), Argada area
Civil Office, GM Unit, Argada area GM Unit, Argada area, CCL, Sirka-829101.
Provision of approach road with guard wall at Religara weighbridge under Religara Project, Argada Area.
2022_CCL_261733_1
SO(C)(A)/e-Tender51/2022-23/ 2491
Open Tender
Civil Works - Others
Item Rate
60 days
Religara
Please refer Tender documents.
3 documents required · 3 mandatory
₹33,800
12 Mar 2023
10 Nov 2022
22 Nov 2022
11 Nov 2022
21 Nov 2022
11 Nov 2022
11 Nov 2022 - 18 Nov 2022
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) : Mechanical Means : Depth upto 3 m
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) : for grading- II Material
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form for removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete : Thermo-Mechanically Treated bars.
PART-B( GUARD WALL) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. : All kinds of soil.
Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centring, shuttering : 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form for removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Centring and shuttering including strutting, propping etc. and removal of form for removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete : Thermo-Mechanically Treated bars.
Finishing walls with Delux Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @ 0.75 ltr / 10 sqm
Total impact of GST for the purpose of CTC
HARIOM CONSTRUCTION
M/S DINESHWAR MAHTO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_270684.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .